Période

664 résultats pour : construction phase

  • Page
  • sur
  • 7
Connectez-vous pour plus de résultats
Partial view of 14th century built Santa Maria da Vitoria Monastery, Batalha, Portugal
BRK26F68_032

Partial view of 14th century built Santa Maria da ...

Construction phase of a solar system in fields, photographed from above, Agri PV Bau für
BRK26F58_339

Construction phase of a solar system in fields, ph...

Male Contractor Hands Framing Completed Section of Kitchen Being Built
BRK26F94_156

Male Contractor Hands Framing Completed Section of...

Rehabilitation of the A52 motorway near Essen, an 8 km long section between the Essen-Kettwig
BRK26D49_355

Rehabilitation of the A52 motorway near Essen, an ...

Rehabilitation of the A52 motorway near Essen, an 8 km long section between the Essen-Kettwig
BRK26D43_160

Rehabilitation of the A52 motorway near Essen, an ...

Protest action by the Fridays For Future movement at the Datteln 4 coal-fired power plant, against
BRK26D41_170

Protest action by the Fridays For Future movement ...

Male Contractor Hands Framing Completed Section of Custom Pergola Patio Cover Design Drawing
BRK26D42_487

Male Contractor Hands Framing Completed Section of...

Male Contractor Hands Framing Completed Section of Bathroom Over Bathroom Drawing
BRK26D19_072

Male Contractor Hands Framing Completed Section of...

A woman dressed in traditional Qing dynasty clothing stands on an ornate stone staircase in
BRK26D23_347

A woman dressed in traditional Qing dynasty clothi...

Male Contractor Hands Framing Completed Section of Custom Master Bedroom Design Drawing
BRK26D26_280

Male Contractor Hands Framing Completed Section of...

Demolition of the 120 meter long motorway bridge of the A516, across Teutoburger Straße in
BRK26D48_247

Demolition of the 120 meter long motorway bridge o...

Male Contractor Hands Framing Completed Section of Built In Shelving Over Drawing
BRK26D24_146

Male Contractor Hands Framing Completed Section of...

First part of the assembly of the new, 120-meter-long A516 motorway bridge, across Teutoburger
BRK26E43_340

First part of the assembly of the new, 120-meter-l...

Demolition of the 120 meter long motorway bridge of the A516, across Teutoburger Straße in
BRK26E14_360

Demolition of the 120 meter long motorway bridge o...

Bottrop, North Rhine-Westphalia, Germany, The Prosper coking plant is one of three operating coking
BRK26E32_015

Bottrop, North Rhine-Westphalia, Germany, The Pros...

Male Contractor Hands Framing Completed Section of Custom Kitchen Design Drawing
BRK26E30_201

Male Contractor Hands Framing Completed Section of...

Partial view of 14th century built Santa Maria da Vitoria Monastery, Batalha, Portugal
BRK26E31_085

Partial view of 14th century built Santa Maria da ...

A cheerful young boy in a striped orange t-shirt proudly displays his milk teeth, stretching his
BRK26E45_316

A cheerful young boy in a striped orange t-shirt p...

Thomas Stanley, 1st. Earl of Derby, also known as 2nd Baron Stanley 1435-1504 King of Mann and
BRK26E52_002

Thomas Stanley, 1st. Earl of Derby, also known as ...

Symbol, data centers exponential electricity demand, power supply, lack of power lines, network
BRK26D64_284

Symbol, data centers exponential electricity deman...

First part of the assembly of the new, 120-meter-long A516 motorway bridge, across Teutoburger
BRK26D90_309

First part of the assembly of the new, 120-meter-l...

Workers with cutting torches demolishing the 120-meter long motorway bridge of the A516, across
BRK26D96_076

Workers with cutting torches demolishing the 120-m...

Demolition of the 120 meter long motorway bridge of the A516, across Teutoburger Straße in
BRK26D65_074

Demolition of the 120 meter long motorway bridge o...

Rehabilitation of the A52 motorway near Essen, an 8 km long section between the Essen-Kettwig
BRK26D67_344

Rehabilitation of the A52 motorway near Essen, an ...

Construction work at Ulm Central Station: Until January 19, 2026, there will be no long-distance
BRK26D98_307

Construction work at Ulm Central Station: Until Ja...

