Period

1801 results for: building demolition

  • Page
  • of
  • 19
Please sign in for more results
The Bridge of Solidarity, the longest tied-arch bridge in Germany, over the Rhine from
BRK26J39_440

The Bridge of Solidarity, the longest tied-arch br...

Demolition of the old A40 Rhine bridge Neuenkamp, next to it the first part of the new motorway
BRK26J43_289

Demolition of the old A40 Rhine bridge Neuenkamp, ...

Demolished tower of a 20 year old wind turbine, in the Werl wind farm, 5 old Enercon E-66 turbines
BRK26J45_453

Demolished tower of a 20 year old wind turbine, in...

Demolition of the old A40 Rhine bridge Neuenkamp, next to it the first part of the new motorway
BRK26J44_332

Demolition of the old A40 Rhine bridge Neuenkamp, ...

Wind turbine repowering, in the Issum-Oermten wind farm, 9 wind turbines in operation for over 20
BRK26J24_069

Wind turbine repowering, in the Issum-Oermten wind...

Repowering of a wind farm near Issum, 9 older wind turbines from the manufacturer Enercon (model
BRK26J27_294

Repowering of a wind farm near Issum, 9 older wind...

Duisburg-Hochheide, large housing estate Wohnpark Hochheide, 6 20-storey high-rise buildings with
BRK26J50_224

Duisburg-Hochheide, large housing estate Wohnpark ...

Motorway construction site Berlin, A 100 at ICC, Berlin, Germany
BRK26J27_478

Motorway construction site Berlin, A 100 at ICC, B...

Repowering of a wind farm near Issum, 9 older wind turbines from the manufacturer Enercon (model
BRK26J29_403

Repowering of a wind farm near Issum, 9 older wind...

Old London Bridge, old view, taken shortly before the demolition of the houses in 1756, London,
BRK26J21_128

Old London Bridge, old view, taken shortly before ...

Construction site for the demolition of a building with hydraulic excavator CAT 374F under a blue
BRK26J22_355

Construction site for the demolition of a building...

Demolition of the old Orangerie building, Jardin du Luxembourg, Paris, France, 1862
BRK26J21_365

Demolition of the old Orangerie building, Jardin d...

Close-up of an old, rusty tank on a construction site, in the background sand, sky and clouds,
BRK26J36_455

Close-up of an old, rusty tank on a construction s...

Essen, North Rhine-Westphalia, Germany - Construction site barriers on a scaffolded office building
BRK26J33_110

Essen, North Rhine-Westphalia, Germany - Construct...

Image of a construction site interior revealing unfinished walls and debris. Exposed brick and
BRK26J46_204

Image of a construction site interior revealing un...

Wheat Ridge, Colorado - Intermountain Health's Lutheran Hospital is demolished after building a new
BRK26I57_151

Wheat Ridge, Colorado - Intermountain Health's Lut...

OB-Karl-Lehr bridge train, new bridge on Ruhrorter Straße in Duisburg across the Ruhr and the port
BRK26I81_178

OB-Karl-Lehr bridge train, new bridge on Ruhrorter...

Demolition of the 120 meter long motorway bridge of the A516, across Teutoburger Straße in
BRK26I75_222

Demolition of the 120 meter long motorway bridge o...

Repowering of a wind farm near Issum, 9 older wind turbines from the manufacturer Enercon (model
BRK26I77_442

Repowering of a wind farm near Issum, 9 older wind...

Construction site on the A40 motorway near Mülheim-Winkhausen, preparatory work, bridge segments of
BRK26I88_446

Construction site on the A40 motorway near Mülheim...

Duisburg-Hochheide, large housing estate Wohnpark Hochheide, 6 20-storey high-rise buildings with
BRK26I79_193

Duisburg-Hochheide, large housing estate Wohnpark ...

Dismantling of a wind power plant in a wind farm near Issum, 9 older wind turbines from the
BRK26J00_116

Dismantling of a wind power plant in a wind farm n...

Dismantling, demolition of the old A1 bridge near Leverkusen, noise barriers, next to it the new
BRK26I94_369

Dismantling, demolition of the old A1 bridge near ...

Potsdam, city palace, colonnades, wrestling colonnade, built in 1746. Knobelsdorff, city palace
BRK26I71_466

Potsdam, city palace, colonnades, wrestling colonn...

