Dortmund / Castrop-Rauxel, North Rhine-Westphalia, Germany, river renaturalisation, renaturation of the Emscher, flood retention basin HRB Mengede. A new floodplain landscape is being created at the Emscher-Auen farm, expanding the area for flood protection during heavy rainfall and for biodiversity. The Emscher, which is currently straightened, will be given curves again and can meander through its new floodplain. Following the construction of a parallel sewer, the Emscher has been completely free of wastewater since 2022. The river was previously an open, above-ground combined sewer with rainwater and wastewater, Europe
Légende

Dortmund / Castrop-Rauxel, North Rhine-Westphalia, Germany, river renaturalisation, renaturation of the Emscher, flood retention basin HRB Mengede. A new floodplain landscape is being created at the Emscher-Auen farm, expanding the area for flood protection during heavy rainfall and for biodiversity. The Emscher, which is currently straightened, will be given curves again and can meander through its new floodplain. Following the construction of a parallel sewer, the Emscher has been completely free of wastewater since 2022. The river was previously an open, above-ground combined sewer with rainwater and wastewater, Europe

Date

11 juin 2024

Crédit

Photo12/imageBROKER/Rupert Oberhäuser

Notre référence

BRK25D98_466

Model release

NA

Property release

Non

Licence

Droits gérés

Format disponible

59,8Mo (5,0Mo) / 44,7cm x 33,5cm / 5280 x 3956 (300dpi)

Connectez-vous pour télécharger cette image en HD