Period

138 results for: brenner base tunnel

  • Page
  • of
  • 2
Please sign in for more results
Lined tunnel section in construction lot H53, Brenner Base Tunnel, Wolf, Tyrol, Austria, Europe
BRK25E13_017

Lined tunnel section in construction lot H53, Bren...

Rear section of the Wilma double-shield tunnel boring machine in the H53 construction lot, Brenner
BRK25E13_019

Rear section of the Wilma double-shield tunnel bor...

Saint Barbara niche, tunnel entrance in construction lot H41, Brenner Base Tunnel, Zenzendorf,
BRK25E16_208

Saint Barbara niche, tunnel entrance in constructi...

Tunnel section in construction lot H41, Brenner Base Tunnel, Zenzendorf, Tyrol, Austria, Europe
BRK25E16_209

Tunnel section in construction lot H41, Brenner Ba...

Work on the Wilma double-shield tunnelling machine in the H53 construction lot, Brenner Base
BRK25E20_349

Work on the Wilma double-shield tunnelling machine...

Lined tunnel section in construction lot H53, Brenner Base Tunnel, Wolf, Tyrol, Austria, Europe
BRK25E05_030

Lined tunnel section in construction lot H53, Bren...

Tubbing segments for Brenner Base Tunnel, Zinzendorf, Tyrol, Austria, Europe
BRK25E05_031

Tubbing segments for Brenner Base Tunnel, Zinzendo...

Cistern for pumping out the water in construction lot H53, Brenner Base Tunnel, Tyrol, Austria,
BRK25E09_179

Cistern for pumping out the water in construction ...

Tunnel section in construction lot H53, Brenner Base Tunnel, Tyrol, Austria, Europe
BRK25E05_032

Tunnel section in construction lot H53, Brenner Ba...

Completed tunnel section in construction lot H41, Brenner Base Tunnel, Zenzendorf, Tyrol, Austria,
BRK25E05_033

Completed tunnel section in construction lot H41, ...

Tunnel section in construction lot H41 in the Sill Gorge, Brenner Base Tunnel, Tyrol, Austria,
BRK25E06_105

Tunnel section in construction lot H41 in the Sill...

Workers during a break in the production of segments for the Brenner Base Tunnel, Zenzendorf,
BRK25E09_187

Workers during a break in the production of segmen...

Debris in a tunnel section in construction lot H41, Brenner Base Tunnel, Zenzendorf, Tyrol,
BRK25E11_265

Debris in a tunnel section in construction lot H41...

Tunnel section, construction lot H53 in the Brenner Base Tunnel, Tyrol, Austria, Europe
BRK25E15_080

Tunnel section, construction lot H53 in the Brenne...

Workers in cross-passage 70, construction lot H53, Brenner Base Tunnel, Wolf, Tyrol, Austria,
BRK25E16_210

Workers in cross-passage 70, construction lot H53,...

Construction work on a cross-passage in a tunnel section in construction lot H53, Brenner Base
BRK25E00_041

Construction work on a cross-passage in a tunnel s...

Workers producing segments for the Brenner Base Tunnel, Zenzendorf, Tyrol, Austria, Europe
BRK25E16_211

Workers producing segments for the Brenner Base Tu...

Cistern for pumping out water from the construction site in the H53 construction lot, Brenner Base
BRK25D79_387

Cistern for pumping out water from the constructio...

Completed tunnel section in construction lot H41, Brenner Base Tunnel, Zenzendorf, Tyrol, Austria,
BRK25D79_388

Completed tunnel section in construction lot H41, ...

Graduate engineer (FH) Sebastian Reimann in construction lot H53, Brenner Base Tunnel, Wolf, Tyrol,
BRK25D85_287

Graduate engineer (FH) Sebastian Reimann in constr...

Tunnel section in construction lot H41 in the Sill Gorge, Brenner Base Tunnel, Tyrol, Austria,
BRK25D86_450

Tunnel section in construction lot H41 in the Sill...

Construction work on a cross-passage in a tunnel section in construction lot H53, Brenner Base
BRK25D86_451

Construction work on a cross-passage in a tunnel s...

Debris in a tunnel section in construction lot H41, Brenner Base Tunnel, Zenzendorf, Tyrol,
BRK25D82_247

Debris in a tunnel section in construction lot H41...

Material storage in a tunnel section in construction lot H53, Brenner Base Tunnel, Tyrol, Austria,
BRK25D79_385

Material storage in a tunnel section in constructi...

Debris after a blast, tunnel section in construction lot H53, Brenner Base Tunnel, Wolf, Tyrol,
BRK25D82_246

Debris after a blast, tunnel section in constructi...

