Period

486 results for: tunnel construction site

  • Page
  • of
  • 5
Please sign in for more results
Hofteich or Schönfelder Teich, it was used to supply water for the Freiberg mining industry,
BRK25E12_424

Hofteich or Schönfelder Teich, it was used to supp...

Exhibits on the open-air grounds of the Altenberg Mining Museum, Altenberg, Altenberg, Saxony,
BRK25E12_428

Exhibits on the open-air grounds of the Altenberg ...

The Dittmannsdorfer Teich is a reservoir of the Freiberg district watercourse in Saxony,
BRK25E41_291

The Dittmannsdorfer Teich is a reservoir of the Fr...

Reiche Zeche silver mine, Freiberg, Freiberg, Saxony, Germany, Europe
BRK25E12_425

Reiche Zeche silver mine, Freiberg, Freiberg, Saxo...

Reiche Zeche silver mine, Freiberg, Freiberg, Saxony, Germany, Europe
BRK25E20_339

Reiche Zeche silver mine, Freiberg, Freiberg, Saxo...

Typical Erzgebirge brickwork, Halsbrücke, Halsbrücke, Saxony, Germany, Europe
BRK25E03_139

Typical Erzgebirge brickwork, Halsbrücke, Halsbrüc...

Krupka (German: Graupen) is a town in the Ústecký kraj in the Czech Republic. The well-preserved
BRK25E09_156

Krupka (German: Graupen) is a town in the Ústecký ...

Summer landscape around Geising in the Ore Mountains, Geising, Geising, Saxony, Germany, Europe
BRK25E11_262

Summer landscape around Geising in the Ore Mountai...

Reiche Zeche silver mine, Freiberg, Freiberg, Saxony, Germany, Europe
BRK25E45_279

Reiche Zeche silver mine, Freiberg, Freiberg, Saxo...

Summer landscape around Geising in the Ore Mountains, Geising, Geising, Saxony, Germany, Europe
BRK25E44_209

Summer landscape around Geising in the Ore Mountai...

A barge lift house is a descent structure, an older form of ship lift. In canals that had to
BRK25E44_210

A barge lift house is a descent structure, an olde...

The Dittmannsdorfer Teich is a reservoir of the Freiberg district watercourse in Saxony,
BRK25E28_104

The Dittmannsdorfer Teich is a reservoir of the Fr...

The Old Fathers' Bridge was an aqueduct and the most important water management facility of the
BRK25E12_426

The Old Fathers' Bridge was an aqueduct and the mo...

A barge lift house is a descent structure, an older form of ship lift. In canals that had to
BRK25E45_337

A barge lift house is a descent structure, an olde...

Reiche Zeche silver mine, Freiberg, Freiberg, Saxony, Germany, Europe
BRK25E36_328

Reiche Zeche silver mine, Freiberg, Freiberg, Saxo...

The Obersaida Pond is an artificial pond created in the 18th century in the Obersaida district of
BRK25E37_388

The Obersaida Pond is an artificial pond created i...

A barge lift house is a descent structure, an older form of ship lift. In canals that had to
BRK25E12_427

A barge lift house is a descent structure, an olde...

Memorial stone commemorating the beginning of tin mining in this region. An outstanding monument
BRK25E45_285

Memorial stone commemorating the beginning of tin ...

Gunpowder house: The gunpowder house is located not far from the Überhauen 20 ventilation shaft.
BRK25E18_446

Gunpowder house: The gunpowder house is located no...

485 metre long Filstal bridge under construction between Mühlhausen im Täle and Wiesensteig,
BRK25E02_310

485 metre long Filstal bridge under construction b...

Theme photo Emscher conversion, the Emscher system will be sewage-free in 2021 - new construction
BRK25E06_039

Theme photo Emscher conversion, the Emscher system...

Lined tunnel section in construction lot H53, Brenner Base Tunnel, Wolf, Tyrol, Austria, Europe
BRK25E13_017

Lined tunnel section in construction lot H53, Bren...

Rear section of the Wilma double-shield tunnel boring machine in the H53 construction lot, Brenner
BRK25E13_019

Rear section of the Wilma double-shield tunnel bor...

Saint Barbara niche, tunnel entrance in construction lot H41, Brenner Base Tunnel, Zenzendorf,
BRK25E16_208

Saint Barbara niche, tunnel entrance in constructi...

Tunnel section in construction lot H41, Brenner Base Tunnel, Zenzendorf, Tyrol, Austria, Europe
BRK25E16_209

Tunnel section in construction lot H41, Brenner Ba...

