Caption
Room is being renovated, plastered wall with sheetrock, wooden structure under ceiling, preparation for ceiling panels, working materials on the floor
Date
Feb 12, 2026
Credit line
Photo12/ImageBROKER/Wilfried Wirth
Reference
BRK26I34_159
Model release
NA
Property release
No
License type
Rights managed
Available size
103.8Mb (34.6Mb) / 24.6in x 16.4in / 7378 x 4919 (300dpi)