Période

1662 résultats pour : newly built

  • Page
  • sur
  • 17
Connectez-vous pour plus de résultats
First part of the assembly of the new, 120-meter-long A516 motorway bridge, across Teutoburger
BRK26J28_255

First part of the assembly of the new, 120-meter-l...

First part of the assembly of the new, 120-meter-long A516 motorway bridge, across Teutoburger
BRK26J17_375

First part of the assembly of the new, 120-meter-l...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26J09_266

Construction site of the new Bedburg 3 wind farm, ...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26J11_251

Construction site of the new Bedburg 3 wind farm, ...

Demolition of the old A40 Rhine bridge Neuenkamp, next to it the first part of the new motorway
BRK26J43_289

Demolition of the old A40 Rhine bridge Neuenkamp, ...

Demolition of the old A40 Rhine bridge Neuenkamp, next to it the first part of the new motorway
BRK26J44_332

Demolition of the old A40 Rhine bridge Neuenkamp, ...

Buenos-Aires-Kai, Hafencity University HCU, Hafencity Hamburg, new district on the Elbe, on the
BRK26J22_225

Buenos-Aires-Kai, Hafencity University HCU, Hafenc...

Wind turbine repowering, in the Issum-Oermten wind farm, 9 wind turbines in operation for over 20
BRK26J24_069

Wind turbine repowering, in the Issum-Oermten wind...

Deutsche Bahn AG track construction. A new railway siding is being built in Stuttgart-Untertürkheim
BRK26J22_296

Deutsche Bahn AG track construction. A new railway...

Electric wires, electrical cables, wiring in new fuse box in newly built house under construction
BRK26J50_410

Electric wires, electrical cables, wiring in new f...

Modern residential buildings in the new Hubland residential area, built on the site of the former
BRK26J40_325

Modern residential buildings in the new Hubland re...

Glass dome at the Kissingen spa, newly built in 1910, Bad Kissingen, Lower Franconia, Bavaria,
BRK26J52_213

Glass dome at the Kissingen spa, newly built in 19...

First part of the assembly of the new, 120-meter-long A516 motorway bridge, across Teutoburger
BRK26I78_472

First part of the assembly of the new, 120-meter-l...

New bicycle car park at Amsterdam Central Station, IJboulevard, space for around 4000 bicycles,
BRK26J02_225

New bicycle car park at Amsterdam Central Station,...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26I72_479

Construction site of the new Bedburg 3 wind farm, ...

Backdrop of the UNIPER Scholven power plant, in the north of Gelsenkirchen, the former coal-fired
BRK26I77_331

Backdrop of the UNIPER Scholven power plant, in th...

Königsstuhl National Park Centre with the newly built Skywalk and the museum, Rügen,
BRK26I94_342

Königsstuhl National Park Centre with the newly bu...

Construction site of the Böckinger Strasse neighbourhood in Zuffenhausen with bulldozer. A total of
BRK26I81_196

Construction site of the Böckinger Strasse neighbo...

Main station, Stuttgart 21 construction site, where the new through station is being built. Night
BRK26I81_158

Main station, Stuttgart 21 construction site, wher...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26I66_004

Construction site of the new Bedburg 3 wind farm, ...

Dismantling, demolition of the old A1 bridge near Leverkusen, noise barriers, next to it the new
BRK26I94_369

Dismantling, demolition of the old A1 bridge near ...

New buildings on the waterfront in Berlin's Spandau district. The new district is being built on
BRK26I89_312

New buildings on the waterfront in Berlin's Spanda...

European Beaver (Castor fiber), beavers have built a dam with sticks, branches, vegetation and mud,
BRK26I70_134

European Beaver (Castor fiber), beavers have built...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26I22_013

Construction site of the new Bedburg 3 wind farm, ...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26I15_276

Construction site of the new Bedburg 3 wind farm, ...

First part of the assembly of the new, 120-meter-long A516 motorway bridge, across Teutoburger
BRK26I38_418

First part of the assembly of the new, 120-meter-l...

City view of Stuttgart. Construction fence on Königstraße with the inscription: Stuttgart at its
BRK26I33_303

City view of Stuttgart. Construction fence on Köni...

Demolition of the old A40 Rhine bridge Neuenkamp, next to it the first part of the new motorway
BRK26I37_366

Demolition of the old A40 Rhine bridge Neuenkamp, ...

First part of the assembly of the new, 120-meter-long A516 motorway bridge, across Teutoburger
BRK26I46_135

First part of the assembly of the new, 120-meter-l...

Traffic on the A40 Neuenkamp bridge, piers and stay cables of the new motorway bridge over the
BRK26I50_095

Traffic on the A40 Neuenkamp bridge, piers and sta...

Minister of Economics Martin Dulig visited the newly built Bosch semiconductor factory in Dresden
BRK26I03_150

Minister of Economics Martin Dulig visited the new...

New buildings, real estate, promenade, Chmielna, Gdansk Island, Pomeranian Voivodeship, Poland
BRK26I46_442

New buildings, real estate, promenade, Chmielna, G...

