Repair Works at a canal lock in North Rhine-Westphalia, along the Wesel-Datteln Canal. The larger lock was completed in 1928 and has lift gates at both ends. It is 222 meters long, 12 meters wide and is designed for a draft of 2.80 meters, with a filling capacity of 26, 500 cubic meters. The inset bollards needed to be replaced in 2022
Légende

Repair Works at a canal lock in North Rhine-Westphalia, along the Wesel-Datteln Canal. The larger lock was completed in 1928 and has lift gates at both ends. It is 222 meters long, 12 meters wide and is designed for a draft of 2.80 meters, with a filling capacity of 26, 500 cubic meters. The inset bollards needed to be replaced in 2022