
Légende
Dorsten, North Rhine-Westphalia, Germany, construction of a wind turbine, the first wind turbine of the Grosse Heide wind farm. The rotor blades are ready for assembly. A large mobile crane places the tower elements, the rings, on top of each other. This wind turbine will have a rated output of 5, 500 kW, Europe
Date
11 août 2023
Crédit
Photo12/imageBROKER/Rupert Oberhäuser
Notre référence
BRK25E09_037
Model release
NA
Property release
Non
Licence
Droits gérés
Format disponible
46,0Mo (4,0Mo) / 38,6cm x 29,9cm / 4561 x 3526 (300dpi)