Title
Construction of the Kilsby Tunnel on the London & Birmingham Railway, 8 July 1839. Artist: John Cooke Bourne
Caption
Construction of the Kilsby Tunnel on the London & Birmingham Railway, 8 July 1837 (1839). Robert Stephenson (1803-1859) was appointed chief engineer of the London & Birmingham Railway (LBR), the first railway into London. Running between Curzon Street Station, Birmingham, and Euston Station, London, the 112 mile long line took 20,000 men nearly five years to build, at a cost of five and a half million pounds. The excavation of the tunnel at Kilsby, Northamptonshire was one of the greatest engineering challenges on the LBR, due to problems with quicksand. The LBR opened on 17 September 1838. From Drawings of the London and Birmingham Railway by J Bourne, 1839.
Oxford Science Archive
Date
1839
Credit line
Photo12/Heritage Images
Reference
HRM19B64_146
Model release
No
License type
Rights managed
Available size
30,1Mb (3,9Mb) / 10,0in x 11,6in / 3014 x 3490 (300dpi)