Période

611 résultats pour : infrastructure project

  • Page
  • sur
  • 7
Connectez-vous pour plus de résultats
Open days on the construction site at the new main railway station started with great public
BRK25G50_133

Open days on the construction site at the new main...

First test run on the new railway line between Stuttgart Airport and Wendlingen. This further
BRK25G50_122

First test run on the new railway line between Stu...

First entrance portal at the new Stuttgart main station completed. One of four so-called lattice
BRK25G53_202

First entrance portal at the new Stuttgart main st...

First entrance portal at the new Stuttgart main station completed. One of four so-called lattice
BRK25G55_469

First entrance portal at the new Stuttgart main st...

Preparations are underway for the Stuttgart 21 open construction site days, where interested
BRK25G50_359

Preparations are underway for the Stuttgart 21 ope...

Roadworks in Brandenburger Straße, shopping street in Potsdam, Brandenburg, Germany, Europe
BRK25G08_267

Roadworks in Brandenburger Straße, shopping street...

Haltern-Marl, North Rhine-Westphalia, Germany - Lippe, flood protection in the
BRK25G10_191

Haltern-Marl, North Rhine-Westphalia, Germany - Li...

Haltern-Marl, North Rhine-Westphalia, Germany - Lippe, flood protection in the
BRK25G11_132

Haltern-Marl, North Rhine-Westphalia, Germany - Li...

Haltern-Marl, North Rhine-Westphalia, Germany - Lippe, flood protection in the
BRK25G13_109

Haltern-Marl, North Rhine-Westphalia, Germany - Li...

Haltern-Marl, North Rhine-Westphalia, Germany - Lippe, flood protection in the
BRK25G10_190

Haltern-Marl, North Rhine-Westphalia, Germany - Li...

Haltern-Marl, North Rhine-Westphalia, Germany - Lippe, flood protection in the
BRK25G10_489

Haltern-Marl, North Rhine-Westphalia, Germany - Li...

Haltern-Marl, North Rhine-Westphalia, Germany - Lippe, flood protection in the
BRK25G12_141

Haltern-Marl, North Rhine-Westphalia, Germany - Li...

Haltern-Marl, North Rhine-Westphalia, Germany - Lippe, flood protection in the
BRK25G12_158

Haltern-Marl, North Rhine-Westphalia, Germany - Li...

Haltern-Marl, North Rhine-Westphalia, Germany - Lippe, flood protection in the
BRK25G08_242

Haltern-Marl, North Rhine-Westphalia, Germany - Li...

Haltern-Marl, North Rhine-Westphalia, Germany - Lippe, flood protection in the
BRK25G11_185

Haltern-Marl, North Rhine-Westphalia, Germany - Li...

Haltern-Marl, North Rhine-Westphalia, Germany - Lippe, flood protection in the
BRK25G11_212

Haltern-Marl, North Rhine-Westphalia, Germany - Li...

Haltern-Marl, North Rhine-Westphalia, Germany - Lippe, flood protection in the
BRK25G08_266

Haltern-Marl, North Rhine-Westphalia, Germany - Li...

Haltern-Marl, North Rhine-Westphalia, Germany - Lippe, flood protection in the
BRK25G12_262

Haltern-Marl, North Rhine-Westphalia, Germany - Li...

Platform apron at Stuttgart main station with a Flixtrain train. Trains still run here. After
BRK25F50_147

Platform apron at Stuttgart main station with a Fl...

AI lettering on computer chips and USA flag, symbolic photo for the American AI project Stargate,
BRK25F90_414

AI lettering on computer chips and USA flag, symbo...

Construction site at the new centre at Potsdamer Platz, Berlin, Germany, Europe
BRK25F08_410

Construction site at the new centre at Potsdamer P...

Modernisation of Duisburg Central Station, the platforms of the 13 tracks are being renewed, 2
BRK25F08_305

Modernisation of Duisburg Central Station, the pla...

Modernisation of Duisburg Central Station, the platforms of the 13 tracks are being renewed, 2
BRK25F08_063

Modernisation of Duisburg Central Station, the pla...

Dilapidated bridges. Aichtal Bridge on the B 312 federal road. 1161 metres long, the bridge needs
BRK25F06_330

Dilapidated bridges. Aichtal Bridge on the B 312 f...

Recklinghausen, Castrop-Rauxel, Ruhr area, North Rhine-Westphalia, Germany - Renaturalised Emscher,
BRK25F07_306

Recklinghausen, Castrop-Rauxel, Ruhr area, North R...

