M1, Junction 10, Slip End, Central Bedfordshire, 24/03/1958. Creator: John Laing plc.
Sujet

M1, Junction 10, Slip End, Central Bedfordshire, 24/03/1958. Creator: John Laing plc.

Légende

Harold Watkinson, the Minister of Transport and Civil Aviation, setting a seal into the concrete inauguration slab for the first section of the London to Yorkshire Motorway at Slip End near Luton. Sir Owen Williams, the Consulting Engineer, is stood next to Harold Watkinson. At the inauguration ceremony, Harold Watkinson also set off a klaxon horn as a signal to the drivers of the excavating machines to begin work. The ceremony was attended by Sir John William Laing and Sir John Maurice Laing. Among the guests were representatives of the five counties which the road will pass through.

Date

1958

Crédit

Photo12/Heritage Images/Historic England

Notre référence

HRM21A84_172

Model release

Non

Property release

Non

Licence

Droits gérés

Format disponible

76,8Mo (3,5Mo) / 44,5cm x 43,2cm / 5252 x 5108 (300dpi)

Connectez-vous pour télécharger cette image en HD