Légende
Demolition of the 120 meter long motorway bridge of the A516, across Teutoburger Straße in Oberhausen-Sterkrade, the bridge, built in 1970 was severely damaged, traffic continues to roll on the still existing West Bridge, after the demolition, the eastern part is rebuilt using a process unique in the world, 40 meter long precast concrete beams are assembled one after the other, reducing the construction period from 24 to 7 months after the completion of this bridge Will the western part also be rebuilt, North Rhine-Westphalia, Germany
Crédit
Photo12/imageBROKER/Jochen Tack
Notre référence
BRK26C42_148
Model release
Non
Property release
Non
Licence
Droits gérés
Format disponible
172.3Mo (8.7Mo) / 80.5cm x 53.6cm / 9504 x 6336 (300dpi)