Work on the Wilma double-shield tunnelling machine in the H53 construction lot, Brenner Base
BRK25E20_349

Work on the Wilma double-shield tunnelling machine...

Emscher conversion theme photo, the Emscher system will be wastewater-free in 2021 - new
BRK25E09_233

Emscher conversion theme photo, the Emscher system...

Tunnel subway illuminated with LED light with escalators to the Museumsinsel underground station,
BRK25E12_469

Tunnel subway illuminated with LED light with esca...

U5 underground train in the Museumsinsel station, Berlin, 07/02/2025, Berlin, Berlin, Germany,
BRK25E16_151

U5 underground train in the Museumsinsel station, ...

Lined tunnel section in construction lot H53, Brenner Base Tunnel, Wolf, Tyrol, Austria, Europe
BRK25E05_030

Lined tunnel section in construction lot H53, Bren...

Tubbing segments for Brenner Base Tunnel, Zinzendorf, Tyrol, Austria, Europe
BRK25E05_031

Tubbing segments for Brenner Base Tunnel, Zinzendo...

Cistern for pumping out the water in construction lot H53, Brenner Base Tunnel, Tyrol, Austria,
BRK25E09_179

Cistern for pumping out the water in construction ...

Underground, tunnels in the visitor mine, Rammelsberg ore mine, UNESCO World Heritage Site, Goslar,
BRK25E09_237

Underground, tunnels in the visitor mine, Rammelsb...

Tunnel section in construction lot H53, Brenner Base Tunnel, Tyrol, Austria, Europe
BRK25E05_032

Tunnel section in construction lot H53, Brenner Ba...

Completed tunnel section in construction lot H41, Brenner Base Tunnel, Zenzendorf, Tyrol, Austria,
BRK25E05_033

Completed tunnel section in construction lot H41, ...

Tunnel section in construction lot H41 in the Sill Gorge, Brenner Base Tunnel, Tyrol, Austria,
BRK25E06_105

Tunnel section in construction lot H41 in the Sill...

Workers during a break in the production of segments for the Brenner Base Tunnel, Zenzendorf,
BRK25E09_187

Workers during a break in the production of segmen...

Debris in a tunnel section in construction lot H41, Brenner Base Tunnel, Zenzendorf, Tyrol,
BRK25E11_265

Debris in a tunnel section in construction lot H41...

Tunnel section, construction lot H53 in the Brenner Base Tunnel, Tyrol, Austria, Europe
BRK25E15_080

Tunnel section, construction lot H53 in the Brenne...

Workers in cross-passage 70, construction lot H53, Brenner Base Tunnel, Wolf, Tyrol, Austria,
BRK25E16_210

Workers in cross-passage 70, construction lot H53,...

Theme photo Emscher conversion, the Emscher system will be wastewater-free in 2021 - new
BRK25E20_447

Theme photo Emscher conversion, the Emscher system...

Theme photo Emscher conversion, the Emscher system will be sewage-free in 2021 - new construction
BRK25E21_258

Theme photo Emscher conversion, the Emscher system...

Construction work on a cross-passage in a tunnel section in construction lot H53, Brenner Base
BRK25E00_041

Construction work on a cross-passage in a tunnel s...

Workers producing segments for the Brenner Base Tunnel, Zenzendorf, Tyrol, Austria, Europe
BRK25E16_211

Workers producing segments for the Brenner Base Tu...

Little owl in breeding tube (Athene noctua) North Rhine-Westphalia, Germany, Europe
BRK25D90_387

Little owl in breeding tube (Athene noctua) North ...

Berlin cityscape around the pedestrian tunnel at Messedamm and the central bus station, Berlin,
BRK25D79_192

Berlin cityscape around the pedestrian tunnel at M...

Cistern for pumping out water from the construction site in the H53 construction lot, Brenner Base
BRK25D79_387

Cistern for pumping out water from the constructio...

Completed tunnel section in construction lot H41, Brenner Base Tunnel, Zenzendorf, Tyrol, Austria,
BRK25D79_388

Completed tunnel section in construction lot H41, ...

Themed photo Emscher conversion, the Emscher system will be wastewater-free in 2021 - new
BRK25D78_186

Themed photo Emscher conversion, the Emscher syste...

Emscher conversion theme photo, the Emscher system will be wastewater-free in 2021 - new
BRK25D79_067

Emscher conversion theme photo, the Emscher system...

