Period

1010 results for: substitute

  • Page
  • of
  • 11
Please sign in for more results
New construction of the second part of the Neuenkamp motorway bridge of the A40, across the Rhine
BRK26J08_045

New construction of the second part of the Neuenka...

New construction of the second Neuenkamp motorway bridge of the A40, across the Rhine near
BRK26J15_330

New construction of the second Neuenkamp motorway ...

First part of the assembly of the new, 120-meter-long A516 motorway bridge, across Teutoburger
BRK26J28_255

First part of the assembly of the new, 120-meter-l...

The Hardenberg bridge, A40 motorway in Mülheim an der Ruhr, dilapidated motorway bridge, must be
BRK26J18_419

The Hardenberg bridge, A40 motorway in Mülheim an ...

Construction of the second Neuenkamp motorway bridge of the A40, across the Rhine near Duisburg,
BRK26J26_026

Construction of the second Neuenkamp motorway brid...

First part of the assembly of the new, 120-meter-long A516 motorway bridge, across Teutoburger
BRK26J17_375

First part of the assembly of the new, 120-meter-l...

Demolition of an old road bridge, Weierstraße, then new construction of the bridge for the
BRK26J47_375

Demolition of an old road bridge, Weierstraße, the...

Construction of the second Neuenkamp motorway bridge of the A40, across the Rhine near Duisburg,
BRK26J16_400

Construction of the second Neuenkamp motorway brid...

New construction of the second part of the Neuenkamp motorway bridge of the A40, across the Rhine
BRK26J15_116

New construction of the second part of the Neuenka...

Construction site on the A40 motorway near Mülheim-Winkhausen, preparatory work, bridge segments of
BRK26J32_258

Construction site on the A40 motorway near Mülheim...

Large-scale construction site, replacement building for the NA complex, Ruhr-Universität Bochum,
BRK26J13_315

Large-scale construction site, replacement buildin...

Europe, Germany, Hamburg, Billwerder, JVAB, prison, prison, prison, correctional facility,
BRK26J51_106

Europe, Germany, Hamburg, Billwerder, JVAB, prison...

Technical soccer referee shows on the electronic board 3 substitutes, at stadium in Lubin, Poland
BRK26J47_468

Technical soccer referee shows on the electronic b...

The Bridge of Solidarity, the longest tied-arch bridge in Germany, over the Rhine from
BRK26J39_440

The Bridge of Solidarity, the longest tied-arch br...

Man shows substitution players numbers during football match in Lubin, Poland
BRK26J47_454

Man shows substitution players numbers during foot...

New construction of the second part of the Neuenkamp motorway bridge of the A40, across the Rhine
BRK26I55_394

New construction of the second part of the Neuenka...

First part of the assembly of the new, 120-meter-long A516 motorway bridge, across Teutoburger
BRK26I78_472

First part of the assembly of the new, 120-meter-l...

New construction of the second Neuenkamp motorway bridge of the A40, across the Rhine near
BRK26I66_498

New construction of the second Neuenkamp motorway ...

Demolition of the 120 meter long motorway bridge of the A516, across Teutoburger Straße in
BRK26I75_222

Demolition of the 120 meter long motorway bridge o...

New construction of the second part of the Neuenkamp motorway bridge of the A40, across the Rhine
BRK26I72_344

New construction of the second part of the Neuenka...

New construction of the second part of the Neuenkamp motorway bridge of the A40, across the Rhine
BRK26I72_437

New construction of the second part of the Neuenka...

Open days on the construction site at the new main railway station started with great public
BRK26I91_356

Open days on the construction site at the new main...

Construction site on the A40 motorway near Mülheim-Winkhausen, preparatory work, bridge segments of
BRK26I88_446

Construction site on the A40 motorway near Mülheim...

Substitute bench, trainer bench, former sponsor Recaro taped, drinking bottles, WWK Arena,
BRK26J02_041

Substitute bench, trainer bench, former sponsor Re...

