Period

740 results for: Construction phase

  • Page
  • of
  • 8
Please sign in for more results
The village of Keyenberg at the Garzweiler II open-cast lignite mining area, the original village
BRK26J35_119

The village of Keyenberg at the Garzweiler II open...

Resettlement site of the 5 villages from the Garzweiler II opencast lignite mining area, Keyenberg,
BRK26J44_290

Resettlement site of the 5 villages from the Garzw...

Closed restaurant in the village of Keyenberg in the Garzweiler II open-cast lignite mining area,
BRK26J25_453

Closed restaurant in the village of Keyenberg in t...

The resettlement site of the 5 villages from the Garzweiler II opencast lignite mining area,
BRK26J33_386

The resettlement site of the 5 villages from the G...

New construction of the motorway bridge Neuenkamp of the A40, over the Rhine near Duisburg,
BRK26J34_257

New construction of the motorway bridge Neuenkamp ...

Bergarbeiterdenkmal Steile Lagerung, sculptor Max Kratz with many e-scooters in the center of
BRK26J29_432

Bergarbeiterdenkmal Steile Lagerung, sculptor Max ...

First part of the assembly of the new, 120-meter-long A516 motorway bridge, across Teutoburger
BRK26I78_472

First part of the assembly of the new, 120-meter-l...

Demolition of the 120 meter long motorway bridge of the A516, across Teutoburger Straße in
BRK26I75_222

Demolition of the 120 meter long motorway bridge o...

The village of Keyenberg at the Garzweiler II open-cast lignite mining area, the original village
BRK26I81_067

The village of Keyenberg at the Garzweiler II open...

The red terracotta tower and fleche of Holborn Bars rise above High Holborn, part of Alfred
BRK26I65_463

The red terracotta tower and fleche of Holborn Bar...

Construction work at Ulm Central Station: Until January 19, 2026, there will be no long-distance
BRK26I52_424

Construction work at Ulm Central Station: Until Ja...

Rehabilitation of the A52 motorway near Essen, an 8 km long section between the Essen-Kettwig
BRK26I71_038

Rehabilitation of the A52 motorway near Essen, an ...

Closed restaurant in the village of Keyenberg in the Garzweiler II open-cast lignite mining area,
BRK26I75_419

Closed restaurant in the village of Keyenberg in t...

The village of Keyenberg at the Garzweiler II open-cast lignite mining area, the original village
BRK26I88_290

The village of Keyenberg at the Garzweiler II open...

Construction plan for a residential building. Drawings and paintings by an architect, Austria
BRK26I55_287

Construction plan for a residential building. Draw...

Construction plan for a residential building. Drawings and paintings by an architect, Austria
BRK26I69_441

Construction plan for a residential building. Draw...

Construction work at Ulm Central Station: Until January 19, 2026, there will be no long-distance
BRK26I03_091

Construction work at Ulm Central Station: Until Ja...

The village of Keyenberg at the Garzweiler II open-cast lignite mining area, the original village
BRK26I42_131

The village of Keyenberg at the Garzweiler II open...

Rehabilitation of the A52 motorway near Essen, an 8 km long section between the Essen-Kettwig
BRK26I38_240

Rehabilitation of the A52 motorway near Essen, an ...

Rehabilitation of the A52 motorway near Essen, an 8 km long section between the Essen-Kettwig
BRK26I42_036

Rehabilitation of the A52 motorway near Essen, an ...

The Datteln 4 hard coal-fired power plant, operated by Uniper, on the Dormtund-Ems Canal, it is
BRK26I34_051

The Datteln 4 hard coal-fired power plant, operate...

First part of the assembly of the new, 120-meter-long A516 motorway bridge, across Teutoburger
BRK26I38_418

First part of the assembly of the new, 120-meter-l...

Demolition of the 120 meter long motorway bridge of the A516, across Teutoburger Straße in
BRK26I35_381

Demolition of the 120 meter long motorway bridge o...

First part of the assembly of the new, 120-meter-long A516 motorway bridge, across Teutoburger
BRK26I46_135

First part of the assembly of the new, 120-meter-l...

Old rusted three phase power electrical panels on a weathered metal wall in the old shipyards on
BRK26I04_204

Old rusted three phase power electrical panels on ...