Recklinghausen, Castrop-Rauxel, Ruhr area, North Rhine-Westphalia, Germany - Sports festival in the
BRK25F06_230

Recklinghausen, Castrop-Rauxel, Ruhr area, North R...

The last rails are being welded at the new main station. All the rails are now in place between
BRK25E56_310

The last rails are being welded at the new main st...

Deutsche Bahn AG track construction. A new railway sidings station is being built in
BRK25E66_072

Deutsche Bahn AG track construction. A new railway...

Tracks and points at Rosenstein railway sidings and parked trains. After completion of the
BRK25E74_175

Tracks and points at Rosenstein railway sidings an...

Track apron at Stuttgart main station with S-Bahn. Trains still run here. After completion of the
BRK25E77_295

Track apron at Stuttgart main station with S-Bahn....

The last rails are being welded at the new main station. All the rails are now in place between
BRK25E54_265

The last rails are being welded at the new main st...

The last rails are being welded at the new main station. All the rails are now in place between
BRK25E54_494

The last rails are being welded at the new main st...

Preparations are underway for the Stuttgart 21 open construction site days, where interested
BRK25E68_213

Preparations are underway for the Stuttgart 21 ope...

Tracks and points at Rosenstein railway sidings and parked trains. After completion of the
BRK25E74_212

Tracks and points at Rosenstein railway sidings an...

Preparations are underway for the Stuttgart 21 open construction site days, where interested
BRK25E56_314

Preparations are underway for the Stuttgart 21 ope...

First test run on the new railway line between Stuttgart Airport and Wendlingen. This further
BRK25E56_317

First test run on the new railway line between Stu...

The last rails are being welded at the new main station. All the rails are now in place between
BRK25E50_196

The last rails are being welded at the new main st...

The last rails are being welded at the new main station. All the rails are now in place between
BRK25E67_489

The last rails are being welded at the new main st...

28.10.2020, Oberhausen, Ruhr area, North Rhine-Westphalia, Germany - Emscher, in this not yet
BRK25E74_005

28.10.2020, Oberhausen, Ruhr area, North Rhine-Wes...

Oberhausen, Ruhr area, North Rhine-Westphalia, Germany - Emscher conversion, new Emscher AKE sewer,
BRK25E64_490

Oberhausen, Ruhr area, North Rhine-Westphalia, Ger...

Oberhausen, Ruhr area, North Rhine-Westphalia, Germany - Emscher conversion, new Emscher AKE sewer,
BRK25E79_165

Oberhausen, Ruhr area, North Rhine-Westphalia, Ger...

28.10.2020, Oberhausen, Ruhr area, North Rhine-Westphalia, Germany - Switchgear, electrical
BRK25E69_387

28.10.2020, Oberhausen, Ruhr area, North Rhine-Wes...

28.10.2020, Oberhausen, Ruhr area, North Rhine-Westphalia, Germany - Switchgear, electrical
BRK25E55_363

28.10.2020, Oberhausen, Ruhr area, North Rhine-Wes...

AI lettering on computer chips and USA flag, symbolic photo for the American AI project Stargate
BRK25E95_344

AI lettering on computer chips and USA flag, symbo...

28.10.2020, Oberhausen, Ruhr area, North Rhine-Westphalia, Germany - Emscher conversion, new
BRK25E65_489

28.10.2020, Oberhausen, Ruhr area, North Rhine-Wes...

25.11.2020, Oberhausen, Ruhr area, North Rhine-Westphalia, Germany - Switchgear, electrical
BRK25E19_446

25.11.2020, Oberhausen, Ruhr area, North Rhine-Wes...

Oberhausen, Ruhr area, North Rhine-Westphalia, Germany - switchgear, electrical installation in
BRK25E34_230

Oberhausen, Ruhr area, North Rhine-Westphalia, Ger...

Installation of wastewater pumps in the new Oberhausen pumping station, new Emscher sewer, Emscher
BRK25E70_456

Installation of wastewater pumps in the new Oberha...

Demolition of the old A40 Rhine bridge Neuenkamp, next to it the first part of the new motorway
BRK25E30_207

Demolition of the old A40 Rhine bridge Neuenkamp, ...

Piers and stay cables of the new motorway bridge of the A40, over the Rhine near Duisburg,
BRK25E37_013

Piers and stay cables of the new motorway bridge o...

The new Rhine bridge Neuenkamp, the A40, white pillar ropes, and the old motorway bridge, which is
BRK25E06_364

The new Rhine bridge Neuenkamp, the A40, white pil...

