Légende
New power line from Birkenfeld to Ötisheim in the Enzkreis district, 14-kilometre 380-kV line from transmission system operator TransnetBW for a secure power supply. The new extra-high-voltage line is due to be connected to the grid this year, the lines are currently being installed, Pforzheim, Baden-Württemberg, Germany
Date
26 mars 2024
Crédit
Photo12/ImageBROKER/Arnulf Hettrich
Notre référence
BRK26I03_373
Model release
NA
Property release
Non
Licence
Libre de droits
Format disponible
103.1Mo (34.4Mo) / 62.2cm x 41.5cm / 7349 x 4902 (300dpi)