Caption
New power line from Birkenfeld to Ötisheim in the Enzkreis district, 14-kilometre 380-kV line from transmission system operator TransnetBW for a secure power supply. The new extra-high-voltage line is due to be connected to the grid this year, the lines are currently being installed, Pforzheim, Baden-Württemberg, Germany
Date
Mar 26, 2024
Credit line
Photo12/ImageBROKER/Arnulf Hettrich
Reference
BRK26I03_373
Model release
NA
Property release
No
License type
Royalty free
Available size
103.1Mb (34.4Mb) / 24.5in x 16.3in / 7349 x 4902 (300dpi)