Demolition ruins of the Angererstraße 9 post office, subject of economic crisis, Munich, Bavaria,
BRK26I82_114

Demolition ruins of the Angererstraße 9 post offic...

Aerial view of a construction site with a crane moving material, surrounded by trees and houses,
BRK26I76_474

Aerial view of a construction site with a crane mo...

Dortmund, North Rhine-Westphalia, Germany - Sunny winter landscape in the Ruhr area, ice and snow
BRK26I87_180

Dortmund, North Rhine-Westphalia, Germany - Sunny ...

Aerial view of a construction site in the middle of a green landscape and close to buildings,
BRK26I97_210

Aerial view of a construction site in the middle o...

Historic sandstone portal and commemorative plaque at the old location of the former Oberschenke
BRK26I79_318

Historic sandstone portal and commemorative plaque...

House demolition, demolition excavator in action
BRK26I92_121

House demolition, demolition excavator in action

Demolition work continues after the partial collapse of the Carola Bridge. Another carriageway was
BRK26I02_407

Demolition work continues after the partial collap...

Detroit, Michigan - The framework of an old industrial building near the Detroit River, part of a
BRK26I47_268

Detroit, Michigan - The framework of an old indust...

Repowering, dismantled Enercon E-58 wind turbine in a wind farm near Issum, 9 older wind turbines
BRK26I46_019

Repowering, dismantled Enercon E-58 wind turbine i...

Dismantling of a wind power plant in a wind farm near Issum, 9 older wind turbines from the
BRK26I38_302

Dismantling of a wind power plant in a wind farm n...

Demolition of the 120 meter long motorway bridge of the A516, across Teutoburger Straße in
BRK26I35_381

Demolition of the 120 meter long motorway bridge o...

Demolition of the old A40 Rhine bridge Neuenkamp, next to it the first part of the new motorway
BRK26I37_366

Demolition of the old A40 Rhine bridge Neuenkamp, ...

The Hardenberg bridge, A40 motorway in Mülheim an der Ruhr, dilapidated motorway bridge, must be
BRK26I44_128

The Hardenberg bridge, A40 motorway in Mülheim an ...

Repowering of a wind farm near Issum, 9 older wind turbines from the manufacturer Enercon (model
BRK26I41_025

Repowering of a wind farm near Issum, 9 older wind...

Traffic on the A40 Neuenkamp bridge, piers and stay cables of the new motorway bridge over the
BRK26I50_095

Traffic on the A40 Neuenkamp bridge, piers and sta...

Scaffolding surrounds a building under renovation, showcasing exposed brickwork and construction
BRK26I37_373

Scaffolding surrounds a building under renovation,...

House demolition, demolition excavator in action
BRK26I44_446

House demolition, demolition excavator in action

Dismantling of the old motorway bridge Neuenkamp, the A40, dismantling of the last bridge pier,
BRK26H95_335

Dismantling of the old motorway bridge Neuenkamp, ...

Demolition of the 120 meter long motorway bridge of the A516, across Teutoburger Straße in
BRK26H82_060

Demolition of the 120 meter long motorway bridge o...

Demolition of the former RWE building complex, in the city centre, on the A40 motorway in Essen,
BRK26H97_409

Demolition of the former RWE building complex, in ...

Demolition of the old Rhine bridge Neuenkamp, the A40, behind the first of 2 new bridges, which is
BRK26H84_153

Demolition of the old Rhine bridge Neuenkamp, the ...

The Hardenberg bridge, A40 motorway in Mülheim an der Ruhr, dilapidated motorway bridge, must be
BRK26H96_212

The Hardenberg bridge, A40 motorway in Mülheim an ...

OB-Karl-Lehr bridge train, new bridge on Ruhrorter Straße in Duisburg across the Ruhr and the port
BRK26H70_286

OB-Karl-Lehr bridge train, new bridge on Ruhrorter...

Anglia Square 1960s brutalist architecture of shopping and office development cleared for
BRK26H83_315

Anglia Square 1960s brutalist architecture of shop...

Repowering of a wind farm near Issum, here the dismantling of the tower, 9 older wind turbines from
BRK26H98_271

Repowering of a wind farm near Issum, here the dis...

Demolition work on the Charlottenburg combined heat and power plant, to be replaced by
BRK26I01_067

Demolition work on the Charlottenburg combined hea...

