Workers on the Wilma double-shield tunnel boring machine, construction lot H53 in the Brenner Base Tunnel, Tyrol, Austria, Europe
Caption

Workers on the Wilma double-shield tunnel boring machine, construction lot H53 in the Brenner Base Tunnel, Tyrol, Austria, Europe

Date

Nov 28, 2024

Credit line

Photo12/imageBROKER/Florian Bachmeier

Reference

BRK25C77_333

Model release

No

Property release

No

License type

Rights managed

Available size

72.1Mb (5.5Mb) / 19.3in x 14.5in / 5797 x 4348 (300dpi)

Please log in to download the high resolution file