Europe, Germany, Hamburg, Billwerder, JVAB, prison, prison, prison, correctional facility,
BRK26I81_233

Europe, Germany, Hamburg, Billwerder, JVAB, prison...

Subway fare machines. Contactless smart card technology in public transportation
BRK26I74_493

Subway fare machines. Contactless smart card techn...

Team manager man shows players substitution during football match in Lubin, Poland
BRK26I72_381

Team manager man shows players substitution during...

Tart flambe, open pie, rectangular pizza, with cheese and red onion, bacon slices, Alsatian dish,
BRK26I98_323

Tart flambe, open pie, rectangular pizza, with che...

Large-scale construction site, replacement building for the NA complex, Ruhr-Universität Bochum,
BRK26I41_463

Large-scale construction site, replacement buildin...

New construction of the second Neuenkamp motorway bridge of the A40, across the Rhine near
BRK26I17_338

New construction of the second Neuenkamp motorway ...

Open days on the construction site at the new main railway station started with great public
BRK26I48_357

Open days on the construction site at the new main...

Europe, Germany, Hamburg, Billwerder, JVAB, JVA, prison, jail, enforcement, replacement,
BRK26I44_418

Europe, Germany, Hamburg, Billwerder, JVAB, JVA, p...

First part of the assembly of the new, 120-meter-long A516 motorway bridge, across Teutoburger
BRK26I38_418

First part of the assembly of the new, 120-meter-l...

New construction of the second part of the Neuenkamp motorway bridge of the A40, across the Rhine
BRK26I21_158

New construction of the second part of the Neuenka...

Demolition of the 120 meter long motorway bridge of the A516, across Teutoburger Straße in
BRK26I35_381

Demolition of the 120 meter long motorway bridge o...

The Hardenberg bridge, A40 motorway in Mülheim an der Ruhr, dilapidated motorway bridge, must be
BRK26I44_128

The Hardenberg bridge, A40 motorway in Mülheim an ...

First part of the assembly of the new, 120-meter-long A516 motorway bridge, across Teutoburger
BRK26I46_135

First part of the assembly of the new, 120-meter-l...

New construction of the second part of the Neuenkamp motorway bridge of the A40, across the Rhine
BRK26I15_201

New construction of the second part of the Neuenka...

New construction of the second part of the Neuenkamp motorway bridge of the A40, across the Rhine
BRK26I34_342

New construction of the second part of the Neuenka...

New construction of the second Neuenkamp motorway bridge of the A40, across the Rhine near
BRK26I44_347

New construction of the second Neuenkamp motorway ...

New construction of the second part of the Neuenkamp motorway bridge of the A40, across the Rhine
BRK26I18_371

New construction of the second part of the Neuenka...

Historical illustration of the second iron hand of the knight Götz von Berlichingen, which was made
BRK26I29_496

Historical illustration of the second iron hand of...

View form the behind on head coach and substitutions bench with handball match in background in
BRK26I44_397

View form the behind on head coach and substitutio...

Team manager man shows players substitution during football match in Lubin, Poland
BRK26I20_305

Team manager man shows players substitution during...

Team manager man shows players substitution during football match in Lubin, Poland
BRK26I20_192

Team manager man shows players substitution during...

Players substitution during football match
BRK26I42_200

Players substitution during football match

New construction of the second Neuenkamp motorway bridge of the A40, across the Rhine near
BRK26H58_024

New construction of the second Neuenkamp motorway ...

Open days on the construction site at the new main railway station started with great public
BRK26I00_193

Open days on the construction site at the new main...

Demolition of the 120 meter long motorway bridge of the A516, across Teutoburger Straße in
BRK26H82_060

Demolition of the 120 meter long motorway bridge o...

Leroy Sane FC Bayern Munich FCB (10) portrait in the substitutes' jersey, PreZero Arena, Sinsheim,
BRK26H99_396

Leroy Sane FC Bayern Munich FCB (10) portrait in t...