Completed tunnel section in construction lot H41, Brenner Base Tunnel, Zenzendorf, Tyrol, Austria,
BRK25D79_386

Completed tunnel section in construction lot H41, ...

Tunnel section, construction lot H53 in the Brenner Base Tunnel, Tyrol, Austria, Europe
BRK25D81_034

Tunnel section, construction lot H53 in the Brenne...

Cable in the tunnel section of construction lot H41, Brenner Base Tunnel, Zenzendorf, Tyrol,
BRK25D83_384

Cable in the tunnel section of construction lot H4...

Tubbing segments for the Brenner Base Tunnel, Zinzendorf, Tyrol, Austria, Europe
BRK25D83_385

Tubbing segments for the Brenner Base Tunnel, Zinz...

Rear section of the Wilma double-shield tunnel boring machine in the H53 construction lot, Brenner
BRK25D90_211

Rear section of the Wilma double-shield tunnel bor...

Ventilation hoses in construction lot H41 in the Sill Gorge, Brenner Base Tunnel, Tyrol, Austria,
BRK25D88_166

Ventilation hoses in construction lot H41 in the S...

Lined tunnel section in construction lot H53, Brenner Base Tunnel, Wolf, Tyrol, Austria, Europe
BRK25D89_358

Lined tunnel section in construction lot H53, Bren...

Double-shield tunnel boring machine in section H53 of the Brenner Base Tunnel, Tyrol, Austria,
BRK25D90_210

Double-shield tunnel boring machine in section H53...

Factory for the production of segments for the Brenner Base Tunnel, Zenzendorf, Tyrol, Austria,
BRK25D10_301

Factory for the production of segments for the Bre...

Workers in a tunnel section, construction lot H53 in the Brenner Base Tunnel, Tyrol, Austria,
BRK25D08_219

Workers in a tunnel section, construction lot H53 ...

Workers in lot H53 of the Brenner Base Tunnel, Tyrol, Austria, Europe
BRK25D06_071

Workers in lot H53 of the Brenner Base Tunnel, Tyr...

Tubbing segments for Brenner Base Tunnel, Zenzendorf, Tyrol, Austria, Europe
BRK25D08_278

Tubbing segments for Brenner Base Tunnel, Zenzendo...

Workers during a break in the production of segments for the Brenner Base Tunnel, Zenzendorf,
BRK25C59_483

Workers during a break in the production of segmen...

Tunnel section in construction lot H41, Brenner Base Tunnel, Zenzendorf, Tyrol, Austria, Europe
BRK25C83_312

Tunnel section in construction lot H41, Brenner Ba...

Graduate engineer (FH) Sebastian Reimann in construction lot H53, Brenner Base Tunnel, Wolf, Tyrol,
BRK25C77_059

Graduate engineer (FH) Sebastian Reimann in constr...

Tunnel section in construction lot H41 in the Sill Gorge, Brenner Base Tunnel, Tyrol, Austria,
BRK25C59_277

Tunnel section in construction lot H41 in the Sill...

Tunnel section in construction lot H41, Brenner Base Tunnel, Zenzendorf, Tyrol, Austria, Europe
BRK25C65_237

Tunnel section in construction lot H41, Brenner Ba...

Ventilation hoses in construction lot H41 in the Sill Gorge, Brenner Base Tunnel, Tyrol, Austria,
BRK25C65_239

Ventilation hoses in construction lot H41 in the S...

Workers in cross-passage 70, construction lot H53 in the Brenner Base Tunnel, Tyrol, Austria,
BRK25C66_128

Workers in cross-passage 70, construction lot H53 ...

Graduate engineer Sebastian Reimann, construction lot H53 in the Brenner Base Tunnel, Tyrol,
BRK25C66_268

Graduate engineer Sebastian Reimann, construction ...

Rear section of the Wilma double-shield tunnel boring machine in the H53 construction lot, Brenner
BRK25C77_335

Rear section of the Wilma double-shield tunnel bor...

Workers in a tunnel section at the double-shield tunnel boring machine in section H53 of the
BRK25C68_368

Workers in a tunnel section at the double-shield t...

Tunnel section, construction lot H53 in the Brenner Base Tunnel, Tyrol, Austria, Europe
BRK25C50_059

Tunnel section, construction lot H53 in the Brenne...

Rear section of the Wilma double-shield tunnel boring machine in the H53 construction lot, Brenner
BRK25C92_178

Rear section of the Wilma double-shield tunnel bor...