The scrutiny phase to elect a new Pope, papal conclave
BRK26D60_328

The scrutiny phase to elect a new Pope, papal conc...

Male Contractor Hands Framing Completed Section of Custom Pergola Patio Cover Design Drawing
BRK26D84_127

Male Contractor Hands Framing Completed Section of...

Male Contractor Hands Framing Completed Section of Custom Kitchen Design Drawing
BRK26D70_270

Male Contractor Hands Framing Completed Section of...

Male Contractor Hands Framing Completed Section of Built In Shelving Over Drawing
BRK26D79_306

Male Contractor Hands Framing Completed Section of...

Rehabilitation of the A52 motorway near Essen, an 8 km long section between the Essen-Kettwig
BRK26C89_479

Rehabilitation of the A52 motorway near Essen, an ...

Male Contractor Hands Framing Drawing Section of Custom Pergola Patio Cover Design Drawing
BRK26C95_142

Male Contractor Hands Framing Drawing Section of C...

Male Contractor Hands Framing Completed Section of Custom Kitchen Design Drawing
BRK26C75_348

Male Contractor Hands Framing Completed Section of...

Male Contractor Hands Framing Completed Section of Bathroom Over Bathroom Drawing
BRK26C70_362

Male Contractor Hands Framing Completed Section of...

Le Dehus prehistoric passage burial tomb, Vale, Guernsey
BRK26C81_051

Le Dehus prehistoric passage burial tomb, Vale, Gu...

A young woman dressed in traditional Qing Dynasty attire stands gracefully in a historic corridor
BRK26D03_419

A young woman dressed in traditional Qing Dynasty ...

Construction work at Ulm Central Station: Until January 19, 2026, there will be no long-distance
BRK26C57_261

Construction work at Ulm Central Station: Until Ja...

A woman in traditional Qing Dynasty attire stands on a beautifully decorated balcony in Pingyao,
BRK26D03_380

A woman in traditional Qing Dynasty attire stands ...

An interior construction site with exposed beams, scaffolding, and safety nets. Illuminated by
BRK26C75_274

An interior construction site with exposed beams, ...

The scrutiny phase to elect a new Pope, papal conclave
BRK26D02_132

The scrutiny phase to elect a new Pope, papal conc...

Shipping on the Rhine near Duisburg-Homberg, new A40 motorway bridge, Neuenkamp Rhine bridge, first
BRK26C10_460

Shipping on the Rhine near Duisburg-Homberg, new A...

Shipping on the Rhine near Duisburg-Homberg, new A40 motorway bridge, Neuenkamp Rhine bridge, first
BRK26C09_195

Shipping on the Rhine near Duisburg-Homberg, new A...

Construction work at Ulm Central Station: Until January 19, 2026, there will be no long-distance
BRK26C43_322

Construction work at Ulm Central Station: Until Ja...

Demolition of the 160m high cooling towers of the disused Gundremmingen nuclear power plant (AKW
BRK26C47_426

Demolition of the 160m high cooling towers of the ...

Demolition of the 120 meter long motorway bridge of the A516, across Teutoburger Straße in
BRK26C42_148

Demolition of the 120 meter long motorway bridge o...

Demolition of the 120 meter long motorway bridge of the A516, across Teutoburger Straße in
BRK26C42_150

Demolition of the 120 meter long motorway bridge o...

Rehabilitation of the A52 motorway near Essen, an 8 km long section between the Essen-Kettwig
BRK26C49_099

Rehabilitation of the A52 motorway near Essen, an ...

Rehabilitation of the A52 motorway near Essen, an 8 km long section between the Essen-Kettwig
BRK26C49_100

Rehabilitation of the A52 motorway near Essen, an ...

Workers with cutting torches demolishing the 120-meter long motorway bridge of the A516, across
BRK26C42_149

Workers with cutting torches demolishing the 120-m...

Construction site for the new central mosque in Feuerbach. The mosque association of the
BRK26C10_419

Construction site for the new central mosque in Fe...

Rehabilitation of the A52 motorway near Essen, an 8 km long section between the Essen-Kettwig
BRK26C49_097

Rehabilitation of the A52 motorway near Essen, an ...

Rehabilitation of the A52 motorway near Essen, an 8 km long section between the Essen-Kettwig
BRK26C49_095

Rehabilitation of the A52 motorway near Essen, an ...

