Period

623 results for: assemblage

  • Page
  • of
  • 7
Please sign in for more results
Large number of cars on assembly point, Brand Audi, Germany, Europe
BRK25E27_227

Large number of cars on assembly point, Brand Audi...

Large number of cars on assembly point, Brand Audi, Germany, Europe
BRK25E24_260

Large number of cars on assembly point, Brand Audi...

Erection of a wind turbine, wind energy plant, assembly of the third blade, with a crawler lattice
BRK25E31_349

Erection of a wind turbine, wind energy plant, ass...

Erection of a wind turbine, wind energy plant, assembly of the ring generator, with a crawler
BRK25E08_102

Erection of a wind turbine, wind energy plant, ass...

Erection of a wind turbine, wind energy plant, assembly of the ring generator, with a crawler
BRK25E47_460

Erection of a wind turbine, wind energy plant, ass...

Thai women smiling, Flower festival, Chiang Mai, Thailand, Asia
BRK25E23_057

Thai women smiling, Flower festival, Chiang Mai, T...

(Photomontage) Summer time changeover Symbol image: Alarm clock, sunflower and text ALL CLOCKS ON
BRK25E36_314

(Photomontage) Summer time changeover Symbol image...

Erection of a wind turbine, wind energy plant, assembly of the ring generator, with a crawler
BRK25E08_103

Erection of a wind turbine, wind energy plant, ass...

Erection of a wind turbine, wind energy plant, assembly of the third blade, with a crawler lattice
BRK25E03_362

Erection of a wind turbine, wind energy plant, ass...

Erection of a wind turbine, wind energy plant, assembly of the ring generator, with a crawler
BRK25E31_346

Erection of a wind turbine, wind energy plant, ass...

Large number of cars on assembly point, Brand Audi, Germany, Europe
BRK25E39_257

Large number of cars on assembly point, Brand Audi...

Dorsten, North Rhine-Westphalia, Germany, construction of a wind turbine, the first wind turbine of
BRK25E09_037

Dorsten, North Rhine-Westphalia, Germany, construc...

Stellantis, Opel plant, Rüsselsheim, Hesse, Germany, Europe
BRK25E00_397

Stellantis, Opel plant, Rüsselsheim, Hesse, German...

Dortmund, North Rhine-Westphalia, Germany, ThyssenKrupp Steel, FBA 10 hot-dip galvanising line 10,
BRK25E14_462

Dortmund, North Rhine-Westphalia, Germany, Thyssen...

Demonstration by Volkswagen employees on the collective bargaining negotiations between Volkswagen
BRK25E13_045

Demonstration by Volkswagen employees on the colle...

Wearing Batman masks, Volkswagen employees demonstrate in front of the Volkswagen Arena to mark the
BRK25E11_216

Wearing Batman masks, Volkswagen employees demonst...

Large number of cars on assembly point, Brand Audi, Germany, Europe
BRK25D93_350

Large number of cars on assembly point, Brand Audi...

Large number of cars on assembly point, Brand Audi, Germany, Europe
BRK25D96_063

Large number of cars on assembly point, Brand Audi...

Large number of cars on assembly point, Brand Audi, Germany, Europe
BRK25D71_498

Large number of cars on assembly point, Brand Audi...

Large number of cars on assembly point, Brand Audi, Germany, Europe
BRK25D98_113

Large number of cars on assembly point, Brand Audi...

(Photomontage) Summer time changeover Symbolic image: Alarm clock before almond blossom and text 30
BRK25D94_391

(Photomontage) Summer time changeover Symbolic ima...

Large number of cars on assembly point, Brand Audi, Germany, Europe
BRK25D73_296

Large number of cars on assembly point, Brand Audi...

Large number of cars on assembly point, Brand Audi, Germany, Europe
BRK25D98_240

Large number of cars on assembly point, Brand Audi...

Large number of cars on assembly point, Brand Audi, Germany, Europe
BRK25D73_419

Large number of cars on assembly point, Brand Audi...

Dortmund, North Rhine-Westphalia, Germany, ThyssenKrupp Steel, FBA 10 hot-dip galvanising line 10,
BRK25D84_064

Dortmund, North Rhine-Westphalia, Germany, Thyssen...

Dortmund, North Rhine-Westphalia, Germany, ThyssenKrupp Steel, FBA 10 hot-dip galvanising line 10,
BRK25D91_421

Dortmund, North Rhine-Westphalia, Germany, Thyssen...

Daniela Cavallo, Chairwoman of the Volkswagen General Works Council, at a rally of Volkswagen
BRK25D90_232

Daniela Cavallo, Chairwoman of the Volkswagen Gene...

