Period

1166 results for: Garzweiler

  • Page
  • of
  • 12
Please sign in for more results
Start of the eviction of the hamlet Lützerath at the lignite mine Garzweiler 2, preparation for the
BRK26J51_117

Start of the eviction of the hamlet Lützerath at t...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26J09_266

Construction site of the new Bedburg 3 wind farm, ...

Protest action against the demolition of the village of Lützerath in the Rhenish lignite mining
BRK26J45_233

Protest action against the demolition of the villa...

Beginning of the eviction of the Lützerath hamlet, camp of climate activists and squatters, at the
BRK26J25_148

Beginning of the eviction of the Lützerath hamlet,...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26J11_251

Construction site of the new Bedburg 3 wind farm, ...

Barricades, obstacles, in the camp of climate activists in the rest of the village of Lützerath,
BRK26J33_171

Barricades, obstacles, in the camp of climate acti...

The village of Keyenberg at the Garzweiler II open-cast lignite mining area, the original village
BRK26J35_119

The village of Keyenberg at the Garzweiler II open...

Garzweiler opencast lignite mine, bucket wheel excavator undergoing maintenance and repair, near
BRK26J22_473

Garzweiler opencast lignite mine, bucket wheel exc...

Resettlement site of the 5 villages from the Garzweiler II opencast lignite mining area, Keyenberg,
BRK26J44_290

Resettlement site of the 5 villages from the Garzw...

Closed restaurant in the village of Keyenberg in the Garzweiler II open-cast lignite mining area,
BRK26J25_453

Closed restaurant in the village of Keyenberg in t...

Wind farm in the fog, dark doldrums, no wind no direct sunlight, in the Rhenish lignite mining
BRK26J44_371

Wind farm in the fog, dark doldrums, no wind no di...

20 MWp ground-mounted photovoltaic system, from RWE, with over 36600 solar modules, in a 200 metre
BRK26J16_329

20 MWp ground-mounted photovoltaic system, from RW...

The resettlement site of the 5 villages from the Garzweiler II opencast lignite mining area,
BRK26J33_386

The resettlement site of the 5 villages from the G...

Edge of the Garzweiler II open-cast lignite mine, at the village of Lützerath, the last village to
BRK26J00_462

Edge of the Garzweiler II open-cast lignite mine, ...

The village of Keyenberg at the Garzweiler II open-cast lignite mining area, the original village
BRK26I81_067

The village of Keyenberg at the Garzweiler II open...

Edge of the Garzweiler II open-cast lignite mine, at the village of Lützerath, the last village to
BRK26I92_320

Edge of the Garzweiler II open-cast lignite mine, ...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26I72_479

Construction site of the new Bedburg 3 wind farm, ...

20 MWp ground-mounted photovoltaic system, from RWE, with over 36600 solar modules, in a 200 metre
BRK26I94_207

20 MWp ground-mounted photovoltaic system, from RW...

Dismantling a defective wind turbine, dismantling the two intact wings with a large crane, bent
BRK26I71_421

Dismantling a defective wind turbine, dismantling ...

Closed restaurant in the village of Keyenberg in the Garzweiler II open-cast lignite mining area,
BRK26I75_419

Closed restaurant in the village of Keyenberg in t...

The village of Keyenberg at the Garzweiler II open-cast lignite mining area, the original village
BRK26I88_290

The village of Keyenberg at the Garzweiler II open...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26I66_004

Construction site of the new Bedburg 3 wind farm, ...

2nd day of the clearing of the hamlet Lützerath, by the police, of tree houses and huts, of climate
BRK26I90_330

2nd day of the clearing of the hamlet Lützerath, b...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26I22_013

Construction site of the new Bedburg 3 wind farm, ...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26I15_276

Construction site of the new Bedburg 3 wind farm, ...

The village of Keyenberg at the Garzweiler II open-cast lignite mining area, the original village
BRK26I42_131

The village of Keyenberg at the Garzweiler II open...

Opencast lignite mine Garzweiler 2, bucket wheel excavator 261 excavating the surface, at the rest
BRK26I44_343

Opencast lignite mine Garzweiler 2, bucket wheel e...

Start of the eviction of the hamlet Lützerath at the lignite mine Garzweiler 2, preparation for the
BRK26I49_424

Start of the eviction of the hamlet Lützerath at t...

Opencast lignite mine Garzweiler II, bucket wheel excavator dredging, at the edge of the opencast
BRK26I43_099

Opencast lignite mine Garzweiler II, bucket wheel ...

Demonstration against the demolition of the lignite village of Lützerath, from the village of
BRK26I46_149

Demonstration against the demolition of the lignit...

20 MWp ground-mounted photovoltaic system, from RWE, with over 36600 solar modules, in a 200 metre
BRK26I34_063

20 MWp ground-mounted photovoltaic system, from RW...

Defective wind turbine, bent rotor blade, in the Bedburg A44n wind farm, in the Garzweiler
BRK26I42_406

Defective wind turbine, bent rotor blade, in the B...

