Rail construction in the forest with tunnel opening, surrounded by autumn leaves, Hermann-Hesse-Bahn construction site, Calw, Germany
Légende

Rail construction in the forest with tunnel opening, surrounded by autumn leaves, Hermann-Hesse-Bahn construction site, Calw, Germany

Date

27 oct. 2025

Crédit

Photo12/imageBROKER/Manuel Kamuf

Notre référence

BRK25L00_014

Model release

NA

Property release

Non

Licence

Libre de droits

Format disponible

32.0Mo (3.6Mo) / 23.1cm x 34.7cm / 2731 x 4096 (300dpi)

Connectez-vous pour télécharger cette image en HD