Modernisation of Duisburg Central Station, the platforms of the 13 tracks are being renewed, the
BRK25E08_082

Modernisation of Duisburg Central Station, the pla...

The last rails are being welded at the new main station. All the rails are now in place between
BRK25E28_367

The last rails are being welded at the new main st...

Work on the construction site of the real estate project Stadtquartier Essen 51, in Essen, on the
BRK25E29_095

Work on the construction site of the real estate p...

Construction site Stuttgart 21. heritage-protected Bonatz building with crane. Stuttgart,
BRK25E15_061

Construction site Stuttgart 21. heritage-protected...

Rhine bridge Neuenkamp, motorway A40, behind the first part of the new bridge construction, in
BRK25E20_289

Rhine bridge Neuenkamp, motorway A40, behind the f...

The new Rhine bridge Neuenkamp, the A40, white pillar ropes, and the old motorway bridge, which is
BRK25E44_163

The new Rhine bridge Neuenkamp, the A40, white pil...

The new Rhine bridge Neuenkamp, the A40, white pillar ropes, and the old motorway bridge, which is
BRK25E03_318

The new Rhine bridge Neuenkamp, the A40, white pil...

Construction site, concreting, the foundation of a building is concreted, the concrete is pumped
BRK25E06_344

Construction site, concreting, the foundation of a...

Work on the construction site of the real estate project Stadtquartier Essen 51, in Essen, on the
BRK25E08_085

Work on the construction site of the real estate p...

Construction site, reinforced concrete reinforcement bars, for a building ceiling, are installed
BRK25E11_048

Construction site, reinforced concrete reinforceme...

Modernisation of Duisburg Central Station, the platforms of the 13 tracks are being renewed, the
BRK25E41_197

Modernisation of Duisburg Central Station, the pla...

Construction site, installation of semi-precast floor slabs, which are then filled with in-situ
BRK25E18_100

Construction site, installation of semi-precast fl...

The last rails are being welded at the new main station. All the rails are now in place between
BRK25E38_425

The last rails are being welded at the new main st...

New construction of the motorway bridge Neuenkamp of the A40, over the Rhine near Duisburg, evening
BRK25E05_183

New construction of the motorway bridge Neuenkamp ...

The new Rhine bridge Neuenkamp, the A40, white pillar ropes, and the old motorway bridge, which is
BRK25E47_455

The new Rhine bridge Neuenkamp, the A40, white pil...

New Untertürkheim railway sidings. The track network is being reorganised as part of Stuttgart 21.
BRK25E05_002

New Untertürkheim railway sidings. The track netwo...

The last rails are being welded at the new main station. All the rails are now in place between
BRK25E40_250

The last rails are being welded at the new main st...

Preparations are underway for the Stuttgart 21 open construction site days, where interested
BRK25E40_283

Preparations are underway for the Stuttgart 21 ope...

New construction of the Neuenkamp motorway bridge on the A40, over the Rhine near Duisburg,
BRK25E47_446

New construction of the Neuenkamp motorway bridge ...

Cycle and footpath of the A40 Neuenkamp bridge, piers and stay cables of the new motorway bridge
BRK25E05_206

Cycle and footpath of the A40 Neuenkamp bridge, pi...

New construction of the motorway bridge Neuenkamp of the A40, over the Rhine near Duisburg, evening
BRK25E29_069

New construction of the motorway bridge Neuenkamp ...

Construction site, concreting, the floor slab of a building is concreted, the fresh concrete is
BRK25E41_189

Construction site, concreting, the floor slab of a...

Theme photo Emscher conversion, the Emscher system will be sewage-free in 2021 - new construction
BRK25E06_039

Theme photo Emscher conversion, the Emscher system...

28.10.2020, Oberhausen, Ruhr area, North Rhine-Westphalia, Germany - Emscher, in this not yet
BRK25E05_403

28.10.2020, Oberhausen, Ruhr area, North Rhine-Wes...

Emscher conversion theme photo, the Emscher system will be wastewater-free in 2021 - new
BRK25E09_233

Emscher conversion theme photo, the Emscher system...

Oberhausen, North Rhine-Westphalia, Germany, renaturalisation of the Emscher in the Holtener Bruch.
BRK25E22_379

Oberhausen, North Rhine-Westphalia, Germany, renat...

28.10.2020, Oberhausen, Ruhr area, North Rhine-Westphalia, Germany - Emscher conversion, new
BRK25E49_419

28.10.2020, Oberhausen, Ruhr area, North Rhine-Wes...