Construction plan for a residential building. Drawings and paintings by an architect, Austria
BRK26I12_127

Construction plan for a residential building. Draw...

Construction plan for a residential building. Drawings and paintings by an architect, Austria
BRK26I11_099

Construction plan for a residential building. Draw...

View of the right bank of the Rhine near Duisburg-Kasslerfeld and Ruhrort, Rhine orange sculpture
BRK26H82_387

View of the right bank of the Rhine near Duisburg-...

Construction work at Ulm Central Station: Until January 19, 2026, there will be no long-distance
BRK26H52_422

Construction work at Ulm Central Station: Until Ja...

Promenade at the port of Duisburg-Ruhrort, Vincke Canal, Inland-Hafen-Tor sculpture by Günter
BRK26H81_186

Promenade at the port of Duisburg-Ruhrort, Vincke ...

Demolition of the 120 meter long motorway bridge of the A516, across Teutoburger Straße in
BRK26H82_060

Demolition of the 120 meter long motorway bridge o...

First part of the assembly of the new, 120-meter-long A516 motorway bridge, across Teutoburger
BRK26H82_102

First part of the assembly of the new, 120-meter-l...

The Datteln 4 hard coal-fired power plant, operated by Uniper, on the Dormtund-Ems Canal, scheduled
BRK26H91_215

The Datteln 4 hard coal-fired power plant, operate...

Decommissioned Energie Baden-Württemberg EnBW power plant in Walheim. The former coal-fired power
BRK26H86_301

Decommissioned Energie Baden-Württemberg EnBW powe...

First part of the assembly of the new, 120-meter-long A516 motorway bridge, across Teutoburger
BRK26H93_163

First part of the assembly of the new, 120-meter-l...

Residential buildings in the Meistersiedlung in front of the Datteln 4 power plant, Uniper
BRK26H93_326

Residential buildings in the Meistersiedlung in fr...

Construction site in advanced construction phase, surrounded by trees and vehicles on a neighboring
BRK26H70_390

Construction site in advanced construction phase, ...

Promenade at the port of Duisburg-Ruhrort, Vincke Canal, Inland-Hafen-Tor sculpture by Günter
BRK26H38_352

Promenade at the port of Duisburg-Ruhrort, Vincke ...

First part of the assembly of the new, 120-meter-long A516 motorway bridge, across Teutoburger
BRK26H45_178

First part of the assembly of the new, 120-meter-l...

Demolition of the 120 meter long motorway bridge of the A516, across Teutoburger Straße in
BRK26H45_353

Demolition of the 120 meter long motorway bridge o...

Gasometer Charlottenburg, Gaußstr. 1, construction phase 1911, Berlin, interior view of a large
BRK26H13_473

Gasometer Charlottenburg, Gaußstr. 1, construction...

Construction work at Ulm Central Station: Until January 19, 2026, there will be no long-distance
BRK26H28_315

Construction work at Ulm Central Station: Until Ja...

Bottrop, North Rhine-Westphalia, Germany, The Prosper coking plant is one of three operating coking
BRK26H48_099

Bottrop, North Rhine-Westphalia, Germany, The Pros...

Male Contractor Hands Framing Completed Section of Custom Master Bedroom Design Drawing
BRK26H32_315

Male Contractor Hands Framing Completed Section of...

Male Contractor Hands Framing Completed Section of Custom Kitchen Design Drawing
BRK26H43_142

Male Contractor Hands Framing Completed Section of...

Demolition of the 120 meter long motorway bridge of the A516, across Teutoburger Straße in
BRK26G62_449

Demolition of the 120 meter long motorway bridge o...

Rehabilitation of the A52 motorway near Essen, an 8 km long section between the Essen-Kettwig
BRK26G63_250

Rehabilitation of the A52 motorway near Essen, an ...

First part of the assembly of the new, 120-meter-long A516 motorway bridge, across Teutoburger
BRK26G97_198

First part of the assembly of the new, 120-meter-l...

First part of the assembly of the new, 120-meter-long A516 motorway bridge, across Teutoburger
BRK26G60_427

First part of the assembly of the new, 120-meter-l...

