Période

865 résultats pour : demolition work

  • Page
  • sur
  • 9
Connectez-vous pour plus de résultats
After the partial collapse of the Carola Bridge, demolition work continues on a dam built directly
BRK25H16_127

After the partial collapse of the Carola Bridge, d...

Germany, Berlin, 23 October 1991, Demolition of the Lenin monument on Leninplatz in Berlin
BRK25H16_481

Germany, Berlin, 23 October 1991, Demolition of th...

Demolition work continues after the partial collapse of the Carola Bridge. Further bridge segments
BRK25G61_252

Demolition work continues after the partial collap...

After the collapse of parts of the Carola Bridge, demolition work began on the Old Town side. The
BRK25G75_494

After the collapse of parts of the Carola Bridge, ...

After the collapse of parts of the Carola Bridge, demolition work began on the Old Town side. The
BRK25G75_495

After the collapse of parts of the Carola Bridge, ...

Block of flats demolition
BRK25G69_456

Block of flats demolition

Following the partial collapse of the Carola Bridge, demolition work is continuing. The bridge has
BRK25G72_195

Following the partial collapse of the Carola Bridg...

Demolition work continues after the partial collapse of the Carola Bridge. Further bridge segments
BRK25G65_099

Demolition work continues after the partial collap...

An indoor environmental quality assessor is viewed up-close, working beneath timber floor joists
BRK25G75_078

An indoor environmental quality assessor is viewed...

A section of the Carola Bridge has collapsed. Over a length of around 100 metres, the section on
BRK25G75_497

A section of the Carola Bridge has collapsed. Over...

Old partially collapsed house in the city centre of Magdeburg
BRK25G05_456

Old partially collapsed house in the city centre o...

After the collapse of parts of the Carola Bridge, demolition work began on the Old Town side. The
BRK25G49_439

After the collapse of parts of the Carola Bridge, ...

Partial collapse of the Carola Bridge. Over a length of around 100 metres, the section on which the
BRK25G14_069

Partial collapse of the Carola Bridge. Over a leng...

After the partial collapse of the Carola Bridge, demolition work continues on a dam built directly
BRK25G18_152

After the partial collapse of the Carola Bridge, d...

After the collapse of parts of the Carola Bridge, demolition work began on the Old Town side. The
BRK25G38_499

After the collapse of parts of the Carola Bridge, ...

04.08.2012, Chongqing, China, Asia, Men sit on the steps in front of an old house in the old town
BRK25G43_309

04.08.2012, Chongqing, China, Asia, Men sit on the...

Demolition work, motorway construction site Berlin, A 100 at ICC, Berlin, Germany, Europe
BRK25F50_290

Demolition work, motorway construction site Berlin...

After the collapse of parts of the Carola Bridge, demolition work began on the Old Town side. The
BRK25F51_017

After the collapse of parts of the Carola Bridge, ...

After the partial collapse of the Carola Bridge, a dam was built for the demolition work on the
BRK25F62_210

After the partial collapse of the Carola Bridge, a...

Excavators on a building site demolishing a house, creating space for new flats and living space
BRK25F58_378

Excavators on a building site demolishing a house,...

Block of flats demolition
BRK25F97_080

Block of flats demolition

Demolition work continues after the partial collapse of the Carola Bridge, Dresden, Saxony,
BRK25F01_146

Demolition work continues after the partial collap...

After the partial collapse of the Carola Bridge, demolition work was prepared, Dresden, Saxony,
BRK25F00_483

After the partial collapse of the Carola Bridge, d...

A section of the Carola Bridge has collapsed. Over a length of around 100 metres, the section on
BRK25F24_373

A section of the Carola Bridge has collapsed. Over...

A section of the Carola Bridge has collapsed. Over a length of around 100 metres, the section on
BRK25F24_374

A section of the Carola Bridge has collapsed. Over...

Following the partial collapse of the Carola Bridge, demolition work is being prepared. The
BRK25F24_464

Following the partial collapse of the Carola Bridg...

Partial collapse of the Carola Bridge. Over a length of around 100 metres, the section on which the
BRK25F30_007

Partial collapse of the Carola Bridge. Over a leng...