Dortmund, North Rhine-Westphalia, Germany - Sunny winter landscape in the Ruhr area, ice and snow
BRK25E16_272

Dortmund, North Rhine-Westphalia, Germany - Sunny ...

28.10.2020, Oberhausen, Ruhr area, North Rhine-Westphalia, Germany - Emscher conversion, new
BRK25E23_420

28.10.2020, Oberhausen, Ruhr area, North Rhine-Wes...

28.10.2020, Oberhausen, Ruhr area, North Rhine-Westphalia, Germany - Excavator during earthworks as
BRK25E27_448

28.10.2020, Oberhausen, Ruhr area, North Rhine-Wes...

Track apron at the main railway station, Europaviertel Stuttgart. After completion of the Stuttgart
BRK25E00_159

Track apron at the main railway station, Europavie...

Dinslaken, Voerde, North Rhine-Westphalia, Germany - New Emscher estuary into the Rhine.
BRK25E09_431

Dinslaken, Voerde, North Rhine-Westphalia, Germany...

28.10.2020, Oberhausen, Ruhr area, North Rhine-Westphalia, Germany - Emscher conversion, new
BRK25E22_367

28.10.2020, Oberhausen, Ruhr area, North Rhine-Wes...

Dinslaken, North Rhine-Westphalia, Germany - Drop structure at the mouth of the Emscher into the
BRK25E24_124

Dinslaken, North Rhine-Westphalia, Germany - Drop ...

Oberhausen, Ruhr area, North Rhine-Westphalia, Germany - Emscher conversion, new Emscher AKE sewer,
BRK25E35_004

Oberhausen, Ruhr area, North Rhine-Westphalia, Ger...

Oberhausen, North Rhine-Westphalia, Germany, renaturalisation of the Emscher in the Holtener Bruch.
BRK25E12_492

Oberhausen, North Rhine-Westphalia, Germany, renat...

Oberhausen, North Rhine-Westphalia, Germany, renaturalisation of the Emscher in the Holtener Bruch.
BRK25E12_493

Oberhausen, North Rhine-Westphalia, Germany, renat...

Oberhausen, North Rhine-Westphalia, Germany, renaturalisation of the Emscher in the Holtener Bruch.
BRK25E19_051

Oberhausen, North Rhine-Westphalia, Germany, renat...

Theme photo Emscher conversion, the Emscher system will be wastewater-free in 2021 - new
BRK25E20_447

Theme photo Emscher conversion, the Emscher system...

Theme photo Emscher conversion, the Emscher system will be sewage-free in 2021 - new construction
BRK25E21_258

Theme photo Emscher conversion, the Emscher system...

Bottrop, North Rhine-Westphalia, Germany - Cyclists ride on the Emscher-Weg, a cycle and footpath
BRK25E23_276

Bottrop, North Rhine-Westphalia, Germany - Cyclist...

Bottrop, North Rhine-Westphalia, Germany - Renaturalised Boye, the tributary of the Emscher, was
BRK25E15_023

Bottrop, North Rhine-Westphalia, Germany - Renatur...

Bottrop, North Rhine-Westphalia, Germany - The Emscher has been completely free of wastewater since
BRK25E20_446

Bottrop, North Rhine-Westphalia, Germany - The Ems...

Oberhausen, North Rhine-Westphalia, Germany, renaturalisation of the Emscher in the Holtener Bruch.
BRK25E04_495

Oberhausen, North Rhine-Westphalia, Germany, renat...

Oberhausen, North Rhine-Westphalia, Germany, renaturalisation of the Emscher in the Holtener Bruch.
BRK25E21_463

Oberhausen, North Rhine-Westphalia, Germany, renat...

Dinslaken, North Rhine-Westphalia, Germany - The Emscher has been completely free of wastewater
BRK25E23_277

Dinslaken, North Rhine-Westphalia, Germany - The E...

Oberhausen, Ruhr area, North Rhine-Westphalia, Germany - Emscher conversion, new Emscher AKE sewer,
BRK25E48_356

Oberhausen, Ruhr area, North Rhine-Westphalia, Ger...

Oberhausen, Ruhr area, North Rhine-Westphalia, Germany - Emscher conversion, new Emscher AKE sewer,
BRK25E13_095

Oberhausen, Ruhr area, North Rhine-Westphalia, Ger...

Untertürkheim railway sidings with construction machinery for track construction. Construction site
BRK25D79_412

Untertürkheim railway sidings with construction ma...

  • Page
  • sur
  • 7