Rehabilitation of the A52 motorway near Essen, an 8 km long section between the Essen-Kettwig
BRK26C49_098

Rehabilitation of the A52 motorway near Essen, an ...

Rehabilitation of the A52 motorway near Essen, an 8 km long section between the Essen-Kettwig
BRK26C49_103

Rehabilitation of the A52 motorway near Essen, an ...

Workers with cutting torches demolishing the 120-meter long motorway bridge of the A516, across
BRK26B91_060

Workers with cutting torches demolishing the 120-m...

Demolition of the 120 meter long motorway bridge of the A516, across Teutoburger Straße in
BRK26B91_061

Demolition of the 120 meter long motorway bridge o...

Demolition of the 120 meter long motorway bridge of the A516, across Teutoburger Straße in
BRK26B91_062

Demolition of the 120 meter long motorway bridge o...

Workers with cutting torches demolishing the 120-meter long motorway bridge of the A516, across
BRK26B91_063

Workers with cutting torches demolishing the 120-m...

Shipping traffic on the Rhine near Duisburg-Homberg, new A40 motorway, Neuenkamp Rhine bridge,
BRK26B94_110

Shipping traffic on the Rhine near Duisburg-Homber...

Spectators, teethers during the demolition of the 120 meter long motorway bridge of the A516,
BRK26B91_064

Spectators, teethers during the demolition of the ...

Demolition of the 160m high cooling towers of the disused Gundremmingen nuclear power plant (AKW
BRK26C01_420

Demolition of the 160m high cooling towers of the ...

Emsland nuclear power plant, pressurized water reactor, RWE Power AG, EON Kernenergie GmbH, interim
BRK26B09_112

Emsland nuclear power plant, pressurized water rea...

Workers with cutting torches demolishing the 120-meter long motorway bridge of the A516, across
BRK26B23_060

Workers with cutting torches demolishing the 120-m...

Cycle path in the Neulandpark in Leverkusen on the Rhine, in the background the new Rhine bridge of
BRK26B42_112

Cycle path in the Neulandpark in Leverkusen on the...

Rhine bridge Duisburg-Neuenkamp, motorway A40, start of construction of the second bridge, bridge
BRK26B43_468

Rhine bridge Duisburg-Neuenkamp, motorway A40, sta...

Workers with cutting torches demolishing the 120-meter long motorway bridge of the A516, across
BRK26B23_057

Workers with cutting torches demolishing the 120-m...

Demolition of the 120 meter long motorway bridge of the A516, across Teutoburger Straße in
BRK26B23_058

Demolition of the 120 meter long motorway bridge o...

Rehabilitation of the A52 motorway near Essen, an 8 km long section between the Essen-Kettwig
BRK26B40_181

Rehabilitation of the A52 motorway near Essen, an ...

Demolition of the 120 meter long motorway bridge of the A516, across Teutoburger Straße in
BRK26B23_059

Demolition of the 120 meter long motorway bridge o...

Rehabilitation of the A52 motorway near Essen, an 8 km long section between the Essen-Kettwig
BRK26B40_183

Rehabilitation of the A52 motorway near Essen, an ...

Rehabilitation of the A52 motorway near Essen, an 8 km long section between the Essen-Kettwig
BRK26B40_179

Rehabilitation of the A52 motorway near Essen, an ...

Rehabilitation of the A52 motorway near Essen, an 8 km long section between the Essen-Kettwig
BRK26B40_265

Rehabilitation of the A52 motorway near Essen, an ...

Spectators, teethers during the demolition of the 120 meter long motorway bridge of the A516,
BRK26B23_061

Spectators, teethers during the demolition of the ...

Rehabilitation of the A52 motorway near Essen, an 8 km long section between the Essen-Kettwig
BRK26B40_184

Rehabilitation of the A52 motorway near Essen, an ...

Rehabilitation of the A52 motorway near Essen, an 8 km long section between the Essen-Kettwig
BRK26B40_182

Rehabilitation of the A52 motorway near Essen, an ...

Demolition of the 160m high cooling towers of the disused Gundremmingen nuclear power plant (AKW
BRK26B38_285

Demolition of the 160m high cooling towers of the ...

Construction work at Ulm Central Station: Until January 19, 2026, there will be no long-distance
BRK26A67_022

Construction work at Ulm Central Station: Until Ja...

