Cyclists at a demo on the 16th construction phase of the A100. Construction site sign due to restriction of the three-lane A100 to two lanes, Berlin, 18.10.2025
Légende

Cyclists at a demo on the 16th construction phase of the A100. Construction site sign due to restriction of the three-lane A100 to two lanes, Berlin, 18.10.2025

Date

17 oct. 2025

Crédit

Photo12/imageBROKER/Stefan Müller

Notre référence

BRK25K90_455

Model release

Non

Property release

Non

Licence

Droits gérés

Format disponible

33,6Mo (2,5Mo) / 35,6cm x 23,7cm / 4200 x 2800 (300dpi)

Connectez-vous pour télécharger cette image en HD