Période

332 résultats pour : mill pit

  • Page
  • sur
  • 4
Connectez-vous pour plus de résultats
Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26J09_266

Construction site of the new Bedburg 3 wind farm, ...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26J11_251

Construction site of the new Bedburg 3 wind farm, ...

20 MWp ground-mounted photovoltaic system, from RWE, with over 36600 solar modules, in a 200 metre
BRK26J16_329

20 MWp ground-mounted photovoltaic system, from RW...

Wind farm in the fog, dark doldrums, no wind no direct sunlight, in the Rhenish lignite mining
BRK26J44_371

Wind farm in the fog, dark doldrums, no wind no di...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26I72_479

Construction site of the new Bedburg 3 wind farm, ...

RWE Power lignite-fired power plant Neurath, RWE wind farm near Grevenbroich, power plant units,
BRK26I92_046

RWE Power lignite-fired power plant Neurath, RWE w...

Dismantling a defective wind turbine, dismantling the two intact wings with a large crane, bent
BRK26I71_421

Dismantling a defective wind turbine, dismantling ...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26I66_004

Construction site of the new Bedburg 3 wind farm, ...

RWE Power brown coal power plant Neurath, RWE wind farm, Jackerath motorway junction, A44 and A61,
BRK26I88_225

RWE Power brown coal power plant Neurath, RWE wind...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26I22_013

Construction site of the new Bedburg 3 wind farm, ...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26I15_276

Construction site of the new Bedburg 3 wind farm, ...

Opencast lignite mine Garzweiler 2, bucket wheel excavator 261 excavating the surface, at the rest
BRK26I44_343

Opencast lignite mine Garzweiler 2, bucket wheel e...

Opencast lignite mine Garzweiler II, bucket wheel excavator dredging, at the edge of the opencast
BRK26I43_099

Opencast lignite mine Garzweiler II, bucket wheel ...

20 MWp ground-mounted photovoltaic system, from RWE, with over 36600 solar modules, in a 200 metre
BRK26I34_063

20 MWp ground-mounted photovoltaic system, from RW...

Defective wind turbine, bent rotor blade, in the Bedburg A44n wind farm, in the Garzweiler
BRK26I42_406

Defective wind turbine, bent rotor blade, in the B...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26H73_175

Construction site of the new Bedburg 3 wind farm, ...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26H65_099

Construction site of the new Bedburg 3 wind farm, ...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26H14_276

Construction site of the new Bedburg 3 wind farm, ...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26H29_433

Construction site of the new Bedburg 3 wind farm, ...

Dismantling a defective wind turbine, dismantling the two intact wings with a large crane, bent
BRK26H41_139

Dismantling a defective wind turbine, dismantling ...

Artisanal cheese production in a rural area around 1910 in Holland. On the right side, a woman is
BRK26H15_117

Artisanal cheese production in a rural area around...

Work on the construction site of the real estate project Stadtquartier Essen 51, in Essen, on the
BRK26G72_057

Work on the construction site of the real estate p...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26G55_149

Construction site of the new Bedburg 3 wind farm, ...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26G61_144

Construction site of the new Bedburg 3 wind farm, ...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26G57_038

Construction site of the new Bedburg 3 wind farm, ...

Dismantling a defective wind turbine, dismantling the two intact wings with a large crane, bent
BRK26G59_247

Dismantling a defective wind turbine, dismantling ...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26G25_288

Construction site of the new Bedburg 3 wind farm, ...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26G07_379

Construction site of the new Bedburg 3 wind farm, ...

Dismantling a defective wind turbine, dismantling the two intact wings with a large crane, bent
BRK26G10_199

Dismantling a defective wind turbine, dismantling ...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26G04_495

Construction site of the new Bedburg 3 wind farm, ...

20 MWp ground-mounted photovoltaic system, from RWE, with over 36600 solar modules, in a 200 metre
BRK26G46_372

20 MWp ground-mounted photovoltaic system, from RW...

RWE Power lignite-fired power plant Neurath, RWE wind farm near Grevenbroich, power plant units,
BRK26F81_376

RWE Power lignite-fired power plant Neurath, RWE w...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26F57_381

Construction site of the new Bedburg 3 wind farm, ...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26F63_115

Construction site of the new Bedburg 3 wind farm, ...

Dismantling a defective wind turbine, dismantling the two intact wings with a large crane, bent
BRK26F62_332

Dismantling a defective wind turbine, dismantling ...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26D46_302

Construction site of the new Bedburg 3 wind farm, ...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26D20_425

Construction site of the new Bedburg 3 wind farm, ...

RWE Power lignite power plant Neurath, conveyor belts in opencast mining, for overburden and coal,
BRK26D55_093

RWE Power lignite power plant Neurath, conveyor be...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26E17_414

Construction site of the new Bedburg 3 wind farm, ...

