Caption
Night work during the renovation of the A40 motorway between Mülheim-Winkhausen and Essen-Ost, the asphalt surface was renewed at 5.8 kilometers, with so-called whisper asphalt, open-pored asphalt, in both directions, a total of over 110, 000 square meters, road rollers, a full week of closure, with severe traffic obstructions in the Ruhr area, Essen, North Rhine-Westphalia, Germany
Date
Jul 26, 2026
Credit line
Photo12/ImageBROKER/Jochen Tack
Reference
BRK26I08_353
Model release
No
Property release
No
License type
Rights managed
Available size
141.7Mb (47.2Mb) / 28.7in x 19.2in / 8619 x 5746 (300dpi)