The view shows busy Broadway in Lower Manhattan from the newly built Western Union Telegraph
BRK26I14_189

The view shows busy Broadway in Lower Manhattan fr...

Purple sky and clouds over Kuala Lumpur, Malaysia
BRK26I48_021

Purple sky and clouds over Kuala Lumpur, Malaysia

Laotian novices in orange robes in front of a golden Buddha figure in a newly built Buddhist
BRK26H91_174

Laotian novices in orange robes in front of a gold...

Revolving stage, music pavilion at the Kissingen spa, newly built in 1911, Bad Kissingen, Lower
BRK26I50_328

Revolving stage, music pavilion at the Kissingen s...

Large construction site in the new Hubland residential area, built on the site of the former
BRK26I46_325

Large construction site in the new Hubland residen...

Newly built Buddhist monastery and stupas, Tsum Monastry, Tsum Valley, Himalayas, Nepal
BRK26H56_377

Newly built Buddhist monastery and stupas, Tsum Mo...

Total closure of the B10 federal road on the Geislinger Steige. New retaining structures are being
BRK26H77_326

Total closure of the B10 federal road on the Geisl...

New beach huts built on beach platforms, Return of Beach Huts to the Spa initiative, Felixstowe Spa
BRK26H90_260

New beach huts built on beach platforms, Return of...

First part of the assembly of the new, 120-meter-long A516 motorway bridge, across Teutoburger
BRK26H82_102

First part of the assembly of the new, 120-meter-l...

Aprelude to Stuttgart Central Station. Following the completion of the Stuttgart 21 project,
BRK26H53_042

Aprelude to Stuttgart Central Station. Following t...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26H73_175

Construction site of the new Bedburg 3 wind farm, ...

Newly built castle in the style of a Slavic castle, Jakubzburg in Mortka, Lohsa, Saxony, Germany
BRK26H97_466

Newly built castle in the style of a Slavic castle...

Backdrop of the UNIPER Scholven power plant, in the north of Gelsenkirchen, the former coal-fired
BRK26H53_403

Backdrop of the UNIPER Scholven power plant, in th...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26H65_099

Construction site of the new Bedburg 3 wind farm, ...

First part of the assembly of the new, 120-meter-long A516 motorway bridge, across Teutoburger
BRK26H93_163

First part of the assembly of the new, 120-meter-l...

New Town Hall neo-baroque north building built in 1908, new, Paulsplatz, Frankfurt am Main, Hesse,
BRK26H53_404

New Town Hall neo-baroque north building built in ...

New synagogue built in 2010, Magenza, modern building, Neustadt, Mainz, Rhine-Hesse region,
BRK26H54_220

New synagogue built in 2010, Magenza, modern build...

Residential tower block, Potsdamer Straße, Tiergarten, Mitte, Berlin, Germany
BRK26H90_482

Residential tower block, Potsdamer Straße, Tiergar...

First part of the assembly of the new, 120-meter-long A516 motorway bridge, across Teutoburger
BRK26H45_178

First part of the assembly of the new, 120-meter-l...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26H14_276

Construction site of the new Bedburg 3 wind farm, ...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26H29_433

Construction site of the new Bedburg 3 wind farm, ...

Laotian novices in orange robes in front of a golden Buddha figure in a newly built Buddhist
BRK26H34_484

Laotian novices in orange robes in front of a gold...

1930s residential buildings, Berlin, row of newly built residential buildings along a quiet street,
BRK26H45_085

1930s residential buildings, Berlin, row of newly ...

Laotian novices in orange robes in front of a golden Buddha figure in a newly built Buddhist
BRK26H25_375

Laotian novices in orange robes in front of a gold...

Vacancy in the city center of Esslingen. The closure of Karstadt is causing sadness in the
BRK26H13_237

Vacancy in the city center of Esslingen. The closu...

Residential buildings, Loschwitzer Weg, Rudolf Wissell-Siedlung, Staaken, Spandau, Berlin, Germany
BRK26H04_220

Residential buildings, Loschwitzer Weg, Rudolf Wis...

New Untertürkheim railway sidings. The track network is being reorganised as part of Stuttgart 21.
BRK26H01_218

New Untertürkheim railway sidings. The track netwo...

First part of the assembly of the new, 120-meter-long A516 motorway bridge, across Teutoburger
BRK26G97_198

First part of the assembly of the new, 120-meter-l...

First part of the assembly of the new, 120-meter-long A516 motorway bridge, across Teutoburger
BRK26G60_427

First part of the assembly of the new, 120-meter-l...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26G55_149

Construction site of the new Bedburg 3 wind farm, ...

Wind turbine repowering, in the Issum-Oermten wind farm, 9 wind turbines in operation for over 20
BRK26G96_238

Wind turbine repowering, in the Issum-Oermten wind...

Böckinger Strasse neighbourhood construction site in Zuffenhausen. A total of around 460 new flats
BRK26G75_032

Böckinger Strasse neighbourhood construction site ...