Following investigations of another reinforced concrete bridge in Saxony and the cracks caused by
BRK25F10_055

Following investigations of another reinforced con...

An older office building is demolished. Demolition instead of renovation Austria
BRK25F10_350

An older office building is demolished. Demolition...

Following the collapse of parts of the Carola Bridge, demolition work began on the Old Town side.
BRK25F24_367

Following the collapse of parts of the Carola Brid...

After the collapse of parts of the Carola Bridge, demolition work began on the Old Town side. The
BRK25F34_199

After the collapse of parts of the Carola Bridge, ...

Following investigations of another reinforced concrete bridge in Saxony and the cracks caused by
BRK25F34_201

Following investigations of another reinforced con...

After the collapse of parts of the Carola Bridge, demolition work began on the Old Town side. The
BRK25F45_030

After the collapse of parts of the Carola Bridge, ...

After the collapse of parts of the Carola Bridge, demolition work began on the Old Town side. The
BRK25F30_230

After the collapse of parts of the Carola Bridge, ...

In the early hours of the morning, a section of the Carola Bridge collapsed for unknown reasons.
BRK25E76_275

In the early hours of the morning, a section of th...

Paris, 1868, Demolition of the Capuchin Convent in the Rue de la Paix, France, Historic, digitally
BRK25E53_372

Paris, 1868, Demolition of the Capuchin Convent in...

Demolished tower of a 20 year old wind turbine, in the Werl wind farm, 5 old Enercon E-66 turbines
BRK25E75_342

Demolished tower of a 20 year old wind turbine, in...

Demolished tower of a 20 year old wind turbine, in the Werl wind farm, 5 old Enercon E-66 turbines
BRK25E76_331

Demolished tower of a 20 year old wind turbine, in...

After the partial collapse of the Carola Bridge, the demolition work was prepared... Elbdampfer,
BRK25E50_308

After the partial collapse of the Carola Bridge, t...

After the partial collapse of the Carola Bridge, a dam was built for the demolition work on the
BRK25E50_452

After the partial collapse of the Carola Bridge, a...

Due to an as yet unknown cause, a section of the Carola Bridge collapsed in the early hours of the
BRK25E52_250

Due to an as yet unknown cause, a section of the C...

Demolition work on a former barracks, Augsburg, Bavaria, Germany, Europe
BRK25E61_426

Demolition work on a former barracks, Augsburg, Ba...

After the partial collapse of the Carola Bridge, a dam was built for the demolition work on the
BRK25E89_317

After the partial collapse of the Carola Bridge, a...

Following investigations of another reinforced concrete bridge in Saxony and the cracks caused by
BRK25E51_093

Following investigations of another reinforced con...

Demolition of the tower of a 20 year old wind turbine, in the Werl wind farm, 5 old Enercon E-66
BRK25E64_329

Demolition of the tower of a 20 year old wind turb...

Demolition of the tower of a 20 year old wind turbine, in the Werl wind farm, 5 old Enercon E-66
BRK25E65_100

Demolition of the tower of a 20 year old wind turb...

Demolition work on a former barracks, Augsburg, Bavaria, Germany, Europe
BRK25E64_002

Demolition work on a former barracks, Augsburg, Ba...

Demolished tower of a 20 year old wind turbine, in the Werl wind farm, 5 old Enercon E-66 turbines
BRK25E64_330

Demolished tower of a 20 year old wind turbine, in...

Partial collapse of the Carola Bridge. Over a length of around 100 metres, the section on which the
BRK25E50_267

Partial collapse of the Carola Bridge. Over a leng...

Demolition work on a former barracks, Augsburg, Bavaria, Germany, Europe
BRK25E57_419

Demolition work on a former barracks, Augsburg, Ba...

The Bridge of Solidarity, the longest tied-arch bridge in Germany, over the Rhine from
BRK25E76_354

The Bridge of Solidarity, the longest tied-arch br...

The Bridge of Solidarity, the longest tied-arch bridge in Germany, over the Rhine from
BRK25E76_355

The Bridge of Solidarity, the longest tied-arch br...

