Légende
Construction site of the European natural gas pipeline EUGAL near Wrangelsburg Germany on 16.02.2019, this pipeline begins in Lubmin at the landing site of the Nord Stream 1 and 2 Pipline
Date
16 févr. 2019
Crédit
Photo12/imageBROKER/Stefan Dinse
Notre référence
BRK25D65_324
Model release
NA
Property release
Non
Licence
Libre de droits
Format disponible
117.1Mo (7.8Mo) / 66.3cm x 44.2cm / 7836 x 5224 (300dpi)