Légende
Horb high bridge construction site. After completion in 2028, the bridge will relieve the city of Horb from through traffic. The 667 meter long and up to 90 meters high Neckar Valley Bridge on the B 32 federal road is expected to cost around 167 million euros. Drone photo. Horb am Neckar, Baden-Württemberg, Germany
Date
16 juil. 2026
Crédit
Photo12/ImageBROKER/Arnulf Hettrich
Notre référence
BRK26H35_029
Model release
Non
Property release
Non
Licence
Libre de droits
Format disponible
30.8Mo (10.3Mo) / 31.3cm x 24.6cm / 3698 x 2909 (300dpi)