Dorsten, North Rhine-Westphalia, Germany, construction of a wind turbine, the first wind turbine of
BRK25D77_065

Dorsten, North Rhine-Westphalia, Germany, construc...

Dortmund, North Rhine-Westphalia, Germany, ThyssenKrupp Steel, FBA 10 hot-dip galvanising line 10,
BRK25D79_469

Dortmund, North Rhine-Westphalia, Germany, Thyssen...

Volkswagen employees demonstrate with whistles in front of the Volkswagen Arena during the
BRK25D84_074

Volkswagen employees demonstrate with whistles in ...

Dortmund, North Rhine-Westphalia, Germany, ThyssenKrupp Steel, FBA 10 hot-dip galvanising line 10,
BRK25D87_138

Dortmund, North Rhine-Westphalia, Germany, Thyssen...

Dorsten, North Rhine-Westphalia, Germany, construction of a wind turbine, the first wind turbine of
BRK25D76_107

Dorsten, North Rhine-Westphalia, Germany, construc...

Tesla Gigafactory, Grünheide, 07.03.2025, Grünheide, Brandenburg, Germany, Europe
BRK25D76_309

Tesla Gigafactory, Grünheide, 07.03.2025, Grünheid...

The Tesla Gigafactory at the blue hour, Grünheide, 07.03.2025, Grünheide, Brandenburg, Germany,
BRK25D78_093

The Tesla Gigafactory at the blue hour, Grünheide,...

Dorsten, North Rhine-Westphalia, Germany, construction of a wind turbine, the first wind turbine of
BRK25D79_466

Dorsten, North Rhine-Westphalia, Germany, construc...

Volkswagen employees demonstrate in front of the Volkswagen Arena during the collective bargaining
BRK25D92_372

Volkswagen employees demonstrate in front of the V...

Dortmund, North Rhine-Westphalia, Germany, ThyssenKrupp Steel, FBA 10 hot-dip galvanising line 10,
BRK25D89_327

Dortmund, North Rhine-Westphalia, Germany, Thyssen...

Dorsten, North Rhine-Westphalia, Germany, construction of a wind turbine, the first wind turbine of
BRK25D85_437

Dorsten, North Rhine-Westphalia, Germany, construc...

The Tesla Gigafactory at the blue hour, Grünheide, 07.03.2025, Grünheide, Brandenburg, Germany,
BRK25D88_019

The Tesla Gigafactory at the blue hour, Grünheide,...

Production of the Golf at the VW plant on 10. 05. 1979 in Wolfsburg, Germany, Europe
BRK25D27_115

Production of the Golf at the VW plant on 10. 05. ...

Production of the Golf at the VW plant on 10. 05. 1979 in Wolfsburg, Germany, Europe
BRK25D23_079

Production of the Golf at the VW plant on 10. 05. ...

Production of the Golf at the VW plant on 10. 05. 1979 in Wolfsburg, Germany, Europe
BRK25D11_416

Production of the Golf at the VW plant on 10. 05. ...

Production of the Golf at the VW plant on 10. 05. 1979 in Wolfsburg, Germany, Europe
BRK25D12_031

Production of the Golf at the VW plant on 10. 05. ...

Production of the Golf at the VW plant on 10. 05. 1979 in Wolfsburg, Germany, Europe
BRK25D23_080

Production of the Golf at the VW plant on 10. 05. ...

Production of the Golf at the VW plant on 10. 05. 1979 in Wolfsburg, Germany, Europe
BRK25D27_016

Production of the Golf at the VW plant on 10. 05. ...

Production of the Golf at the VW plant on 10. 05. 1979 in Wolfsburg, Germany, Europe
BRK25D15_248

Production of the Golf at the VW plant on 10. 05. ...

Production of the Golf at the VW plant on 10. 05. 1979 in Wolfsburg, Germany, Europe
BRK25D15_302

Production of the Golf at the VW plant on 10. 05. ...

Assembly of photovoltaic. Photovoltaic module PV system Solar module Solar panel Solar system Solar
BRK25D36_240

Assembly of photovoltaic. Photovoltaic module PV s...

Production of the Golf at the VW plant on 10. 05. 1979 in Wolfsburg, Germany, Europe
BRK25D21_149

Production of the Golf at the VW plant on 10. 05. ...

Production of the Golf at the VW plant on 10. 05. 1979 in Wolfsburg, Germany, Europe
BRK25D21_194

Production of the Golf at the VW plant on 10. 05. ...

Production of the Golf at the VW plant on 10. 05. 1979 in Wolfsburg, Germany, Europe
BRK25D26_462

Production of the Golf at the VW plant on 10. 05. ...

