Légende
A birch wood chair from the furnishings of the Belweder Palace in 1915 — front, top and side views in a scale of 1:5; Maszynski, Mariusz 1888–1944 author; furniture; Belweder Warsaw; Biedermeier style; chair; 19th century; Warsaw Masovian Voivodeship; palaces; World War I 1914–1918; 1915 before November 3, 1915; artistic documentation; drawing; watercolor on card; dimensions when unfolded: height 36.0 cm, width 52.5 cm., The image shows three watercolor illustrations of a wooden chair from different angles on a light beige background: a front view with a curved top rail and a decorative dark central splat above a grey padded seat, a rear view showing a rounded grey backrest with a curved wooden top piece, and a side view revealing the chair's curved back leg, wooden frame, and grey seat cushion; visible colors include shades of brown, grey, black, and beige.
Crédit
Photo12/Liszt Collection
Notre référence
LZT26A07_164
Licence
Droits gérés
Format disponible
71.1Mo (3.1Mo) / 50.8cm x 35.1cm / 6000 x 4141 (300dpi)