Horb high bridge construction site. Once completed in 2028, the bridge will relieve the town of Horb of through traffic. The 667-metre-long and up to 90-metre-high Neckar Valley Bridge on the B 32 federal road is set to cost around 167 million euros. Horb, Baden-Württemberg, Germany
Caption

Horb high bridge construction site. Once completed in 2028, the bridge will relieve the town of Horb of through traffic. The 667-metre-long and up to 90-metre-high Neckar Valley Bridge on the B 32 federal road is set to cost around 167 million euros. Horb, Baden-Württemberg, Germany

Date

Jul 01, 2025

Credit line

Photo12/imageBROKER/Arnulf Hettrich

Reference

BRK26B43_178

Model release

No

Property release

No

License type

Royalty free

Available size

31.0Mb (3.6Mb) / 14.6in x 8.2in / 4394 x 2469 (300dpi)

Please log in to download the high resolution file