Caption
Spectators, teethers during the demolition of the 120 meter long motorway bridge of the A516, across Teutoburger Straße in Oberhausen-Sterkrade, the bridge, built in 1970, was severely damaged, traffic continues to roll on the still existing West Bridge, after demolition, the eastern part is rebuilt using a process that is unique in the world to date, 40 meter long precast concrete beams are assembled one after the other, reducing construction time from 24 to 7 months, after the completion of this bridge, the western part will also be rebuilt, North Rhine-Westphalia, Germany
Date
Jan 16, 2026
Credit line
Photo12/imageBROKER/Jochen Tack
Reference
BRK26B23_061
Model release
No
Property release
No
License type
Rights managed
Available size
172,3Mb (11,4Mb) / 31,7in x 21,1in / 9504 x 6336 (300dpi)