Lignite-fired power plant, RWE Power AG Seurat power plant, wind power plants, 2 units were shut
BRK26G82_375

Lignite-fired power plant, RWE Power AG Seurat pow...

Construction work at Ulm Central Station: Until January 19, 2026, there will be no long-distance
BRK26G53_019

Construction work at Ulm Central Station: Until Ja...

Signpost to the resettlement sites of the 5 villages from the Garzweiler II opencast lignite mining
BRK26G72_022

Signpost to the resettlement sites of the 5 villag...

Horticulture company, flower pots, so-called petunia ampel, grow in a greenhouse, under the glass
BRK26G92_019

Horticulture company, flower pots, so-called petun...

Bottrop, North Rhine-Westphalia, Germany, The Prosper coking plant is one of three operating coking
BRK26G67_408

Bottrop, North Rhine-Westphalia, Germany, The Pros...

Biogas upgrading plant, purification of biogas from organic waste, green waste and contents of the
BRK26G16_011

Biogas upgrading plant, purification of biogas fro...

Digester, pipelines of the biogas plant of the company Reterra, biogas is produced in a digester
BRK26G49_218

Digester, pipelines of the biogas plant of the com...

A BRING THEM HOME NOW! banner hangs in front of the Orthodox Synagogue in Frankfurt's Westend. It
BRK26G43_415

A BRING THEM HOME NOW! banner hangs in front of th...

First part of the assembly of the new, 120-meter-long A516 motorway bridge, across Teutoburger
BRK26G14_469

First part of the assembly of the new, 120-meter-l...

Demolition of the 120 meter long motorway bridge of the A516, across Teutoburger Straße in
BRK26G07_020

Demolition of the 120 meter long motorway bridge o...

Rehabilitation of the A52 motorway near Essen, an 8 km long section between the Essen-Kettwig
BRK26G41_294

Rehabilitation of the A52 motorway near Essen, an ...

First part of the assembly of the new, 120-meter-long A516 motorway bridge, across Teutoburger
BRK26G33_161

First part of the assembly of the new, 120-meter-l...

Construction work at Ulm Central Station: Until January 19, 2026, there will be no long-distance
BRK26G02_472

Construction work at Ulm Central Station: Until Ja...

Construction site for the new central mosque in Feuerbach. The mosque association of the
BRK26G02_468

Construction site for the new central mosque in Fe...

Workers with cutting torches demolishing the 120-meter long motorway bridge of the A516, across
BRK26G49_059

Workers with cutting torches demolishing the 120-m...

New church, St. Petrus, multi-purpose hall, Keyenberg community centre, with Corten steel panels on
BRK26G44_410

New church, St. Petrus, multi-purpose hall, Keyenb...

A woman dressed in elaborate Qing Dynasty attire sits gracefully outdoors in historic Pingyao,
BRK26G36_271

A woman dressed in elaborate Qing Dynasty attire s...

Male Contractor Hands Framing Completed Section of Kitchen Being Built
BRK26G26_024

Male Contractor Hands Framing Completed Section of...

Construction work at Ulm Central Station: Until January 19, 2026, there will be no long-distance
BRK26F52_456

Construction work at Ulm Central Station: Until Ja...

Rehabilitation of the A52 motorway near Essen, an 8 km long section between the Essen-Kettwig
BRK26F84_299

Rehabilitation of the A52 motorway near Essen, an ...

Rehabilitation of the A52 motorway near Essen, an 8 km long section between the Essen-Kettwig
BRK26F59_314

Rehabilitation of the A52 motorway near Essen, an ...

Lippendorf power plant, steam generator, lignite-fired power plant, steam power plant, district
BRK26F54_034

Lippendorf power plant, steam generator, lignite-f...

First part of the assembly of the new, 120-meter-long A516 motorway bridge, across Teutoburger
BRK26F77_238

First part of the assembly of the new, 120-meter-l...

Rehabilitation of the A52 motorway near Essen, an 8 km long section between the Essen-Kettwig
BRK26F82_477

Rehabilitation of the A52 motorway near Essen, an ...

Construction site for the new central mosque in Feuerbach. The mosque association of the
BRK26F53_224

Construction site for the new central mosque in Fe...

Demolition of the 120 meter long motorway bridge of the A516, across Teutoburger Straße in
BRK26F58_062

Demolition of the 120 meter long motorway bridge o...

