Caption
Demolition of the 120 meter long motorway bridge of the A516, across Teutoburger Straße in Oberhausen-Sterkrade, the bridge, built in 1970 was severely damaged, traffic continues to roll on the still existing West Bridge, after the demolition, the eastern part is rebuilt using a process unique in the world, 40 meter long precast concrete beams are assembled one after the other, reducing the construction period from 24 to 7 months after the completion of this bridge Will the western part also be rebuilt, North Rhine-Westphalia, Germany
Date
Jan 16, 2026
Credit line
Photo12/ImageBROKER/Jochen Tack
Reference
BRK26H45_353
Model release
No
Property release
No
License type
Rights managed
Available size
133.1Mb (44.4Mb) / 27.8in x 18.6in / 8354 x 5569 (300dpi)