Caption
Work on the Wilma double-shield tunnelling machine in the H53 construction lot, Brenner Base Tunnel, Wolf, Tyrol, Austria, Europe
Date
Nov 28, 2024
Credit line
Photo12/imageBROKER/Florian Bachmeier
Reference
BRK25E20_349
Model release
No
Property release
No
License type
Rights managed
Available size
76.6Mb (4.6Mb) / 19.9in x 14.9in / 5973 x 4480 (300dpi)