Caption
Weighing 130 tonnes, seven metres long and four metres in diameter - the huge boring head for the new supply tunnel at the Nossen Bridge in Dresden has arrived. A special experience for everyone involved today: two cranes from the specialist civil engineering company Eiffage lifted the colossus unerringly and with the utmost concentration into the 20 metre deep excavation pit next to the bridge. SachsenEnergie is building a new underground media tunnel at the Nossen Bridge, in which the district heating, electricity and telecommunications lines will run from autumn 2026, Dresden, Saxony, Germany
Date
Jul 30, 2025
Credit line
Photo12/ImageBROKER/Sylvio Dittrich
Reference
BRK26G53_284
Model release
No
Property release
No
License type
Rights managed
Available size
68.7Mb (22.9Mb) / 20.0in x 13.3in / 6000 x 4000 (300dpi)