Excavators on a building site demolishing a house, creating space for new flats and living space
BRK25E96_010

Excavators on a building site demolishing a house,...

Following investigations of another reinforced concrete bridge in Saxony and the cracks caused by
BRK25E50_422

Following investigations of another reinforced con...

Celebrated demolition of the Atarazanas Fortress in Barcelona, 1869, Spain, Historic, digitally
BRK25E53_371

Celebrated demolition of the Atarazanas Fortress i...

Repowering, dismantled Enercon E-58 wind turbine in a wind farm near Issum, 9 older wind turbines
BRK25E29_318

Repowering, dismantled Enercon E-58 wind turbine i...

Demolition of the old A40 Rhine bridge Neuenkamp, next to it the first part of the new motorway
BRK25E30_207

Demolition of the old A40 Rhine bridge Neuenkamp, ...

Wind turbine repowering, in the Issum-Oermten wind farm, 9 wind turbines in operation for over 20
BRK25E31_342

Wind turbine repowering, in the Issum-Oermten wind...

Demolition of the tower of a 20 year old wind turbine, in the Werl wind farm, 5 old Enercon E-66
BRK25E31_343

Demolition of the tower of a 20 year old wind turb...

Piers and stay cables of the new motorway bridge of the A40, over the Rhine near Duisburg,
BRK25E37_013

Piers and stay cables of the new motorway bridge o...

The new Rhine bridge Neuenkamp, the A40, white pillar ropes, and the old motorway bridge, which is
BRK25E06_364

The new Rhine bridge Neuenkamp, the A40, white pil...

Due to an as yet unknown cause, a section of the Carola Bridge collapsed in the early hours of the
BRK25E37_408

Due to an as yet unknown cause, a section of the C...

In the early hours of the morning, a section of the Carola Bridge collapsed for unknown reasons.
BRK25E03_191

In the early hours of the morning, a section of th...

Due to an as yet unknown cause, a section of the Carola Bridge collapsed in the early hours of the
BRK25E38_202

Due to an as yet unknown cause, a section of the C...

Demolished tower of a 20 year old wind turbine, in the Werl wind farm, 5 old Enercon E-66 turbines
BRK25E05_210

Demolished tower of a 20 year old wind turbine, in...

Demolition of the tower of a 20 year old wind turbine, in the Werl wind farm, 5 old Enercon E-66
BRK25E06_319

Demolition of the tower of a 20 year old wind turb...

The new Rhine bridge Neuenkamp, the A40, white pillar ropes, and the old motorway bridge, which is
BRK25E44_163

The new Rhine bridge Neuenkamp, the A40, white pil...

The new Rhine bridge Neuenkamp, the A40, white pillar ropes, and the old motorway bridge, which is
BRK25E03_318

The new Rhine bridge Neuenkamp, the A40, white pil...

Demolished tower of a 20 year old wind turbine, in the Werl wind farm, 5 old Enercon E-66 turbines
BRK25E30_152

Demolished tower of a 20 year old wind turbine, in...

Wind turbine repowering, in the Issum-Oermten wind farm, 9 wind turbines in operation for over 20
BRK25E45_466

Wind turbine repowering, in the Issum-Oermten wind...

Demolished tower of a 20 year old wind turbine, in the Werl wind farm, 5 old Enercon E-66 turbines
BRK25E13_199

Demolished tower of a 20 year old wind turbine, in...

Demolished tower of a 20 year old wind turbine, in the Werl wind farm, 5 old Enercon E-66 turbines
BRK25E20_294

Demolished tower of a 20 year old wind turbine, in...

Repowering of a wind farm near Issum, 9 older wind turbines from the manufacturer Enercon (model
BRK25E45_463

Repowering of a wind farm near Issum, 9 older wind...

The Bridge of Solidarity, the longest tied-arch bridge in Germany, over the Rhine from
BRK25E47_003

The Bridge of Solidarity, the longest tied-arch br...

Demolition of the former RWE building complex, in the city centre, on the A40 motorway in Essen,
BRK25E44_187

Demolition of the former RWE building complex, in ...

Demolition of the former RWE building complex, in the city centre, on the A40 motorway in Essen,
BRK25E05_162

Demolition of the former RWE building complex, in ...