Königshovener Höhe onshore wind farm, on the A44 motorway near Bedburg, in front of the Jackerath
BRK26E30_220

Königshovener Höhe onshore wind farm, on the A44 m...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26E48_460

Construction site of the new Bedburg 3 wind farm, ...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26E11_216

Construction site of the new Bedburg 3 wind farm, ...

Dismantling a defective wind turbine, dismantling the two intact wings with a large crane, bent
BRK26E28_314

Dismantling a defective wind turbine, dismantling ...

Königshovener Höhe onshore wind farm, on the A44 motorway near Bedburg, in front of the Jackerath
BRK26D86_042

Königshovener Höhe onshore wind farm, on the A44 m...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26D66_285

Construction site of the new Bedburg 3 wind farm, ...

Defective wind turbine, bent rotor blade, in the Bedburg A44n wind farm, in the Garzweiler
BRK26E04_448

Defective wind turbine, bent rotor blade, in the B...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26D72_462

Construction site of the new Bedburg 3 wind farm, ...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26C71_391

Construction site of the new Bedburg 3 wind farm, ...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26C86_351

Construction site of the new Bedburg 3 wind farm, ...

Defective wind turbine, bent rotor blade, in the Bedburg A44n wind farm, in the Garzweiler
BRK26C35_298

Defective wind turbine, bent rotor blade, in the B...

RWE Power brown coal power plant Neurath, RWE wind farm, Jackerath motorway junction, A44 and A61,
BRK26C35_290

RWE Power brown coal power plant Neurath, RWE wind...

Königshovener Höhe onshore wind farm, on the A44 motorway near Bedburg, in front of the Jackerath
BRK26C47_019

Königshovener Höhe onshore wind farm, on the A44 m...

Defective wind turbine, bent rotor blade, in the Bedburg A44n wind farm, in the Garzweiler
BRK26C35_302

Defective wind turbine, bent rotor blade, in the B...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26C35_295

Construction site of the new Bedburg 3 wind farm, ...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26C47_020

Construction site of the new Bedburg 3 wind farm, ...

86.5 MW peak open space photovoltaic systems, from RWE, with over 141, 000 solar modules, on a side
BRK26C35_289

86.5 MW peak open space photovoltaic systems, from...

Defective wind turbine, bent rotor blade, in the Bedburg A44n wind farm, in the Garzweiler
BRK26B76_220

Defective wind turbine, bent rotor blade, in the B...

Defective wind turbine, bent rotor blade, in the Bedburg A44n wind farm, in the Garzweiler
BRK26B76_219

Defective wind turbine, bent rotor blade, in the B...

RWE Power brown coal power plant Neurath, RWE wind farm, Jackerath motorway junction, A44 and A61,
BRK26B76_202

RWE Power brown coal power plant Neurath, RWE wind...

Königshovener Höhe onshore wind farm, on the A44 motorway near Bedburg, in front of the Jackerath
BRK26C00_073

Königshovener Höhe onshore wind farm, on the A44 m...

Königshovener Höhe onshore wind farm, on the A44 motorway near Bedburg, in front of the Jackerath
BRK26C00_074

Königshovener Höhe onshore wind farm, on the A44 m...

The RWE brown coal power plant in Neurath, wind farm, Rhenish lignite mining district of North
BRK26B76_209

The RWE brown coal power plant in Neurath, wind fa...

86.5 MW peak open space photovoltaic systems, from RWE, with over 141, 000 solar modules, on a side
BRK26B76_203

86.5 MW peak open space photovoltaic systems, from...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26C00_075

Construction site of the new Bedburg 3 wind farm, ...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26B76_210

Construction site of the new Bedburg 3 wind farm, ...

The RWE brown coal power plant in Neurath, wind farm, Rhenish lignite mining district of North
BRK26B03_376

The RWE brown coal power plant in Neurath, wind fa...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26B03_370

Construction site of the new Bedburg 3 wind farm, ...

Defective wind turbine, bent rotor blade, in the Bedburg A44n wind farm, in the Garzweiler
BRK26B03_398

Defective wind turbine, bent rotor blade, in the B...

Construction site for the expansion of the wind farm east of Jackerath, in the Rhenish lignite
BRK26B03_371

Construction site for the expansion of the wind fa...

Defective wind turbine, bent rotor blade, in the Bedburg A44n wind farm, in the Garzweiler
BRK26B03_397

Defective wind turbine, bent rotor blade, in the B...

86.5 MW peak open space photovoltaic systems, from RWE, with over 141, 000 solar modules, on a side
BRK26B03_377

86.5 MW peak open space photovoltaic systems, from...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26B03_373

Construction site of the new Bedburg 3 wind farm, ...