Tunnel section in construction lot H41, Brenner Base Tunnel, Zenzendorf, Tyrol, Austria, Europe
BRK25C58_256

Tunnel section in construction lot H41, Brenner Ba...

Tunnel section in construction lot H41 in the Sill Gorge, Brenner Base Tunnel, Tyrol, Austria,
BRK25C77_058

Tunnel section in construction lot H41 in the Sill...

Removal of rubble after blasting during tunnelling in construction lot H53, Brenner Base Tunnel,
BRK25C50_204

Removal of rubble after blasting during tunnelling...

Completed tunnel section in construction lot H41, Brenner Base Tunnel, Zenzendorf, Tyrol, Austria,
BRK25C59_278

Completed tunnel section in construction lot H41, ...

Workers in construction lot H53, Brenner Base Tunnel, Wolf, Tyrol, Austria, Europe
BRK25C79_031

Workers in construction lot H53, Brenner Base Tunn...

Workers in a tunnel section at the double-shield tunnel boring machine in section H53 of the
BRK25C94_184

Workers in a tunnel section at the double-shield t...

Tunnel section in construction lot H41, Brenner Base Tunnel, Zenzendorf, Tyrol, Austria, Europe
BRK25C59_411

Tunnel section in construction lot H41, Brenner Ba...

Ladder in a section of tunnel lined with shotcrete in construction lot H53, Brenner Base Tunnel,
BRK25C59_412

Ladder in a section of tunnel lined with shotcrete...

Tubbing segments for Brenner Base Tunnel, Zenzendorf, Tyrol, Austria, Europe
BRK25C63_315

Tubbing segments for Brenner Base Tunnel, Zenzendo...

Completed tunnel section in construction lot H41, Brenner Base Tunnel, Zenzendorf, Tyrol, Austria,
BRK25C62_488

Completed tunnel section in construction lot H41, ...

Debris after a blast in a tunnel section in the H53 construction lot, Brenner Base Tunnel, Tyrol,
BRK25C62_487

Debris after a blast in a tunnel section in the H5...

Separation of a cross-passage in construction lot H53, Brenner Base Tunnel, Wolf, Tyrol, Austria,
BRK25C75_075

Separation of a cross-passage in construction lot ...

Ladder in a section of tunnel lined with shotcrete in construction lot H53, Brenner Base Tunnel,
BRK25C77_332

Ladder in a section of tunnel lined with shotcrete...

Workers in a tunnel section, construction lot H53 in the Brenner Base Tunnel, Tyrol, Austria,
BRK25C67_323

Workers in a tunnel section, construction lot H53 ...

Workers in cross-passage 70, construction lot H53, Brenner Base Tunnel, Wolf, Tyrol, Austria,
BRK25C76_021

Workers in cross-passage 70, construction lot H53,...

Workers on the Wilma double-shield tunnel boring machine, construction lot H53 in the Brenner Base
BRK25C77_333

Workers on the Wilma double-shield tunnel boring m...

Production of segments for the construction of the Brenner Base Tunnel, Zenzendorf, Tyrol, Austria,
BRK25C50_245

Production of segments for the construction of the...

Completed tunnel section in construction lot H41, Brenner Base Tunnel, Zenzendorf, Tyrol, Austria,
BRK25C79_032

Completed tunnel section in construction lot H41, ...

Workers in a tunnel section, construction lot H53 in the Brenner Base Tunnel, Tyrol, Austria,
BRK25C77_331

Workers in a tunnel section, construction lot H53 ...

Ventilation hoses and rails in construction lot H53, Brenner Base Tunnel, Tyrol, Austria, Europe
BRK25C79_207

Ventilation hoses and rails in construction lot H5...

Ventilation hoses in construction lot H41 in the Sill Gorge, Brenner Base Tunnel, Tyrol, Austria,
BRK25C79_379

Ventilation hoses in construction lot H41 in the S...

Tunnel section, construction lot H53 in the Brenner Base Tunnel, Tyrol, Austria, Europe
BRK25C80_330

Tunnel section, construction lot H53 in the Brenne...

Double-shield tunnel boring machine in section H53 of the Brenner Base Tunnel, Tyrol, Austria,
BRK25C82_420

Double-shield tunnel boring machine in section H53...

Welder on the Wilma double-shield tunnel boring machine in the H53 construction lot, Brenner Base
BRK25C83_313

Welder on the Wilma double-shield tunnel boring ma...

Tunnel section in construction lot H41 in the Sill Gorge, Brenner Base Tunnel, Tyrol, Austria,
BRK25C91_162

Tunnel section in construction lot H41 in the Sill...

