
Légende
Repair Works at a canal lock in North Rhine-Westphalia, along the Wesel-Datteln Canal. The larger lock was completed in 1928 and has lift gates at both ends. It is 222 meters long, 12 meters wide and is designed for a draft of 2.80 meters, with a filling capacity of 26, 500 cubic meters. The inset bollards needed to be replaced in 2022
Date
05 nov. 2022
Crédit
Photo12/imageBROKER/Rudy Fessel
Notre référence
BRK25F80_360
Model release
Non
Property release
Non
Licence
Libre de droits
Format disponible
57,1Mo (6,2Mo) / 46,3cm x 30,9cm / 5472 x 3648 (300dpi)