Title
Tightening a nut on a guide vane operating seromotor in TVA's..., Watts Bar Dam, Tennessee, 1942. Creator: Alfred T Palmer.
Caption
Tightening a nut on a guide vane operating seromotor in TVA's hydroelectric plant, Watts Bar Dam, Tennessee. Located 530 miles above the mouth of the Tennessee River, the dam has an authorized power installation of 90,000 kw., which can be increased to a possible ultimate of 150,000 kw. The reservoir at the dam adds 370,000 acre-feet of water to controlled storage on the Tennessee River system.
Credit line
Photo12/Heritage Images/Heritage Art
Reference
HRM22A79_112
Model release
NA
Property release
NA
License type
Rights managed
Available size
113,8Mb (2,6Mb) / 23,9in x 18,5in / 7182 x 5538 (300dpi)