Chelsea Bridge, London, 1858. Artist: Unknown
Sujet

Chelsea Bridge, London, 1858. Artist: Unknown

Légende

Chelsea Bridge, London, 1858. Thomas Page (1803-1877) was the engineer of this suspension bridge over the Thames, which opened in 1858, connecting Chelsea with Battersea on the south bank of the river. The cost of construction was £83,319. When first opened it was a toll bridge, free for foot traffic on Sundays and Bank Holidays. In 1879 tolls were abolished. The bridge was replaced in the 1930s. From The Illustrated London News. (London, September 1858).
Oxford Science Archive

Date

1858

Crédit

Photo12/Heritage Images

Notre référence

HRM19B66_170

Model release

Non

Licence

Droits gérés

Format disponible

49,9Mo (2,9Mo) / 41,3cm x 30,3cm / 4883 x 3574 (300dpi)

Connectez-vous pour télécharger cette image en HD