Légende
Construction site of the European natural gas pipeline EUGAL near Wrangelsburg Germany on 16.02.2019, this pipeline begins in Lubmin at the landing site of the Nord Stream 1 and 2 Pipline
Date
16 févr. 2019
Crédit
Photo12/imageBROKER/Stefan Dinse
Notre référence
BRK25D64_024
Model release
NA
Property release
Non
Licence
Libre de droits
Format disponible
115.9Mo (8.8Mo) / 66.0cm x 44.0cm / 7796 x 5197 (300dpi)