Oberhausen, North Rhine-Westphalia, Germany - Emscher conversion, new Emscher AKE sewer, here the new Oberhausen pumping station, Germany's largest wastewater pumping station, uses 10 pumps to pump up to 16, 500 litres of wastewater per second from a depth of around 40 metres. The ecological conversion of the Emscher system consists of the construction of a central wastewater treatment system in the Ruhr region, the construction of sewers and the renaturalisation of the Emscher and its tributaries
Caption

Oberhausen, North Rhine-Westphalia, Germany - Emscher conversion, new Emscher AKE sewer, here the new Oberhausen pumping station, Germany's largest wastewater pumping station, uses 10 pumps to pump up to 16, 500 litres of wastewater per second from a depth of around 40 metres. The ecological conversion of the Emscher system consists of the construction of a central wastewater treatment system in the Ruhr region, the construction of sewers and the renaturalisation of the Emscher and its tributaries

Date

May 25, 2021

Credit line

Photo12/ImageBROKER/Rupert Oberhäuser

Reference

BRK26E29_152

Model release

NA

Property release

No

License type

Rights managed

Available size

122.6Mb (40.9Mb) / 17.9in x 26.7in / 5356 x 8003 (300dpi)

Keywords

deserted meter color concrete clock time of day time construction site new building modification construction building architecture industry forty water river body of water ecological conservation environment protection ecological Ruhr district North Rhine-Westphalia German colorful pump Europe construction work facility waterway water treatment industrial ecofriendly ecology infrastructure construction industry european sewage renaturation burden organic water protection contamination preparation Germany exterior view sewerage depth flood control project industrial building second renaturated paint pump station Oberhausen contaminated Emscher Central Europe Emscher sewer state sector Public services Wastewater treatment Sewer Wast water facade Tributary Concrete building wastewater-free Facade coating Emscher conversion Infrastructure project no one metre colour watch building site new construction alteration Construction site structure waterfront waters nature protection environmental protection Ruhr area NRW colourful annex canal water purification eco-friendly effluent stress pollution German Federal Republic exterior sewerage system flood protection renaturalised pumping station dirty Middle Europe Services of general interest Wast water channel Dirty water front No People construction area conversion 40 environmental conservation Ruhr Federal State of North Rhine-Westphalia coloured complex water canal environmentally friendly wastewater polluting Republic of Germany outdoor shot flood prevention pump works polluted Wastewater frontage nobody Ruhr region North-Rhine Westphalia colored channel Environmental friendly FRG exterior photograph uninhabited Ruhrgebiet Colourfully outdoor photo empty colorfully variegated multicoloured multi-coloured multi-colored different coloured meters colors clocks times of day construction sites new buildings modifications constructions buildings industries rivers ecologically pumps construction works facilities waterways water treatments infrastructures construction industries sewages burdens contaminations preparations exterior views sewerages depths projects industrial buildings seconds paints pump stations facades Tributaries Concrete buildings metres colours watches building sites new constructions canals effluents water canals Waste water outdoor shots BRD exterior photographs outdoor photos Many-colored water body Water area open water Europe's sewer flood water control façade

Please log in to download the high resolution file