Ventilation hoses and rails in construction lot H53, Brenner Base Tunnel, Tyrol, Austria, Europe
BRK25C64_370

Ventilation hoses and rails in construction lot H5...

Workers producing segments for the Brenner Base Tunnel, Zenzendorf, Tyrol, Austria, Europe
BRK25C76_022

Workers producing segments for the Brenner Base Tu...

Tunnel section in construction lot H41, Brenner Base Tunnel, Zenzendorf, Tyrol, Austria, Europe
BRK25C79_208

Tunnel section in construction lot H41, Brenner Ba...

Cable in the tunnel section of construction lot H41, Brenner Base Tunnel, Zenzendorf, Tyrol,
BRK25C89_337

Cable in the tunnel section of construction lot H4...

Workers in cross-passage 70 in construction lot H53, Brenner Base Tunnel, Wolf, Tyrol, Austria,
BRK25C90_403

Workers in cross-passage 70 in construction lot H5...

Removal of rubble after blasting during tunnelling in construction lot H53, Brenner Base Tunnel,
BRK25C90_404

Removal of rubble after blasting during tunnelling...

Workers in a tunnel section at the double-shield tunnel boring machine in section H53 of the
BRK25C93_185

Workers in a tunnel section at the double-shield t...

Tunnel section, construction lot H53 in the Brenner Base Tunnel, Tyrol, Austria, Europe
BRK25C66_129

Tunnel section, construction lot H53 in the Brenne...

Construction work on a cross-passage in a tunnel section in construction lot H53, Brenner Base
BRK25B76_091

Construction work on a cross-passage in a tunnel s...

Cross at one end of the tunnel, installed for the Saint Barbara celebration on 4 December 2023,
BRK25B89_112

Cross at one end of the tunnel, installed for the ...

Cistern for pumping out water from the construction site in the H53 construction lot, Brenner Base
BRK25B97_093

Cistern for pumping out water from the constructio...

Tunnel section in construction lot H53, Brenner Base Tunnel, Tyrol, Austria, Europe
BRK25B89_109

Tunnel section in construction lot H53, Brenner Ba...

Tunnel section in construction lot H41 in the Sill Gorge, Brenner Base Tunnel, Tyrol, Austria,
BRK25B71_359

Tunnel section in construction lot H41 in the Sill...

Rescue room in construction lot H53, Brenner Base Tunnel, Tyrol, Austria, Europe
BRK25B73_102

Rescue room in construction lot H53, Brenner Base ...

Completed tunnel section in construction lot H41, Brenner Base Tunnel, Zenzendorf, Tyrol, Austria,
BRK25B76_092

Completed tunnel section in construction lot H41, ...

Tunnel section in construction lot H41, Brenner Base Tunnel, Zenzendorf, Tyrol, Austria, Europe
BRK25B76_093

Tunnel section in construction lot H41, Brenner Ba...

Workers during a break in the production of segments for the Brenner Base Tunnel, Zenzendorf,
BRK25B83_190

Workers during a break in the production of segmen...

Removal of rubble after blasting in a tunnel section in the H53 construction lot, Brenner Base
BRK25B89_108

Removal of rubble after blasting in a tunnel secti...

Completed tunnel section in construction lot H41, Brenner Base Tunnel, Zenzendorf, Tyrol, Austria,
BRK25B97_094

Completed tunnel section in construction lot H41, ...

Tubbing segments for Brenner Base Tunnel, Zenzendorf, Tyrol, Austria, Europe
BRK25B97_095

Tubbing segments for Brenner Base Tunnel, Zenzendo...

Landscape in front of entering the tunnel in the H53 construction lot, Brenner Base Tunnel, Wolf,
BRK25B99_041

Landscape in front of entering the tunnel in the H...

Workers in a control room of the double shield tunnel boring machine in section H53 of the Brenner
BRK25B36_446

Workers in a control room of the double shield tun...

Cistern for pumping out water from the construction site in the H53 construction lot, Brenner Base
BRK25B38_083

Cistern for pumping out water from the constructio...

Tunnel section in construction lot H41, Brenner Base Tunnel, Zenzendorf, Tyrol, Austria, Europe
BRK25B46_424

Tunnel section in construction lot H41, Brenner Ba...

Completed tunnel section in construction lot H41, Brenner Base Tunnel, Zenzendorf, Tyrol, Austria,
BRK25B46_423

Completed tunnel section in construction lot H41, ...

Workers during a break in the production of segments for the Brenner Base Tunnel, Zenzendorf,
BRK25B20_075

Workers during a break in the production of segmen...

  • Page
  • of
  • 2