Production of the Golf at the VW plant on 10. 05. 1979 in Wolfsburg, Germany, Europe
BRK25D13_366

Production of the Golf at the VW plant on 10. 05. ...

Production of the Golf at the VW plant on 10.05.1979 in Wolfsburg, Germany, Europe
BRK25D17_107

Production of the Golf at the VW plant on 10.05.19...

Production of the Golf at the VW plant on 10. 05. 1979 in Wolfsburg, Germany, Europe
BRK25D24_304

Production of the Golf at the VW plant on 10. 05. ...

Production of the Golf at the VW plant on 10. 05. 1979 in Wolfsburg, Germany, Europe
BRK25D24_326

Production of the Golf at the VW plant on 10. 05. ...

Production of the Golf at the VW plant on 10. 05. 1979 in Wolfsburg, Germany, Europe
BRK25D13_252

Production of the Golf at the VW plant on 10. 05. ...

Production of the Golf at the VW plant on 10. 05. 1979 in Wolfsburg, Germany, Europe
BRK25D17_058

Production of the Golf at the VW plant on 10. 05. ...

Production of the Golf at the VW plant on 10. 05. 1979 in Wolfsburg, Germany, Europe
BRK25D28_027

Production of the Golf at the VW plant on 10. 05. ...

Production of the Golf at the VW plant on 10. 05. 1979 in Wolfsburg, Germany, Europe
BRK25D28_134

Production of the Golf at the VW plant on 10. 05. ...

Detroit, Michigan, Detail of the old Packard auto plant. Designed by Albert Kahn and opened in
BRK25D10_346

Detroit, Michigan, Detail of the old Packard auto ...

Production of the Golf at the VW plant on 10. 05. 1979 in Wolfsburg, Germany, Europe
BRK25D17_059

Production of the Golf at the VW plant on 10. 05. ...

Production of the Golf at the VW plant on 10. 05. 1979 in Wolfsburg, Germany, Europe
BRK25D20_113

Production of the Golf at the VW plant on 10. 05. ...

Production of the Golf at the VW plant on 10. 05. 1979 in Wolfsburg, Germany, Europe
BRK25D12_437

Production of the Golf at the VW plant on 10. 05. ...

Production of the Golf at the VW plant on 10. 05. 1979 in Wolfsburg, Germany, Europe
BRK25D24_041

Production of the Golf at the VW plant on 10. 05. ...

Bike creation workshop
BRK25D24_458

Bike creation workshop

Production of the Golf at the VW plant on 10. 05. 1979 in Wolfsburg, Germany, Europe
BRK25D16_029

Production of the Golf at the VW plant on 10. 05. ...

Production of the Golf at the VW plant on 10. 05. 1979 in Wolfsburg, Germany, Europe
BRK25D16_094

Production of the Golf at the VW plant on 10. 05. ...

Production of the Golf at the VW plant on 10. 05. 1979 in Wolfsburg, Germany, Europe
BRK25D16_129

Production of the Golf at the VW plant on 10. 05. ...

Production of the Golf at the VW plant on 10. 05. 1979 in Wolfsburg, Germany, Europe
BRK25D23_359

Production of the Golf at the VW plant on 10. 05. ...

Production of the Golf at the VW plant on 10. 05. 1979 in Wolfsburg, Germany, Europe
BRK25D27_211

Production of the Golf at the VW plant on 10. 05. ...

Car production at a factory, a conveyor belt for creating new cars, modern robotic technologies, AI
BRK25D19_375

Car production at a factory, a conveyor belt for c...

Thai girls performing local dance during the celebration of King Narai Reign Fair, Lopburi,
BRK25C65_068

Thai girls performing local dance during the celeb...

Assembly of an Enercon E-138 wind turbine, the stator, part of the generator is pulled to the
BRK25C78_071

Assembly of an Enercon E-138 wind turbine, the sta...

Dortmund, North Rhine-Westphalia, Germany, ThyssenKrupp Steel, FBA 10 hot-dip galvanising line 10,
BRK25C78_399

Dortmund, North Rhine-Westphalia, Germany, Thyssen...

The Tesla Gigafactory at the blue hour, Grünheide, 07.03.2025, Grünheide, Brandenburg, Germany,
BRK25C79_469

The Tesla Gigafactory at the blue hour, Grünheide,...

Dortmund, North Rhine-Westphalia, Germany, ThyssenKrupp Steel, FBA 10 hot-dip galvanising line 10,
BRK25C96_300

Dortmund, North Rhine-Westphalia, Germany, Thyssen...

The Tesla Gigafactory at the blue hour, Grünheide, 07.03.2025, Grünheide, Brandenburg, Germany,
BRK25C65_113

The Tesla Gigafactory at the blue hour, Grünheide,...

