Légende
Assembly of reinforcing steel for the reinforced concrete foundation of a wind turbine, a mesh of rebar and reinforcing steel mesh, connecting the steel elements with binding wire, twisting with tongs, over 100 tons of reinforcing steel were used, the wind turbine will have a hub height of 160 meters, part of a new wind farm in Sauerland, near Balve, North Rhine-Westphalia, Germany
Date
09 déc. 2025
Crédit
Photo12/imageBROKER/Jochen Tack
Notre référence
BRK25M22_193
Model release
Non
Property release
Non
Licence
Droits gérés
Format disponible
142,4Mo (10,6Mo) / 48,8cm x 73,2cm / 5760 x 8640 (300dpi)