20 MW peak solar park on recultivated open-cast areas at the Garzweiler lignite mine, open-air
BRK26B03_369

20 MW peak solar park on recultivated open-cast ar...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26B03_374

Construction site of the new Bedburg 3 wind farm, ...

RWE Power brown coal power plant Neurath, RWE wind farm, Jackerath motorway junction, A44 and A61,
BRK26B03_372

RWE Power brown coal power plant Neurath, RWE wind...

Park guests playing in the bubble foam pit at the Dollywood amusement park in Pigeon Forge, TN
BRK26B50_240

Park guests playing in the bubble foam pit at the ...

Königshovener Höhe onshore wind farm, on the A44 motorway near Bedburg, in front of the Jackerath
BRK26A85_464

Königshovener Höhe onshore wind farm, on the A44 m...

Königshovener Höhe onshore wind farm, on the A44 motorway near Bedburg, in front of the Jackerath
BRK26A85_465

Königshovener Höhe onshore wind farm, on the A44 m...

A44 motorway near Bedburg, in front of the Jackerath triangle, recultivated open-cast mining site,
BRK26A85_466

A44 motorway near Bedburg, in front of the Jackera...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26A85_468

Construction site of the new Bedburg 3 wind farm, ...

Structural change, headframe of the former Lohberg colliery in Dinslaken, 70 metres high, wind farm
BRK26A42_203

Structural change, headframe of the former Lohberg...

A44 motorway near Bedburg, in front of the Jackerath triangle, recultivated open-cast mining site,
BRK26A25_450

A44 motorway near Bedburg, in front of the Jackera...

Königshovener Höhe onshore wind farm, on the A44 motorway near Bedburg, in front of the Jackerath
BRK26A25_449

Königshovener Höhe onshore wind farm, on the A44 m...

Structural change, headframe of the former Lohberg colliery in Dinslaken, 70 metres high, wind farm
BRK26A42_204

Structural change, headframe of the former Lohberg...

Königshovener Höhe onshore wind farm, on the A44 motorway near Bedburg, in front of the Jackerath
BRK26A25_448

Königshovener Höhe onshore wind farm, on the A44 m...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26A25_453

Construction site of the new Bedburg 3 wind farm, ...

Parts of an 86.5 MW peak open-air photovoltaic system, from RWE, with over 141, 000 solar modules,
BRK25M38_448

Parts of an 86.5 MW peak open-air photovoltaic sys...

Bedburg A 44n onshore wind farm, on the A44 motorway near Bedburg, in front of the Jackerath
BRK25M38_440

Bedburg A 44n onshore wind farm, on the A44 motorw...

A44 motorway near Bedburg, in front of the Jackerath triangle, recultivated open-cast mining site,
BRK25M72_347

A44 motorway near Bedburg, in front of the Jackera...

Königshovener Höhe onshore wind farm, on the A44 motorway near Bedburg, in front of the Jackerath
BRK25M38_435

Königshovener Höhe onshore wind farm, on the A44 m...

Königshovener Höhe onshore wind farm, on the A44 motorway near Bedburg, in front of the Jackerath
BRK25M72_349

Königshovener Höhe onshore wind farm, on the A44 m...

86.5 MW peak open-air photovoltaic systems, from RWE, with over 141, 000 solar modules, on a side
BRK25M72_354

86.5 MW peak open-air photovoltaic systems, from R...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK25M72_355

Construction site of the new Bedburg 3 wind farm, ...

Königshovener Höhe onshore wind farm, on the A44 motorway near Bedburg, in front of the Jackerath
BRK25M38_434

Königshovener Höhe onshore wind farm, on the A44 m...

A44 motorway near Bedburg, in front of the Jackerath triangle, recultivated open-cast mining site,
BRK25M38_436

A44 motorway near Bedburg, in front of the Jackera...

86.5 MW peak open-air photovoltaic systems, from RWE, with over 141, 000 solar modules, on a side
BRK25M38_445

86.5 MW peak open-air photovoltaic systems, from R...

Königshovener Höhe onshore wind farm, on the A44 motorway near Bedburg, in front of the Jackerath
BRK25M72_348

Königshovener Höhe onshore wind farm, on the A44 m...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK25M38_439

Construction site of the new Bedburg 3 wind farm, ...

Bedburg A 44n onshore wind farm, on the A44 motorway near Bedburg, in front of the Jackerath
BRK25M38_441

Bedburg A 44n onshore wind farm, on the A44 motorw...

The RWE brown coal power plant in Neurath, wind farm, Rhenish lignite mining district of North
BRK25M38_442

The RWE brown coal power plant in Neurath, wind fa...

  • Page
  • sur
  • 4