
Légende
Demolished tower of a 20 year old wind turbine, in the Werl wind farm, 5 old Enercon E-66 turbines are demolished, 2 new Siemens SG6.6-170 wind turbines replace them, the 2 new wind turbines produce twice as much energy, 12 MW power, as the 5 old wind turbines, called repowering, demolition work, Werl, North Rhine-Westphalia, Germany, Europe
Date
19 juin 2024
Crédit
Photo12/imageBROKER/Jochen Tack
Notre référence
BRK25E13_199
Model release
NA
Property release
Non
Licence
Droits gérés
Format disponible
138,1Mo (7,3Mo) / 67,9cm x 50,9cm / 8021 x 6016 (300dpi)