Horb high bridge construction site. Once completed in 2028, the bridge will relieve the town of Horb of through traffic. The 667-metre-long and up to 90-metre-high Neckar Valley Bridge on the B 32 federal road is set to cost around 167 million euros. Horb, Baden-Württemberg, Germany
Légende

Horb high bridge construction site. Once completed in 2028, the bridge will relieve the town of Horb of through traffic. The 667-metre-long and up to 90-metre-high Neckar Valley Bridge on the B 32 federal road is set to cost around 167 million euros. Horb, Baden-Württemberg, Germany

Date

01 juil. 2025

Crédit

Photo12/imageBROKER/Arnulf Hettrich

Notre référence

BRK26B43_178

Model release

Non

Property release

Non

Licence

Libre de droits

Format disponible

31,0Mo (3,6Mo) / 37,2cm x 20,9cm / 4394 x 2469 (300dpi)

Connectez-vous pour télécharger cette image en HD