
Sujet
Construction of a high-voltage mast of the South-West Interconnector
Légende
Construction of a high-voltage mast of the South-West Interconnector, a 380 kV high-voltage line between Saxony-Anhalt and Bavaria, for the transmission system operator 50Hertz, mounting a crossbar to a transmission mast, Wipfratal, Thuringia, Germany, Europe
Date
24 oct. 2013
Crédit
Photo12/imageBROKER/Rolf Schulten
Notre référence
BRK19G26_051
Model release
Non
Property release
NA
Licence
Droits gérés
Format disponible
60,2Mo (993,4Ko) / 47,5cm x 31,7cm / 5616 x 3744 (300dpi)