Rotary hammer drill lying on a dusty concrete floor in a room under renovation, indicating ongoing
BRK26H53_484

Rotary hammer drill lying on a dusty concrete floo...

After the partial collapse of the Carola Bridge, demolition work continues, Dresden, Saxony,
BRK26H17_219

After the partial collapse of the Carola Bridge, d...

Demolition of the 120 meter long motorway bridge of the A516, across Teutoburger Straße in
BRK26H45_353

Demolition of the 120 meter long motorway bridge o...

Anglia Square 1960s brutalist architecture of shopping and office development cleared for
BRK26H44_022

Anglia Square 1960s brutalist architecture of shop...

Dismantling of a wind power plant in a wind farm near Issum, 9 older wind turbines from the
BRK26H49_157

Dismantling of a wind power plant in a wind farm n...

Preparation for the demolition of the tower of a 20 year old wind turbine, in the Werl wind farm, 5
BRK26H47_428

Preparation for the demolition of the tower of a 2...

Demolition work continues after the partial collapse of the Carola Bridge. Construction of a
BRK26H04_298

Demolition work continues after the partial collap...

Demolition work continues following the partial collapse of the Carola Bridge. Construction of a
BRK26H04_344

Demolition work continues following the partial co...

Essen, North Rhine-Westphalia, Germany - Construction crane lifts concrete section in front of
BRK26H50_402

Essen, North Rhine-Westphalia, Germany - Construct...

Dortmund, North Rhine-Westphalia, Germany - Sunny winter landscape in the Ruhr area, ice and snow
BRK26H47_367

Dortmund, North Rhine-Westphalia, Germany - Sunny ...

The cathedral of Saint Denis, west façade in front of the demolition of the damaged north tower in
BRK26H37_300

The cathedral of Saint Denis, west façade in front...

Demolition of the 120 meter long motorway bridge of the A516, across Teutoburger Straße in
BRK26G62_449

Demolition of the 120 meter long motorway bridge o...

Erection of an Enercon E-160 wind turbine, rear, assembly of the first blade, 4 turbines with a
BRK26G94_468

Erection of an Enercon E-160 wind turbine, rear, a...

Dismantling of a wind power plant in a wind farm near Issum, 9 older wind turbines from the
BRK26G68_208

Dismantling of a wind power plant in a wind farm n...

Duisburg-Hochheide, large housing estate Wohnpark Hochheide, 6 20-storey high-rise buildings with
BRK26G90_408

Duisburg-Hochheide, large housing estate Wohnpark ...

Dismantling of a wind power plant in a wind farm near Issum, 9 older wind turbines from the
BRK26G90_481

Dismantling of a wind power plant in a wind farm n...

Construction site, demolition, demolition of a large building, the former high-rise building of the
BRK26G86_280

Construction site, demolition, demolition of a lar...

Repowering of a wind farm near Issum, 9 older wind turbines from the manufacturer Enercon (model
BRK26G85_484

Repowering of a wind farm near Issum, 9 older wind...

Demolition of the former RWE building complex, in the city centre, on the A40 motorway in Essen,
BRK26G93_243

Demolition of the former RWE building complex, in ...

Wind turbine repowering, in the Issum-Oermten wind farm, 9 wind turbines in operation for over 20
BRK26G96_238

Wind turbine repowering, in the Issum-Oermten wind...

Dismantling of a wind power plant in a wind farm near Issum, 9 older wind turbines from the
BRK26G60_193

Dismantling of a wind power plant in a wind farm n...

Preparation for the demolition of the tower of a 20 year old wind turbine, in the Werl wind farm, 5
BRK26G95_494

Preparation for the demolition of the tower of a 2...

The Hardenberg bridge, A40 motorway in Mülheim an der Ruhr, dilapidated motorway bridge, must be
BRK26G58_309

The Hardenberg bridge, A40 motorway in Mülheim an ...

Demolition of the old A40 Rhine bridge Neuenkamp, next to it the first part of the new motorway
BRK26G95_184

Demolition of the old A40 Rhine bridge Neuenkamp, ...

Dortmund, North Rhine-Westphalia, Germany - Sunny winter landscape in the Ruhr area, ice and snow
BRK26G67_410

Dortmund, North Rhine-Westphalia, Germany - Sunny ...

