Sizewell 'B' Power Station, Leiston, Suffolk Coast, Suffolk, 11/01/1989. Creator: John Laing plc.
Sujet

Sizewell 'B' Power Station, Leiston, Suffolk Coast, Suffolk, 11/01/1989. Creator: John Laing plc.

Légende

A view of the reactor building under construction at Sizewell 'B' Nuclear Power Station, with Sizewell 'A' visible in the background. Sizewell 'B' is one of two nuclear power stations on the Suffolk coast near the village of Sizewell. Sizewell 'A', its predecessor, is in the process of being decommissioned. Sizewell 'B' is a Pressurised Water Reactor (PWR); the first of its kind to be constructed in the UK. John Laing plc were awarded the contract for the main civil engineering work on 19th May 1987. Sizewell 'B' was completed in 1995, after 8 years of construction, and is operated by EDF Energy.

Date

1989

Crédit

Photo12/Heritage Images/Historic England Archive

Notre référence

HRM21B15_415

Model release

Non

Property release

Non

Licence

Droits gérés

Format disponible

78,1Mo (4,2Mo) / 44,0cm x 44,5cm / 5196 x 5256 (300dpi)

Connectez-vous pour télécharger cette image en HD