Grevenbroich, North Rhine-Westphalia, Germany, RWE Power AG Neurath power plant, lignite-fired
BRK26I32_490

Grevenbroich, North Rhine-Westphalia, Germany, RWE...

Grevenbroich, North Rhine-Westphalia, Germany, Wind turbines in the wind farm in front of RWE's
BRK26I44_358

Grevenbroich, North Rhine-Westphalia, Germany, Win...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26H73_175

Construction site of the new Bedburg 3 wind farm, ...

Edge of the Garzweiler II open-cast lignite mine, at the village of Lützerath, which is the last
BRK26H96_043

Edge of the Garzweiler II open-cast lignite mine, ...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26H65_099

Construction site of the new Bedburg 3 wind farm, ...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26H14_276

Construction site of the new Bedburg 3 wind farm, ...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26H29_433

Construction site of the new Bedburg 3 wind farm, ...

Dismantling a defective wind turbine, dismantling the two intact wings with a large crane, bent
BRK26H41_139

Dismantling a defective wind turbine, dismantling ...

Edge of the Garzweiler II open-cast lignite mine, at the village of Lützerath, the last village to
BRK26H49_158

Edge of the Garzweiler II open-cast lignite mine, ...

Edge of the Garzweiler II open-cast lignite mine, at the village of Lützerath, the last village to
BRK26G69_197

Edge of the Garzweiler II open-cast lignite mine, ...

Edge of the Garzweiler II open-cast lignite mine, excavator, at the village of Lützerath, the last
BRK26G74_377

Edge of the Garzweiler II open-cast lignite mine, ...

Demonstration against the demolition of the lignite village of Lützerath, from the village of
BRK26G75_131

Demonstration against the demolition of the lignit...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26G55_149

Construction site of the new Bedburg 3 wind farm, ...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26G61_144

Construction site of the new Bedburg 3 wind farm, ...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26G57_038

Construction site of the new Bedburg 3 wind farm, ...

Dismantling a defective wind turbine, dismantling the two intact wings with a large crane, bent
BRK26G59_247

Dismantling a defective wind turbine, dismantling ...

Signpost to the resettlement sites of the 5 villages from the Garzweiler II opencast lignite mining
BRK26G72_022

Signpost to the resettlement sites of the 5 villag...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26G25_288

Construction site of the new Bedburg 3 wind farm, ...

Garzweiler 2 opencast lignite mine, Neurath lignite-fired power plant, wind turbine, traffic on the
BRK26G29_422

Garzweiler 2 opencast lignite mine, Neurath lignit...

Opencast lignite mine Garzweiler 2, bucket wheel excavator 261 excavating the surface, at the rest
BRK26G33_297

Opencast lignite mine Garzweiler 2, bucket wheel e...

Start of the eviction of the hamlet Lützerath at the lignite mine Garzweiler 2, activists try to
BRK26G35_206

Start of the eviction of the hamlet Lützerath at t...

Edge of the Garzweiler II open-cast lignite mine, at the village of Lützerath, the last village to
BRK26G35_083

Edge of the Garzweiler II open-cast lignite mine, ...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26G07_379

Construction site of the new Bedburg 3 wind farm, ...

Dismantling a defective wind turbine, dismantling the two intact wings with a large crane, bent
BRK26G10_199

Dismantling a defective wind turbine, dismantling ...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26G04_495

Construction site of the new Bedburg 3 wind farm, ...

20 MWp ground-mounted photovoltaic system, from RWE, with over 36600 solar modules, in a 200 metre
BRK26G46_372

20 MWp ground-mounted photovoltaic system, from RW...

Grevenbroich, North Rhine-Westphalia, Germany, RWE Power AG Neurath power station, lignite-fired
BRK26G42_239

Grevenbroich, North Rhine-Westphalia, Germany, RWE...

New church, St. Petrus, multi-purpose hall, Keyenberg community centre, with Corten steel panels on
BRK26G44_410

New church, St. Petrus, multi-purpose hall, Keyenb...

Opencast lignite mine Garzweiler 2, excavator 285, bucket wheel excavator, considered to be the
BRK26F92_195

Opencast lignite mine Garzweiler 2, excavator 285,...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26F57_381

Construction site of the new Bedburg 3 wind farm, ...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26F63_115

Construction site of the new Bedburg 3 wind farm, ...

Dismantling a defective wind turbine, dismantling the two intact wings with a large crane, bent
BRK26F62_332

Dismantling a defective wind turbine, dismantling ...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26D46_302

Construction site of the new Bedburg 3 wind farm, ...

Garzweiler opencast lignite mine, bucket wheel excavator undergoing maintenance and repair, near
BRK26D20_338

Garzweiler opencast lignite mine, bucket wheel exc...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26D20_425

Construction site of the new Bedburg 3 wind farm, ...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26E17_414

Construction site of the new Bedburg 3 wind farm, ...

