Légende
Horb high bridge construction site. Once completed in 2028, the bridge will relieve the town of Horb of through traffic. The 667-metre-long and up to 90-metre-high Neckar Valley Bridge on the B 32 federal road is set to cost around 167 million euros. Horb, Baden-Württemberg, Germany
Date
01 juil. 2025
Crédit
Photo12/imageBROKER/Arnulf Hettrich
Notre référence
BRK26C51_275
Model release
Non
Property release
Non
Licence
Libre de droits
Format disponible
105.6Mo (13.3Mo) / 63.0cm x 42.0cm / 7439 x 4962 (300dpi)