Newly built castle in the style of a Slavic castle, Jakubzburg in Mortka, Lohsa, Saxony, Germany
BRK26G78_382

Newly built castle in the style of a Slavic castle...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26G61_144

Construction site of the new Bedburg 3 wind farm, ...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26G57_038

Construction site of the new Bedburg 3 wind farm, ...

New construction of the Neuenkamp motorway bridge on the A40, over the Rhine near Duisburg,
BRK26G85_158

New construction of the Neuenkamp motorway bridge ...

Demolition of the old A40 Rhine bridge Neuenkamp, next to it the first part of the new motorway
BRK26G95_184

Demolition of the old A40 Rhine bridge Neuenkamp, ...

New build, flats, Kurfürstenstraße, Tiergarten, Mitte, Berlin, Germany
BRK26G96_309

New build, flats, Kurfürstenstraße, Tiergarten, Mi...

Accessible hiking trail is currently being built, the Bohlenweg leads through Fulufjället National
BRK26G53_231

Accessible hiking trail is currently being built, ...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26G25_288

Construction site of the new Bedburg 3 wind farm, ...

Wind turbine repowering, in the Issum-Oermten wind farm, 9 wind turbines in operation for over 20
BRK26G31_202

Wind turbine repowering, in the Issum-Oermten wind...

First part of the assembly of the new, 120-meter-long A516 motorway bridge, across Teutoburger
BRK26G14_469

First part of the assembly of the new, 120-meter-l...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26G07_379

Construction site of the new Bedburg 3 wind farm, ...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26G04_495

Construction site of the new Bedburg 3 wind farm, ...

Traffic on the A40 Neuenkamp bridge, piers and stay cables of the new motorway bridge over the
BRK26G38_012

Traffic on the A40 Neuenkamp bridge, piers and sta...

First part of the assembly of the new, 120-meter-long A516 motorway bridge, across Teutoburger
BRK26G33_161

First part of the assembly of the new, 120-meter-l...

Königsstuhl National Park Centre with the newly built Skywalk and the museum, Rügen,
BRK26G29_094

Königsstuhl National Park Centre with the newly bu...

Königsstuhl National Park Centre with the newly built Skywalk and the museum, Rügen,
BRK26G29_210

Königsstuhl National Park Centre with the newly bu...

Neubauten, Am Lokdepot 14, Monumentenstraße, Kreuzberg, Friedrichshain-Kreuzberg, Berlin, Germany
BRK26G49_479

Neubauten, Am Lokdepot 14, Monumentenstraße, Kreuz...

Wind turbine repowering, in the Issum-Oermten wind farm, 9 wind turbines in operation for over 20
BRK26F78_310

Wind turbine repowering, in the Issum-Oermten wind...

First part of the assembly of the new, 120-meter-long A516 motorway bridge, across Teutoburger
BRK26F77_238

First part of the assembly of the new, 120-meter-l...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26F57_381

Construction site of the new Bedburg 3 wind farm, ...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26F63_115

Construction site of the new Bedburg 3 wind farm, ...

First part of the assembly of the new, 120-meter-long A516 motorway bridge, across Teutoburger
BRK26F95_040

First part of the assembly of the new, 120-meter-l...

New beach huts built on beach platforms, Return of Beach Huts to the Spa initiative, Felixstowe Spa
BRK26F96_029

New beach huts built on beach platforms, Return of...

Old unrenovated prefabricated building, Willi-Sänger-Straße, City of Brandenburg an der Havel,
BRK26F54_157

Old unrenovated prefabricated building, Willi-Säng...

Böckinger Strasse neighbourhood construction site in Zuffenhausen. A total of around 460 new flats
BRK26F04_317

Böckinger Strasse neighbourhood construction site ...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26D46_302

Construction site of the new Bedburg 3 wind farm, ...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26D20_425

Construction site of the new Bedburg 3 wind farm, ...

Cycle and footpath of the A40 Neuenkamp bridge, piers and stay cables of the new motorway bridge
BRK26D39_429

Cycle and footpath of the A40 Neuenkamp bridge, pi...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26E17_414

Construction site of the new Bedburg 3 wind farm, ...

New beach huts built on beach platforms, Return of Beach Huts to the Spa initiative, Felixstowe Spa
BRK26E51_113

New beach huts built on beach platforms, Return of...

Newly built castle in the style of a Slavic castle, Jakubzburg in Mortka, Lohsa, Saxony, Germany
BRK26E33_299

Newly built castle in the style of a Slavic castle...

First part of the assembly of the new, 120-meter-long A516 motorway bridge, across Teutoburger
BRK26E43_340

First part of the assembly of the new, 120-meter-l...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26E48_460

Construction site of the new Bedburg 3 wind farm, ...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26E11_216

Construction site of the new Bedburg 3 wind farm, ...

City view of Stuttgart. Construction fence on Königstraße with the inscription: Stuttgart at its
BRK26E24_068

City view of Stuttgart. Construction fence on Köni...

Industrial construction site showing metal support beams, exposed wiring, and a partially built
BRK26E24_191

Industrial construction site showing metal support...

  • Page
  • sur
  • 17