Graduate engineer (FH) Sebastian Reimann in construction lot H53, Brenner Base Tunnel, Wolf, Tyrol,
BRK25D85_287

Graduate engineer (FH) Sebastian Reimann in constr...

Tunnel section in construction lot H41 in the Sill Gorge, Brenner Base Tunnel, Tyrol, Austria,
BRK25D86_450

Tunnel section in construction lot H41 in the Sill...

Construction work on a cross-passage in a tunnel section in construction lot H53, Brenner Base
BRK25D86_451

Construction work on a cross-passage in a tunnel s...

Theme photo Emscher conversion, the Emscher system will be wastewater-free in 2021 - new
BRK25D77_211

Theme photo Emscher conversion, the Emscher system...

Debris in a tunnel section in construction lot H41, Brenner Base Tunnel, Zenzendorf, Tyrol,
BRK25D82_247

Debris in a tunnel section in construction lot H41...

Theme photo Emscher conversion, the Emscher system will be wastewater-free in 2021 - new
BRK25D91_089

Theme photo Emscher conversion, the Emscher system...

Reichstag building in Berlin Mitte behind Sandbergen due to construction work on the Platz der
BRK25D91_366

Reichstag building in Berlin Mitte behind Sandberg...

Material storage in a tunnel section in construction lot H53, Brenner Base Tunnel, Tyrol, Austria,
BRK25D79_385

Material storage in a tunnel section in constructi...

Two men walking through the tunnel subway illuminated with LED light to the underground station
BRK25D87_074

Two men walking through the tunnel subway illumina...

Theme photo Emscher conversion, the Emscher system will be sewage-free in 2021 - new construction
BRK25D79_068

Theme photo Emscher conversion, the Emscher system...

Debris after a blast, tunnel section in construction lot H53, Brenner Base Tunnel, Wolf, Tyrol,
BRK25D82_246

Debris after a blast, tunnel section in constructi...

Completed tunnel section in construction lot H41, Brenner Base Tunnel, Zenzendorf, Tyrol, Austria,
BRK25D79_386

Completed tunnel section in construction lot H41, ...

Tunnel section, construction lot H53 in the Brenner Base Tunnel, Tyrol, Austria, Europe
BRK25D81_034

Tunnel section, construction lot H53 in the Brenne...

Cable in the tunnel section of construction lot H41, Brenner Base Tunnel, Zenzendorf, Tyrol,
BRK25D83_384

Cable in the tunnel section of construction lot H4...

Tubbing segments for the Brenner Base Tunnel, Zinzendorf, Tyrol, Austria, Europe
BRK25D83_385

Tubbing segments for the Brenner Base Tunnel, Zinz...

Underground, tunnels in the visitor mine, Rammelsberg ore mine, UNESCO World Heritage Site, Goslar,
BRK25D84_229

Underground, tunnels in the visitor mine, Rammelsb...

Blue illuminated Emscher sewer in front of commissioning, Oberhausen, Ruhr area, North
BRK25D85_097

Blue illuminated Emscher sewer in front of commiss...

Rear section of the Wilma double-shield tunnel boring machine in the H53 construction lot, Brenner
BRK25D90_211

Rear section of the Wilma double-shield tunnel bor...

Ventilation hoses in construction lot H41 in the Sill Gorge, Brenner Base Tunnel, Tyrol, Austria,
BRK25D88_166

Ventilation hoses in construction lot H41 in the S...

Lined tunnel section in construction lot H53, Brenner Base Tunnel, Wolf, Tyrol, Austria, Europe
BRK25D89_358

Lined tunnel section in construction lot H53, Bren...

Double-shield tunnel boring machine in section H53 of the Brenner Base Tunnel, Tyrol, Austria,
BRK25D90_210

Double-shield tunnel boring machine in section H53...

Amalfi Coast, Mediterranean Sea, Italy. Website Banner
BRK25D25_221

Amalfi Coast, Mediterranean Sea, Italy. Website Ba...

Rastatt Tunnel construction site on the Rhine Valley line with ICE, Deutsche Bahn AG infrastructure
BRK25D06_096

Rastatt Tunnel construction site on the Rhine Vall...

Construction of the Thames Tunnel, London, 1843
BRK25D27_330

Construction of the Thames Tunnel, London, 1843

Factory for the production of segments for the Brenner Base Tunnel, Zenzendorf, Tyrol, Austria,
BRK25D10_301

Factory for the production of segments for the Bre...

Workers in a tunnel section, construction lot H53 in the Brenner Base Tunnel, Tyrol, Austria,
BRK25D08_219

Workers in a tunnel section, construction lot H53 ...