Rehabilitation of the A52 motorway near Essen, an 8 km long section between the Essen-Kettwig
BRK26A89_231

Rehabilitation of the A52 motorway near Essen, an ...

Rehabilitation of the A52 motorway near Essen, an 8 km long section between the Essen-Kettwig
BRK26A89_234

Rehabilitation of the A52 motorway near Essen, an ...

Rehabilitation of the A52 motorway near Essen, an 8 km long section between the Essen-Kettwig
BRK26A89_236

Rehabilitation of the A52 motorway near Essen, an ...

Rhine bridge Duisburg-Neuenkamp, the A40 motorway, start of construction of the second bridge,
BRK26A93_062

Rhine bridge Duisburg-Neuenkamp, the A40 motorway,...

Rehabilitation of the A52 motorway near Essen, an 8 km long section between the Essen-Kettwig
BRK26A89_230

Rehabilitation of the A52 motorway near Essen, an ...

Rehabilitation of the A52 motorway near Essen, an 8 km long section between the Essen-Kettwig
BRK26A89_258

Rehabilitation of the A52 motorway near Essen, an ...

Rehabilitation of the A52 motorway near Essen, an 8 km long section between the Essen-Kettwig
BRK26A89_233

Rehabilitation of the A52 motorway near Essen, an ...

Cycle path in the Neulandpark in Leverkusen on the Rhine, in the background the new Rhine bridge of
BRK26A90_357

Cycle path in the Neulandpark in Leverkusen on the...

Shipping traffic on the Rhine near Duisburg-Homberg, new A40 motorway, Neuenkamp Rhine bridge,
BRK26A68_164

Shipping traffic on the Rhine near Duisburg-Homber...

Rehabilitation of the A52 motorway near Essen, an 8 km long section between the Essen-Kettwig
BRK26A89_235

Rehabilitation of the A52 motorway near Essen, an ...

Rhine bridge Duisburg-Neuenkamp, motorway A40, start of construction of the second bridge, bridge
BRK26A93_059

Rhine bridge Duisburg-Neuenkamp, motorway A40, sta...

Shipping traffic on the Rhine near Duisburg-Homberg, new A40 motorway, Neuenkamp Rhine bridge,
BRK26A68_166

Shipping traffic on the Rhine near Duisburg-Homber...

Rhine bridge Duisburg-Neuenkamp, the A40 motorway, start of construction of the second bridge,
BRK26A93_063

Rhine bridge Duisburg-Neuenkamp, the A40 motorway,...

Shipping traffic on the Rhine near Duisburg-Homberg, new A40 motorway, Neuenkamp Rhine bridge,
BRK26A68_167

Shipping traffic on the Rhine near Duisburg-Homber...

The rising strawberry moon appears between two skyscrapers in Berlin Mitte, Berlin, 11.06.2025
BRK26B00_174

The rising strawberry moon appears between two sky...

People watching the rising moon from the Friedrichsbrücke bridge next to Berlin Cathedral, Berlin,
BRK26B00_173

People watching the rising moon from the Friedrich...

Partially finished high-rise building under construction with modern architectural design, London,
BRK26A51_462

Partially finished high-rise building under constr...

Demolition of the 160m high cooling towers of the disused Gundremmingen nuclear power plant (AKW
BRK26A87_221

Demolition of the 160m high cooling towers of the ...

Structures of a solar plant during the construction phase on green fields, energy transition,
BRK26A80_304

Structures of a solar plant during the constructio...

Close-up of metallic solar frames in the construction phase on a green field under cloudy sky,
BRK26A80_314

Close-up of metallic solar frames in the construct...

Rehabilitation of the A52 motorway near Essen, an 8 km long section between the Essen-Kettwig
BRK26A30_106

Rehabilitation of the A52 motorway near Essen, an ...

Rehabilitation of the A52 motorway near Essen, an 8 km long section between the Essen-Kettwig
BRK26A30_101

Rehabilitation of the A52 motorway near Essen, an ...

Rehabilitation of the A52 motorway near Essen, an 8 km long section between the Essen-Kettwig
BRK26A30_105

Rehabilitation of the A52 motorway near Essen, an ...

Rehabilitation of the A52 motorway near Essen, an 8 km long section between the Essen-Kettwig
BRK26A30_104

Rehabilitation of the A52 motorway near Essen, an ...

  • Page
  • sur
  • 7