Légende
Spectators, teethers during the demolition of the 120 meter long motorway bridge of the A516, across Teutoburger Straße in Oberhausen-Sterkrade, the bridge, built in 1970, was severely damaged, traffic continues to roll on the still existing West Bridge, after demolition, the eastern part is rebuilt using a process that is unique in the world to date, 40 meter long precast concrete beams are assembled one after the other, reducing construction time from 24 to 7 months, after the completion of this bridge, the western part will also be rebuilt, North Rhine-Westphalia, Germany
Date
16 janv. 2026
Crédit
Photo12/imageBROKER/Jochen Tack
Notre référence
BRK26B23_061
Model release
Non
Property release
Non
Licence
Droits gérés
Format disponible
172,3Mo (11,4Mo) / 80,5cm x 53,6cm / 9504 x 6336 (300dpi)