Space Shuttle Columbia rolls over from Orbiter Processing Facility bay 1 to the Vehicle Assembly Building to be mated to its external tank/solid rocket booster stack ca. 1997
Sujet

Space Shuttle Columbia rolls over from Orbiter Processing Facility bay 1 to the Vehicle Assembly Building to be mated to its external tank/solid rocket booster stack ca. 1997

Légende

Space Shuttle Columbia rolls over from Orbiter Processing Facility bay 1 to the Vehicle Assembly Building to be mated to its external tank/solid rocket booster stack. Roll out to Pad 39A in preparation for mission STS-83 is set for first motion at 7 a.m. on Tuesday. Launch is currently targeted for April 3 at 2:01 p.m. EST

Info+

.

Date

05 mars 1997

Crédit

Photo12/Universal Images Group

Notre référence

UMG22A40_005

Licence

Droits gérés

Format disponible

9,7Mo (645,5Ko) / 18,9cm x 12,8cm / 2238 x 1512 (300dpi)

Connectez-vous pour télécharger cette image en HD