Weighing 130 tonnes, seven metres long and four metres in diameter - the huge boring head for the new supply tunnel at the Nossen Bridge in Dresden has arrived. A special experience for everyone involved today: two cranes from the specialist civil engineering company Eiffage lifted the colossus unerringly and with the utmost concentration into the 20 metre deep excavation pit next to the bridge. SachsenEnergie is building a new underground media tunnel at the Nossen Bridge, in which the district heating, electricity and telecommunications lines will run from autumn 2026, Dresden, Saxony, Germany
Légende

Weighing 130 tonnes, seven metres long and four metres in diameter - the huge boring head for the new supply tunnel at the Nossen Bridge in Dresden has arrived. A special experience for everyone involved today: two cranes from the specialist civil engineering company Eiffage lifted the colossus unerringly and with the utmost concentration into the 20 metre deep excavation pit next to the bridge. SachsenEnergie is building a new underground media tunnel at the Nossen Bridge, in which the district heating, electricity and telecommunications lines will run from autumn 2026, Dresden, Saxony, Germany

Date

30 juil. 2025

Crédit

Photo12/ImageBROKER/Sylvio Dittrich

Notre référence

BRK26G53_284

Model release

Non

Property release

Non

Licence

Droits gérés

Format disponible

68.7Mo (22.9Mo) / 50.8cm x 33.9cm / 6000 x 4000 (300dpi)

Connectez-vous pour télécharger cette image en HD