Légende
Horb high bridge construction site. Once completed in 2028, the bridge will relieve the town of Horb of through traffic. The 667-metre-long and up to 90-metre-high Neckar Valley Bridge on the B 32 federal road is set to cost around 167 million euros. Horb, Baden-Württemberg, Germany
Date
01 juil. 2025
Crédit
Photo12/imageBROKER/Arnulf Hettrich
Notre référence
BRK26B43_178
Model release
Non
Property release
Non
Licence
Libre de droits
Format disponible
31,0Mo (3,6Mo) / 37,2cm x 20,9cm / 4394 x 2469 (300dpi)