Berkhamsted Station
Sujet

Berkhamsted Station

Légende

Berkhamsted Station, Hertfordshire, on the London and Birmingham Railway, c1860. On top of the building on the left is a water tank for supplying locomotives while, on the right, cattle are being driven to the station over a bridge crossing the Grand Junction Canal. The London and Birmingham railway was completed by the autumn of 1838. Robert Stephenson (1803-1859) was the Chief Engineer. Many people opposed the route and forced Stephenson to move the line some distance from their towns. The 112 mile line took 20,000 men 5 years to build. From "The Land We Live In". (London, c1860). Engraving.

Info+

Photos12.com - Ann Ronan Picture Library

Crédit

Photo12/Ann Ronan Picture Library

Notre référence

ARP07104_460001209

Licence

Droits gérés

Format disponible

25,2Mo (2,8Mo) / 30,0cm x 21,0cm / 3543 x 2483 (300dpi)

Connectez-vous pour télécharger cette image en HD