Königshovener Höhe onshore wind farm, on the A44 motorway near Bedburg, in front of the Jackerath
BRK26E30_220

Königshovener Höhe onshore wind farm, on the A44 m...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26E48_460

Construction site of the new Bedburg 3 wind farm, ...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26E11_216

Construction site of the new Bedburg 3 wind farm, ...

Dismantling a defective wind turbine, dismantling the two intact wings with a large crane, bent
BRK26E28_314

Dismantling a defective wind turbine, dismantling ...

Beginning of the eviction of the Lützerath hamlet, camp of climate activists and squatters, at the
BRK26D99_035

Beginning of the eviction of the Lützerath hamlet,...

Königshovener Höhe onshore wind farm, on the A44 motorway near Bedburg, in front of the Jackerath
BRK26D86_042

Königshovener Höhe onshore wind farm, on the A44 m...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26D66_285

Construction site of the new Bedburg 3 wind farm, ...

Defective wind turbine, bent rotor blade, in the Bedburg A44n wind farm, in the Garzweiler
BRK26E04_448

Defective wind turbine, bent rotor blade, in the B...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26D72_462

Construction site of the new Bedburg 3 wind farm, ...

Lignite opencast mine Garzweiler, bucket wheel excavator mining overburden, coal, near Jüchen,
BRK26C95_459

Lignite opencast mine Garzweiler, bucket wheel exc...

Opencast lignite mine with spreader and motorway in the background, Garzweiler, Jüchen, North
BRK26C58_348

Opencast lignite mine with spreader and motorway i...

Jüchen, North Rhine-Westphalia, Germany - Rhenish lignite mining area, bucket wheel excavator in
BRK26C59_169

Jüchen, North Rhine-Westphalia, Germany - Rhenish ...

Opencast lignite mine Garzweiler 2, bucket wheel excavator 261 excavating the surface, at the rest
BRK26C87_017

Opencast lignite mine Garzweiler 2, bucket wheel e...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26C71_391

Construction site of the new Bedburg 3 wind farm, ...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26C86_351

Construction site of the new Bedburg 3 wind farm, ...

86, 5 MW peak ground-mounted photovoltaic systems, by RWE, with over 141, 000 solar modules, on a
BRK26C48_418

86, 5 MW peak ground-mounted photovoltaic systems,...

Defective wind turbine, bent rotor blade, in the Bedburg A44n wind farm, in the Garzweiler
BRK26C35_298

Defective wind turbine, bent rotor blade, in the B...

Garzweiler II coal mine, view from Jackerath viewpoint, waste bin with funnel, North
BRK26C35_292

Garzweiler II coal mine, view from Jackerath viewp...

Königshovener Höhe onshore wind farm, on the A44 motorway near Bedburg, in front of the Jackerath
BRK26C47_019

Königshovener Höhe onshore wind farm, on the A44 m...

Defective wind turbine, bent rotor blade, in the Bedburg A44n wind farm, in the Garzweiler
BRK26C35_302

Defective wind turbine, bent rotor blade, in the B...

Garzweiler II coal mine, view from Jackerath viewpoint, waste bin with funnel, North
BRK26B76_213

Garzweiler II coal mine, view from Jackerath viewp...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26C35_295

Construction site of the new Bedburg 3 wind farm, ...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26C47_020

Construction site of the new Bedburg 3 wind farm, ...

86.5 MW peak open space photovoltaic systems, from RWE, with over 141, 000 solar modules, on a side
BRK26C35_289

86.5 MW peak open space photovoltaic systems, from...

Defective wind turbine, bent rotor blade, in the Bedburg A44n wind farm, in the Garzweiler
BRK26B76_220

Defective wind turbine, bent rotor blade, in the B...

Defective wind turbine, bent rotor blade, in the Bedburg A44n wind farm, in the Garzweiler
BRK26B76_219

Defective wind turbine, bent rotor blade, in the B...

Königshovener Höhe onshore wind farm, on the A44 motorway near Bedburg, in front of the Jackerath
BRK26C00_073

Königshovener Höhe onshore wind farm, on the A44 m...

Königshovener Höhe onshore wind farm, on the A44 motorway near Bedburg, in front of the Jackerath
BRK26C00_074

Königshovener Höhe onshore wind farm, on the A44 m...

86.5 MW peak open space photovoltaic systems, from RWE, with over 141, 000 solar modules, on a side
BRK26B76_203

86.5 MW peak open space photovoltaic systems, from...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26C00_075

Construction site of the new Bedburg 3 wind farm, ...

20 MWp open-air photovoltaic system, from RWE, with over 36600 solar modules, in a 200 meter edge,
BRK26B76_208

20 MWp open-air photovoltaic system, from RWE, wit...

Construction site of the new Bedburg 3 wind farm, on recultivated open-cast mining site, 9 wind
BRK26B76_210

Construction site of the new Bedburg 3 wind farm, ...

  • Page
  • of
  • 12