Dorsten, North Rhine-Westphalia, Germany, construction of a wind turbine, the first wind turbine of
BRK25C66_056

Dorsten, North Rhine-Westphalia, Germany, construc...

Dorsten, North Rhine-Westphalia, Germany, construction of a wind turbine, the first wind turbine of
BRK25C88_163

Dorsten, North Rhine-Westphalia, Germany, construc...

A symbolic VW coffin is carried by Volkswagen employees to the collective bargaining negotiations
BRK25C60_011

A symbolic VW coffin is carried by Volkswagen empl...

Dortmund, North Rhine-Westphalia, Germany, ThyssenKrupp Steel, FBA 10 hot-dip galvanising line 10,
BRK25C81_400

Dortmund, North Rhine-Westphalia, Germany, Thyssen...

Dorsten, North Rhine-Westphalia, Germany, construction of a wind turbine, the first wind turbine of
BRK25C75_400

Dorsten, North Rhine-Westphalia, Germany, construc...

Worker in high-visibility clothing kneeling on cobblestones during construction work next to
BRK25C98_228

Worker in high-visibility clothing kneeling on cob...

A Volkswagen employee demonstrates with a trumpet in front of the Volkswagen Arena during the
BRK25C79_396

A Volkswagen employee demonstrates with a trumpet ...

Dortmund, North Rhine-Westphalia, Germany, ThyssenKrupp Steel, FBA 10 hot-dip galvanising line 10,
BRK25C88_424

Dortmund, North Rhine-Westphalia, Germany, Thyssen...

The Tesla Gigafactory at the blue hour, Grünheide, 07.03.2025, Grünheide, Brandenburg, Germany,
BRK25C74_250

The Tesla Gigafactory at the blue hour, Grünheide,...

Dortmund, North Rhine-Westphalia, Germany, ThyssenKrupp Steel, FBA 10 hot-dip galvanising line 10,
BRK25C86_218

Dortmund, North Rhine-Westphalia, Germany, Thyssen...

Dortmund, North Rhine-Westphalia, Germany, ThyssenKrupp Steel, FBA 10 hot-dip galvanising line 10,
BRK25C87_033

Dortmund, North Rhine-Westphalia, Germany, Thyssen...

Dortmund, North Rhine-Westphalia, Germany, ThyssenKrupp Steel, FBA 10 hot-dip galvanising line 10,
BRK25C60_090

Dortmund, North Rhine-Westphalia, Germany, Thyssen...

The Tesla Gigafactory at the blue hour, Grünheide, 07.03.2025, Grünheide, Brandenburg, Germany,
BRK25C86_279

The Tesla Gigafactory at the blue hour, Grünheide,...

Dorsten, North Rhine-Westphalia, Germany, construction of a wind turbine, the first wind turbine of
BRK25C75_399

Dorsten, North Rhine-Westphalia, Germany, construc...

Dorsten, North Rhine-Westphalia, Germany, construction of a wind turbine, the first wind turbine of
BRK25C76_239

Dorsten, North Rhine-Westphalia, Germany, construc...

Dortmund, North Rhine-Westphalia, Germany, ThyssenKrupp Steel, FBA 10 hot-dip galvanising line 10,
BRK25C91_393

Dortmund, North Rhine-Westphalia, Germany, Thyssen...

Dortmund, North Rhine-Westphalia, Germany, ThyssenKrupp Steel, FBA 10 hot-dip galvanising line 10,
BRK25C75_317

Dortmund, North Rhine-Westphalia, Germany, Thyssen...

The Tesla Gigafactory at the blue hour, Grünheide, 07.03.2025, Grünheide, Brandenburg, Germany,
BRK25C87_174

The Tesla Gigafactory at the blue hour, Grünheide,...

Dorsten, North Rhine-Westphalia, Germany, construction of a wind turbine, the first wind turbine of
BRK25C88_162

Dorsten, North Rhine-Westphalia, Germany, construc...

Demonstration by Volkswagen employees on the collective bargaining negotiations between Volkswagen
BRK25C50_025

Demonstration by Volkswagen employees on the colle...

Volkswagen's Transparent Factory continues to expand its e-charging infrastructure. One of the
BRK25B59_422

Volkswagen's Transparent Factory continues to expa...

Dismantling of a wind power plant in a wind farm near Issum, 9 older wind turbines from the
BRK25B95_446

Dismantling of a wind power plant in a wind farm n...

Silent Spring in the VW Transparent Factory
BRK25B52_116

Silent Spring in the VW Transparent Factory

  • Page
  • of
  • 7