First part of the assembly of the new, 120-meter-long A516 motorway bridge, across Teutoburger
BRK26H82_102

First part of the assembly of the new, 120-meter-l...

The Hardenberg bridge, A40 motorway in Mülheim an der Ruhr, dilapidated motorway bridge, must be
BRK26H96_212

The Hardenberg bridge, A40 motorway in Mülheim an ...

First part of the assembly of the new, 120-meter-long A516 motorway bridge, across Teutoburger
BRK26H93_163

First part of the assembly of the new, 120-meter-l...

Dentist explaining treatment to patients, showing denture examples and radiography in his modern
BRK26H94_315

Dentist explaining treatment to patients, showing ...

Team manager man shows players substitution during football match in Poland
BRK26H53_118

Team manager man shows players substitution during...

Assistant referee holding a flag during a soccer match while officials and substitute players stand
BRK26H81_312

Assistant referee holding a flag during a soccer m...

Sideline referee shows players substitution during football match at stadium in Lubin, Poland
BRK26H85_246

Sideline referee shows players substitution during...

Man shows players substitution during football match in Lubin, Poland
BRK26H70_245

Man shows players substitution during football mat...

Historical illustration of the second iron hand of the knight Götz von Berlichingen, which was made
BRK26I02_169

Historical illustration of the second iron hand of...

Humanitarian aid during the Russo-Omani Caucasus Conflict or the Russo-Turkish War (1877–1878) . A
BRK26H70_233

Humanitarian aid during the Russo-Omani Caucasus C...

First part of the assembly of the new, 120-meter-long A516 motorway bridge, across Teutoburger
BRK26H45_178

First part of the assembly of the new, 120-meter-l...

Demolition of the 120 meter long motorway bridge of the A516, across Teutoburger Straße in
BRK26H45_353

Demolition of the 120 meter long motorway bridge o...

New construction of the second Neuenkamp motorway bridge of the A40, across the Rhine near
BRK26H08_494

New construction of the second Neuenkamp motorway ...

Man shows players substitution during football match in Glogow, Poland
BRK26H27_380

Man shows players substitution during football mat...

Man shows players substitution during football match in Lubin, Poland
BRK26H38_071

Man shows players substitution during football mat...

Demolition of the 120 meter long motorway bridge of the A516, across Teutoburger Straße in
BRK26G62_449

Demolition of the 120 meter long motorway bridge o...

First part of the assembly of the new, 120-meter-long A516 motorway bridge, across Teutoburger
BRK26G97_198

First part of the assembly of the new, 120-meter-l...

First part of the assembly of the new, 120-meter-long A516 motorway bridge, across Teutoburger
BRK26G60_427

First part of the assembly of the new, 120-meter-l...

DHL packing station in a residential area, in Duisburg-Neuenkamp, receiving and sending parcels and
BRK26G72_382

DHL packing station in a residential area, in Duis...

The Hardenberg bridge, A40 motorway in Mülheim an der Ruhr, dilapidated motorway bridge, must be
BRK26G58_309

The Hardenberg bridge, A40 motorway in Mülheim an ...

Dentist explaining to patient treatment with dental prosthesis, surrounded by various dental models
BRK26G53_446

Dentist explaining to patient treatment with denta...

Technical referee shows players substitution during football match in Lubin, Poland
BRK26G89_010

Technical referee shows players substitution durin...

The iron hand of the knight Götz von Berlichingen, Gottfried Götz von Berlichingen zu Hornberg,
BRK26G53_392

The iron hand of the knight Götz von Berlichingen,...

Man shows substitution players numbers during football match in Lubin, Poland
BRK26G96_499

Man shows substitution players numbers during foot...

Players substitution during football match
BRK26G84_380

Players substitution during football match

Construction of the second Neuenkamp motorway bridge of the A40, across the Rhine near Duisburg,
BRK26G18_239

Construction of the second Neuenkamp motorway brid...