The new Rhine bridge Neuenkamp, the A40, white pillar ropes, and the old motorway bridge, which is
BRK25E47_455

The new Rhine bridge Neuenkamp, the A40, white pil...

Demolition work, motorway construction site Berlin, A 100 at ICC, Berlin, Germany, Europe
BRK25E26_021

Demolition work, motorway construction site Berlin...

Paris, 1868, Demolition of the Capuchin Convent in the Rue de la Paix, France, Historic, digitally
BRK25E42_116

Paris, 1868, Demolition of the Capuchin Convent in...

Demolished tower of a 20 year old wind turbine, in the Werl wind farm, 5 old Enercon E-66 turbines
BRK25E05_209

Demolished tower of a 20 year old wind turbine, in...

Demolished tower of a 20 year old wind turbine, in the Werl wind farm, 5 old Enercon E-66 turbines
BRK25E08_101

Demolished tower of a 20 year old wind turbine, in...

Due to an as yet unknown cause, a section of the Carola Bridge collapsed in the early hours of the
BRK25E37_407

Due to an as yet unknown cause, a section of the C...

Repowering of a wind farm near Issum, 9 older wind turbines from the manufacturer Enercon (model
BRK25E41_203

Repowering of a wind farm near Issum, 9 older wind...

Landscape view of a large construction site in the countryside, surrounded by houses and a cloudy
BRK25E37_217

Landscape view of a large construction site in the...

In the early hours of the morning, a section of the Carola Bridge collapsed for unknown reasons.
BRK25D89_388

In the early hours of the morning, a section of th...

In the early hours of the morning, a section of the Carola Bridge collapsed for unknown reasons.
BRK25D91_013

In the early hours of the morning, a section of th...

In the early hours of the morning, a section of the Carola Bridge collapsed for unknown reasons.
BRK25D81_011

In the early hours of the morning, a section of th...

Demolition of the old Rhine bridge Neuenkamp, the A40, behind the first of 2 new bridges, which is
BRK25D81_117

Demolition of the old Rhine bridge Neuenkamp, the ...

In the early hours of the morning, a section of the Carola Bridge collapsed for unknown reasons.
BRK25D83_365

In the early hours of the morning, a section of th...

Motorway construction site Berlin, A 100 at ICC, Berlin, Germany, Europe
BRK25D78_269

Motorway construction site Berlin, A 100 at ICC, B...

Due to an as yet unknown cause, a section of the Carola Bridge collapsed in the early hours of the
BRK25D89_387

Due to an as yet unknown cause, a section of the C...

The Bridge of Solidarity, the longest tied-arch bridge in Germany, over the Rhine from
BRK25D88_266

The Bridge of Solidarity, the longest tied-arch br...

Partial collapse of the Carola Bridge. Over a length of around 100 metres, the section on which the
BRK25D51_416

Partial collapse of the Carola Bridge. Over a leng...

Essen, North Rhine-Westphalia, Germany - Demolition of an office building, demolition of former RWE
BRK25D78_381

Essen, North Rhine-Westphalia, Germany - Demolitio...

Essen, North Rhine-Westphalia, Germany - Construction crane lifts concrete section in front of
BRK25D83_360

Essen, North Rhine-Westphalia, Germany - Construct...

After the collapse of parts of the Carola Bridge, demolition work began on the Old Town side. The
BRK25D18_125

After the collapse of parts of the Carola Bridge, ...

After the partial collapse of the Carola Bridge, the demolition work is moved to the new side of
BRK25D12_483

After the partial collapse of the Carola Bridge, t...

After the partial collapse of the Carola Bridge, demolition work continues on a dam built directly
BRK25D14_109

After the partial collapse of the Carola Bridge, d...

After the collapse of parts of the Carola Bridge, demolition work began on the Old Town side. The
BRK25D21_361

After the collapse of parts of the Carola Bridge, ...

A section of the Carola Bridge has collapsed. Over a length of around 100 metres, the section on
BRK25D28_265

A section of the Carola Bridge has collapsed. Over...

  • Page
  • sur
  • 9