Caption
Horb high bridge construction site. Once completed in 2028, the bridge will relieve the town of Horb of through traffic. The 667-metre-long and up to 90-metre-high Neckar Valley Bridge on the B 32 federal road is set to cost around 167 million euros. Horb, Baden-Württemberg, Germany
Date
Jul 01, 2025
Credit line
Photo12/imageBROKER/Arnulf Hettrich
Reference
BRK26B43_178
Model release
No
Property release
No
License type
Royalty free
Available size
31.0Mb (3.6Mb) / 14.6in x 8.2in / 4394 x 2469 (300dpi)