Workers in lot H53 of the Brenner Base Tunnel, Tyrol, Austria, Europe
BRK25D06_071

Workers in lot H53 of the Brenner Base Tunnel, Tyr...

Tubbing segments for Brenner Base Tunnel, Zenzendorf, Tyrol, Austria, Europe
BRK25D08_278

Tubbing segments for Brenner Base Tunnel, Zenzendo...

Aerial view of the Herne motorway interchange with construction site for the new routing in the
BRK25D11_382

Aerial view of the Herne motorway interchange with...

Little owl in breeding tube (Athene noctua) North Rhine-Westphalia, Germany, Europe
BRK25C66_008

Little owl in breeding tube (Athene noctua) North ...

Little owl in breeding tube (Athene noctua) North Rhine-Westphalia, Germany, Europe
BRK25C96_075

Little owl in breeding tube (Athene noctua) North ...

Tracks, track bed on concrete, tunnel, construction site, underground railway project Stuttgart 21,
BRK25C86_076

Tracks, track bed on concrete, tunnel, constructio...

Workers during a break in the production of segments for the Brenner Base Tunnel, Zenzendorf,
BRK25C59_483

Workers during a break in the production of segmen...

Tunnel subway to Museumsinsel underground station illuminated with LED light, Berlin, 07.02.2025,
BRK25C64_169

Tunnel subway to Museumsinsel underground station ...

Tunnel section in construction lot H41, Brenner Base Tunnel, Zenzendorf, Tyrol, Austria, Europe
BRK25C83_312

Tunnel section in construction lot H41, Brenner Ba...

Graduate engineer (FH) Sebastian Reimann in construction lot H53, Brenner Base Tunnel, Wolf, Tyrol,
BRK25C77_059

Graduate engineer (FH) Sebastian Reimann in constr...

Tunnel section in construction lot H41 in the Sill Gorge, Brenner Base Tunnel, Tyrol, Austria,
BRK25C59_277

Tunnel section in construction lot H41 in the Sill...

Tunnel section in construction lot H41, Brenner Base Tunnel, Zenzendorf, Tyrol, Austria, Europe
BRK25C65_237

Tunnel section in construction lot H41, Brenner Ba...

Ventilation hoses in construction lot H41 in the Sill Gorge, Brenner Base Tunnel, Tyrol, Austria,
BRK25C65_239

Ventilation hoses in construction lot H41 in the S...

Workers in cross-passage 70, construction lot H53 in the Brenner Base Tunnel, Tyrol, Austria,
BRK25C66_128

Workers in cross-passage 70, construction lot H53 ...

Graduate engineer Sebastian Reimann, construction lot H53 in the Brenner Base Tunnel, Tyrol,
BRK25C66_268

Graduate engineer Sebastian Reimann, construction ...

Saint Barbara niche, tunnel entrance in lot H41, Zenzendorf, Tyrol, Austria, Europe
BRK25C77_334

Saint Barbara niche, tunnel entrance in lot H41, Z...

Rear section of the Wilma double-shield tunnel boring machine in the H53 construction lot, Brenner
BRK25C77_335

Rear section of the Wilma double-shield tunnel bor...

Underground, tunnels in the visitor mine, Rammelsberg ore mine, UNESCO World Heritage Site, Goslar,
BRK25C85_449

Underground, tunnels in the visitor mine, Rammelsb...

Tunnel subway to Museumsinsel underground station illuminated with LED light, Berlin, 07.02.2025,
BRK25C90_090

Tunnel subway to Museumsinsel underground station ...

Underground station Museum Island, Berlin, 07.02.2025, Berlin, Berlin, Germany, Europe
BRK25C64_168

Underground station Museum Island, Berlin, 07.02.2...

Workers in a tunnel section at the double-shield tunnel boring machine in section H53 of the
BRK25C68_368

Workers in a tunnel section at the double-shield t...

Tunnel section, construction lot H53 in the Brenner Base Tunnel, Tyrol, Austria, Europe
BRK25C50_059

Tunnel section, construction lot H53 in the Brenne...

Tunnel subway to Museumsinsel underground station illuminated with LED light, Berlin, 07.02.2025,
BRK25C78_267

Tunnel subway to Museumsinsel underground station ...

Theme photo Emscher conversion, the Emscher system will be wastewater-free in 2021 - new
BRK25C87_168

Theme photo Emscher conversion, the Emscher system...

  • Page
  • of
  • 5