Caption
Demolition of the 120 meter long motorway bridge of the A516, across Teutoburger Straße in Oberhausen-Sterkrade, the bridge, built in 1970 was severely damaged, traffic continues to roll on the still existing West Bridge, after the demolition, the eastern part is rebuilt using a process unique in the world, 40 meter long precast concrete beams are assembled one after the other, reducing the construction period from 24 to 7 months after the completion of this bridge Will the western part also be rebuilt, North Rhine-Westphalia, Germany
Date
Jan 16, 2026
Credit line
Photo12/ImageBROKER/Jochen Tack
Reference
BRK26G62_449
Model release
No
Property release
No
License type
Rights managed
Available size
167.8Mb (55.9Mb) / 31.3in x 20.8in / 9379 x 6253 (300dpi)