First part of the assembly of the new, 120-meter-long A516 motorway bridge, across Teutoburger
BRK26F95_040

First part of the assembly of the new, 120-meter-l...

Partial view of 14th century built Santa Maria da Vitoria Monastery, Batalha, Portugal
BRK26F68_032

Partial view of 14th century built Santa Maria da ...

Construction phase of a solar system in fields, photographed from above, Agri PV Bau für
BRK26F58_339

Construction phase of a solar system in fields, ph...

Male Contractor Hands Framing Completed Section of Kitchen Being Built
BRK26F94_156

Male Contractor Hands Framing Completed Section of...

Rehabilitation of the A52 motorway near Essen, an 8 km long section between the Essen-Kettwig
BRK26D49_355

Rehabilitation of the A52 motorway near Essen, an ...

Rehabilitation of the A52 motorway near Essen, an 8 km long section between the Essen-Kettwig
BRK26D43_160

Rehabilitation of the A52 motorway near Essen, an ...

Protest action by the Fridays For Future movement at the Datteln 4 coal-fired power plant, against
BRK26D41_170

Protest action by the Fridays For Future movement ...

Male Contractor Hands Framing Completed Section of Custom Pergola Patio Cover Design Drawing
BRK26D42_487

Male Contractor Hands Framing Completed Section of...

Male Contractor Hands Framing Completed Section of Bathroom Over Bathroom Drawing
BRK26D19_072

Male Contractor Hands Framing Completed Section of...

A woman dressed in traditional Qing dynasty clothing stands on an ornate stone staircase in
BRK26D23_347

A woman dressed in traditional Qing dynasty clothi...

Male Contractor Hands Framing Completed Section of Custom Master Bedroom Design Drawing
BRK26D26_280

Male Contractor Hands Framing Completed Section of...

Demolition of the 120 meter long motorway bridge of the A516, across Teutoburger Straße in
BRK26D48_247

Demolition of the 120 meter long motorway bridge o...

Male Contractor Hands Framing Completed Section of Built In Shelving Over Drawing
BRK26D24_146

Male Contractor Hands Framing Completed Section of...

First part of the assembly of the new, 120-meter-long A516 motorway bridge, across Teutoburger
BRK26E43_340

First part of the assembly of the new, 120-meter-l...

Demolition of the 120 meter long motorway bridge of the A516, across Teutoburger Straße in
BRK26E14_360

Demolition of the 120 meter long motorway bridge o...

Bottrop, North Rhine-Westphalia, Germany, The Prosper coking plant is one of three operating coking
BRK26E32_015

Bottrop, North Rhine-Westphalia, Germany, The Pros...

Male Contractor Hands Framing Completed Section of Custom Kitchen Design Drawing
BRK26E30_201

Male Contractor Hands Framing Completed Section of...

Partial view of 14th century built Santa Maria da Vitoria Monastery, Batalha, Portugal
BRK26E31_085

Partial view of 14th century built Santa Maria da ...

A cheerful young boy in a striped orange t-shirt proudly displays his milk teeth, stretching his
BRK26E45_316

A cheerful young boy in a striped orange t-shirt p...

Thomas Stanley, 1st. Earl of Derby, also known as 2nd Baron Stanley 1435-1504 King of Mann and
BRK26E52_002

Thomas Stanley, 1st. Earl of Derby, also known as ...

Symbol, data centers exponential electricity demand, power supply, lack of power lines, network
BRK26D64_284

Symbol, data centers exponential electricity deman...

First part of the assembly of the new, 120-meter-long A516 motorway bridge, across Teutoburger
BRK26D90_309

First part of the assembly of the new, 120-meter-l...

Workers with cutting torches demolishing the 120-meter long motorway bridge of the A516, across
BRK26D96_076

Workers with cutting torches demolishing the 120-m...

Demolition of the 120 meter long motorway bridge of the A516, across Teutoburger Straße in
BRK26D65_074

Demolition of the 120 meter long motorway bridge o...

Rehabilitation of the A52 motorway near Essen, an 8 km long section between the Essen-Kettwig
BRK26D67_344

Rehabilitation of the A52 motorway near Essen, an ...

  • Page
  • of
  • 8