A worker in a tractor pours sand on a grass (top dressing) during the renovation of the soccer
BRK26G53_071

A worker in a tractor pours sand on a grass (top d...

Wind turbine repowering, in the Issum-Oermten wind farm, 9 wind turbines in operation for over 20
BRK26G31_202

Wind turbine repowering, in the Issum-Oermten wind...

The Hausackerbrücke, inner-city road bridge over the A40 motorway and the U18 light rail line,
BRK26G52_287

The Hausackerbrücke, inner-city road bridge over t...

The Bridge of Solidarity, the longest tied-arch bridge in Germany, over the Rhine from
BRK26G28_369

The Bridge of Solidarity, the longest tied-arch br...

Detroit, Michigan - The framework of an old industrial building near the Detroit River, part of a
BRK26G32_406

Detroit, Michigan - The framework of an old indust...

Demolition of the 120 meter long motorway bridge of the A516, across Teutoburger Straße in
BRK26G07_020

Demolition of the 120 meter long motorway bridge o...

Traffic on the A40 Neuenkamp bridge, piers and stay cables of the new motorway bridge over the
BRK26G38_012

Traffic on the A40 Neuenkamp bridge, piers and sta...

Duisburg-Hochheide, large housing estate Wohnpark Hochheide, 6 20-storey high-rise buildings with
BRK26G23_064

Duisburg-Hochheide, large housing estate Wohnpark ...

Dismantling of a wind power plant in a wind farm near Issum, 9 older wind turbines from the
BRK26G27_264

Dismantling of a wind power plant in a wind farm n...

Workers with cutting torches demolishing the 120-meter long motorway bridge of the A516, across
BRK26G49_059

Workers with cutting torches demolishing the 120-m...

Repowering of a wind farm near Issum, 9 older wind turbines from the manufacturer Enercon (model
BRK26G46_177

Repowering of a wind farm near Issum, 9 older wind...

Denver, Colorado - Xcel Energy's idled Zuni power plant. The 123-year-old plant provided steam for
BRK26G27_167

Denver, Colorado - Xcel Energy's idled Zuni power ...

Construction site on Haroldstraße, demolition of a former office building, after complete gutting
BRK26G48_480

Construction site on Haroldstraße, demolition of a...

Aerial view of an excavator loading soil into a lorry on a construction site, demolition site,
BRK26G24_009

Aerial view of an excavator loading soil into a lo...

Demolition of office tower at the Urania. The administration building, built in 1967, will be
BRK26G28_227

Demolition of office tower at the Urania. The admi...

Demolition with an excavator, dismantling, house demolition, demolition of a house, demolition
BRK26G32_455

Demolition with an excavator, dismantling, house d...

Demolition edges of the old city wall at the Donatsturm next to the Donatstor, Freiberg, Saxony,
BRK26G14_099

Demolition edges of the old city wall at the Donat...

House demolition, demolition excavator in action
BRK26G32_374

House demolition, demolition excavator in action

The Lufthansa high-rise (headquarters of the German airline until 2007) on the banks of the Rhine
BRK26F73_001

The Lufthansa high-rise (headquarters of the Germa...

Wind turbine repowering, in the Issum-Oermten wind farm, 9 wind turbines in operation for over 20
BRK26F78_310

Wind turbine repowering, in the Issum-Oermten wind...

The Hardenberg bridge, A40 motorway in Mülheim an der Ruhr, dilapidated motorway bridge, must be
BRK26F64_189

The Hardenberg bridge, A40 motorway in Mülheim an ...

Dismantling of a wind power plant in a wind farm near Issum, 9 older wind turbines from the
BRK26F73_109

Dismantling of a wind power plant in a wind farm n...

Duisburg-Hochheide, large housing estate Wohnpark Hochheide, 6 20-storey high-rise buildings with
BRK26F90_410

Duisburg-Hochheide, large housing estate Wohnpark ...

Demolition of the 120 meter long motorway bridge of the A516, across Teutoburger Straße in
BRK26F58_062

Demolition of the 120 meter long motorway bridge o...

The Hardenberg bridge, A40 motorway in Mülheim an der Ruhr, dilapidated motorway bridge, must be
BRK26F94_481

The Hardenberg bridge, A40 motorway in Mülheim an ...

  • Page
  • of
  • 19