First part of the assembly of the new, 120-meter-long A516 motorway bridge, across Teutoburger
BRK26G14_469

First part of the assembly of the new, 120-meter-l...

The Bridge of Solidarity, the longest tied-arch bridge in Germany, over the Rhine from
BRK26G28_369

The Bridge of Solidarity, the longest tied-arch br...

Demolition of the 120 meter long motorway bridge of the A516, across Teutoburger Straße in
BRK26G07_020

Demolition of the 120 meter long motorway bridge o...

First part of the assembly of the new, 120-meter-long A516 motorway bridge, across Teutoburger
BRK26G33_161

First part of the assembly of the new, 120-meter-l...

Broken urinal in an inn. Rottweil, Baden-Württemberg, Germany
BRK26G22_322

Broken urinal in an inn. Rottweil, Baden-Württembe...

Workers with cutting torches demolishing the 120-meter long motorway bridge of the A516, across
BRK26G49_059

Workers with cutting torches demolishing the 120-m...

Symbolic picture blackout, extensive, prolonged power failure, in private environments, without
BRK26G18_151

Symbolic picture blackout, extensive, prolonged po...

Symbolic picture blackout, extensive, prolonged power failure, in private environments, without
BRK26G43_154

Symbolic picture blackout, extensive, prolonged po...

The iron hand of Gottfried Goetz von Berlichingen zu Hornberg, 1480, 1562, a Frankish kingdom
BRK26G33_146

The iron hand of Gottfried Goetz von Berlichingen ...

Technical referee shows 3 minutes added time during the football match.
BRK26G09_142

Technical referee shows 3 minutes added time durin...

First part of the assembly of the new, 120-meter-long A516 motorway bridge, across Teutoburger
BRK26F77_238

First part of the assembly of the new, 120-meter-l...

The Hardenberg bridge, A40 motorway in Mülheim an der Ruhr, dilapidated motorway bridge, must be
BRK26F64_189

The Hardenberg bridge, A40 motorway in Mülheim an ...

Broken urinal in an inn. Rottweil, Baden-Württemberg, Germany
BRK26F56_354

Broken urinal in an inn. Rottweil, Baden-Württembe...

Demolition of the 120 meter long motorway bridge of the A516, across Teutoburger Straße in
BRK26F58_062

Demolition of the 120 meter long motorway bridge o...

First part of the assembly of the new, 120-meter-long A516 motorway bridge, across Teutoburger
BRK26F95_040

First part of the assembly of the new, 120-meter-l...

The Hardenberg bridge, A40 motorway in Mülheim an der Ruhr, dilapidated motorway bridge, must be
BRK26F94_481

The Hardenberg bridge, A40 motorway in Mülheim an ...

DHL packing station in a residential area, in Duisburg-Neuenkamp, receiving and sending parcels and
BRK26F99_133

DHL packing station in a residential area, in Duis...

Large-scale construction site, replacement building for the NA complex, Ruhr-Universität Bochum,
BRK26F36_476

Large-scale construction site, replacement buildin...

Meat on the grill with fire in summer, Vegetarian, Meat substitute
BRK26F86_211

Meat on the grill with fire in summer, Vegetarian,...

Artificial bacon as imitation meat, imitation bacon on plate, meat substitute
BRK26F90_315

Artificial bacon as imitation meat, imitation baco...

Illuminated lettering of Barmer Ersatzkasse on a façade in Elberfeld, Wuppertal, Germany
BRK26F02_435

Illuminated lettering of Barmer Ersatzkasse on a f...

Technical referee shows players substitution during football match in Lubin, Poland
BRK26D26_267

Technical referee shows players substitution durin...

Subway fare machines. Contactless smart card technology in public transportation
BRK26D14_020

Subway fare machines. Contactless smart card techn...

Open days on the construction site at the new main railway station started with great public
BRK26D08_118

Open days on the construction site at the new main...

  • Page
  • of
  • 11