Caption
Horb high bridge construction site. After completion in 2028, the bridge will relieve the city of Horb from through traffic. The 667 meter long and up to 90 meters high Neckar Valley Bridge on the B 32 federal road is expected to cost around 167 million euros. Drone photo. Horb am Neckar, Baden-Württemberg, Germany
Date
Jul 16, 2026
Credit line
Photo12/ImageBROKER/Arnulf Hettrich
Reference
BRK26H35_029
Model release
No
Property release
No
License type
Royalty free
Available size
30.8Mb (10.3Mb) / 12.3in x 9.7in / 3698 x 2909 (300dpi)