Caption
Work on the Wilma double-shield tunnelling machine in the H53 construction lot, Brenner Base Tunnel, Wolf, Tyrol, Austria, Europe
Date
28 nov. 2024
Credit line
Photo12/imageBROKER/Florian Bachmeier
Reference
BRK25E20_349
Model release
Non
Property release
Non
License type
Droits gérés
Available size
76.6Mo (4.6Mo) / 50.6cm x 37.9cm / 5973 x 4480 (300dpi)